Projects / Czechia · Siting
Temelin Rolls-Royce SMR
CEZ and Rolls-Royce SMR Early Works Contract (24 Apr 2026) launching at Temelin: site-specific design and permitting preparation.
Current status
- How current
- General record check . Bounded evidence review . 3 of 8 listed sources have a publication or document date recorded here; the newest is 9 Oct 2026. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
Newest recorded development . Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- Oct 2026 · Regulatory step: ČEZ submits EIA documentation for the Temelín Rolls-Royce SMR. ČEZ submitted EIA documentation for the Temelín Rolls-Royce SMR to the Ministry of the Environment. Source: World Nuclear News: ČEZ submits EIA documentation for the Temelín Rolls-Royce SMR to the Ministry of the Environment. Updates entry
- Next dated milestone
- Planned step: 2027 (target). Temelín SMR EIA process expected to be completed. This is not an achieved milestone. Source: World Nuclear News: ČEZ submits EIA documentation for the Temelín Rolls-Royce SMR to the Ministry of the Environment.
- Selected limitations
- Thermal output is not recorded on this project.
- No operator is recorded.
- The mapped point is not an exact surveyed coordinate.
- Same design
- 6 tracked: 5 siting. Separately: 1 suspended. 65 tracked at siting across all designs. Recorded stages, not proof of current activity.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
- Reactor type
- Pressurized water reactor. How it works, with a 3D view.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
Distinct from conventional Temelin PWRs and from Wylfa. Included with explicit above-300 MWe capacity-check note. An April 2026 early works contract covers permitting documentation and is not an investment decision; the ministry expects the first SMR next to Temelín in the late 2030s.
Key facts
- Design
- Rolls-Royce SMR (SMR)
- Technology
- Pressurized water reactor (PWR) · light water. The 2024 SMR Technology Catalogue describes a three-loop pressurized water reactor, so no integral layout is recorded.
- Reactor vessel of this design
- 7.82 m tall, 4.2 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 79.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale - Operator(s)
- Not recorded
- Vendor for linked design
- Rolls-Royce SMR
- Design origin
- United Kingdom: where the design's vendor is recorded, not where parts are made · See designs from this origin on a 3D globe
- Location
- Temelin SMR early-works area · Czechia · precision: site area (named plant, laboratory, base, port, campus or parcel)
NuclearChain reactors export point for the Temelín SMR entry at the existing Temelín plant (CC BY 4.0, derived from GEM's Global Nuclear Power Tracker); site-area point, distinct from the large Temelín units. - Coordinates
- 49.1762884, 14.3776989 · site-area point (approximate)
- Electrical capacity
- 470 MWe (net) · scope: module
- Thermal capacity
- Not recorded
- Modules planned
- Not recorded
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- high
- Record reviewed
- 2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes
Temelin Rolls-Royce SMR is recorded at Temelin SMR early-works area, South Bohemian Region, Czechia. Operator: No operator is recorded. Recorded vendor: Rolls-Royce SMR. Stage: Siting. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).
Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'temelin-nuclear-power-plant-smr' (49.1762884, 14.3776989)
Recorded electrical output is 470 MWe (net), scope module. Module count is not recorded. Thermal output is not recorded on this project. The linked design record states 1358 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Reactor supplier
- Vendor for the linked designRolls-Royce SMR
- Contractor
Source-backed project statement The 24 April 2026 early-works contract covers engineering and permitting preparation. It does not establish an EPC award or permission to begin reactor construction. ČEZ: Temelín SMR project advances to next phase; World Nuclear News: ČEZ submits EIA documentation for the Temelín Rolls-Royce SMR to the Ministry of the Environment
- Fuel
- Fuel form stated for Rolls-Royce SMRUO2
The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. ČEZ: Temelín SMR project advances to next phase; MPO: Czech Republic will develop further SMR sites; World Nuclear News: ČEZ submits EIA documentation for the Temelín Rolls-Royce SMR to the Ministry of the Environment; ČEZ additional Czech SMR locations
- Programs and agreements naming the project
- Cooperation agreement or MOU; activeCzech Industry Ministry, ČEZ and Rolls-Royce SMR memorandum to prepare additional SMR sites
Not found in the sources we checked (3): Customer or offtaker; Funding and government decisions; Comparable schedule revision
- Customer or offtaker
The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. ČEZ: Temelín SMR project advances to next phase; MPO: Czech Republic will develop further SMR sites; ČEZ additional Czech SMR locations; World Nuclear News: ČEZ submits EIA documentation for the Temelín Rolls-Royce SMR to the Ministry of the Environment
- Funding and government decisions
The reviewed sources do not establish a project-specific financing commitment or amount. General company backing, ownership and policy support do not by themselves establish allocated or paid project funding. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. ČEZ: Temelín SMR project advances to next phase; MPO: Czech Republic will develop further SMR sites; World Nuclear News: ČEZ submits EIA documentation for the Temelín Rolls-Royce SMR to the Ministry of the Environment
- Comparable schedule revision
Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. MPO: Czech Republic will develop further SMR sites; World Nuclear News: ČEZ submits EIA documentation for the Temelín Rolls-Royce SMR to the Ministry of the Environment; ČEZ: Temelín SMR project advances to next phase
Not recorded in SMRMap's reviewed evidence (2): Operator or intended licensed owner; Site host or owner
- Operator or intended licensed owner
- Site host or owner
Timeline
Recorded developments
- · Regulatory step
ČEZ submits EIA documentation for the Temelín Rolls-Royce SMR
Targets
Planned, target and estimated dates are not achievements or commitments.
- Target · Planned step
Temelín SMR EIA process expected to be completed
This project’s dated entries are in Updates, filtered to this project. New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Assessments of the design (not of this site)
(2)
- Rolls-Royce SMR Generic Design Assessment — applies to the design, not to a site
Design assessment sought · Under review · ONR/EA (UK)
Generic Design Assessment of the Rolls-Royce SMR design by the UK regulators. ONR's page (read 3 October 2026) shows Step 1 from April 2022 to April 2023, Step 2 to July 2024 with published Step 2 statements, and Step 3 under way since July 2024. A GDA assesses the generic design only; it is not permission for any site, construction or operation, and no Step 3 conclusion is recorded here. The reactors index, fetched 5 October 2026, still lists this as the active assessment and does not record a Step 3 conclusion. Re-read on 28 October 2026, ONR's page still describes the assessment as ongoing.
Sources: ONR Generic Design Assessment: Rolls-Royce SMRStatus confirmed on against ONR Generic Design Assessment: Rolls-Royce SMR. This confirms the recorded status only; the general record check date remains separate.
- Rolls-Royce SMR UK Generic Design Assessment, Step 2 — applies to the design, not to a site
Design assessment · Review completed (not an approval) · ONR/EA (UK) · completed 30 Jul 2024
The UK regulators completed Step 2 of their three-step Generic Design Assessment of the Rolls-Royce SMR on 30 July 2024 and issued Step 2 statements. Step 2 began on 3 April 2023, after Step 1 from April 2022 to April 2023. Step 3, the detailed assessment, began in July 2024 and is recorded separately as under way. Completing Step 2 is not a Design Acceptance Confirmation or permission for any site.
Sources: Environment Agency: assessing new nuclear reactor designs; ONR Generic Design Assessment: Rolls-Royce SMR; Environment Agency and Natural Resources Wales: GDA Step 2 of the Rolls-Royce SMR
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(5 notes)
- Evidence review. ČEZ and Rolls-Royce SMR signed an Early Works Contract on 24 April 2026 so that project, technical and licensing documentation for permits to build a Rolls-Royce SMR at Temelín, Czech Republic, can begin; ČEZ holds about 20% of Rolls-Royce SMR. ČEZ (in Czech) calls it an engineering contract with no equipment deliveries, and neither an investment decision nor a start of construction; the preparatory work covers environmental impact assessment documentation, inputs for nuclear and building permit procedures and related design work at Temelín. ČEZ signed an SMR memorandum with the Ministry of Industry and Trade the same day, and the ministry's 21 July 2026 release says the first SMR should be built at Temelín in the second half of the 2030s. ČEZ says each Rolls-Royce SMR plant will produce 470 MWe but does not say whether this is net, so the stored 'net' basis is not supported by an opened source; the Rolls-Royce SMR contract page returned an access refusal (HTTP 403). No opened source names ČEZ, or anyone, as the intended operator: ČEZ is the contracting developer, so the stored operator_ids is not supported, and no unit count at Temelín is stated (the ministry's three sites for up to six units is a fleet figure). The stored design, vendor, 470 MWe module rating and siting stage stay. The next documentary decision is the EIA process for the Temelín SMR, followed by ČEZ's investment decision. Last checked 19 Oct 2026. ČEZ: Temelín SMR project advances to next phase; MPO: Czech Republic will develop further SMR sites
What would change this
The Ministry of the Environment's EIA record for the Temelín SMR, a SÚJB siting license application, or a ČEZ investment decision naming the unit count would change this record. Next scheduled check: 19 Jan 2027.
- Next decision and prerequisites. After the comment period on the EIA documentation closes on 18 November 2026, the Ministry of the Environment moves to an expert review and its final EIA opinion, which World Nuclear News reports is expected by the end of 2027. ČEZ says its current contract is not an investment decision. The 2024 notification gave construction from 2029 and operation from 2034; the industry ministry's July 2026 release places the first SMR at Temelín in the second half of the 2030s. Last checked 23 Oct 2026. Nový jaderný zdroj SMR v lokalitě Temelín (EIA record MZP528); World Nuclear News: ČEZ submits EIA documentation for the Temelín Rolls-Royce SMR to the Ministry of the Environment; ČEZ: Temelín SMR project advances to next phase; Závěr zjišťovacího řízení: Nový jaderný zdroj SMR v lokalitě Temelín; MPO: Czech Republic will develop further SMR sites
What would change this
Issue of the expert review or the ministry's final EIA opinion for the Temelín SMR, or a ČEZ investment decision. Next scheduled check: 25 Nov 2026.
- Permissions and public process. The national EIA record for the Temelín SMR shows ČEZ's notification published in November 2024 with comments to 19 December 2024, a screening conclusion published in July 2025, and the EIA documentation published on 19 October 2026 with written comments open to 18 November 2026. The ministry's 9 October 2026 letter says the public, authorities and municipalities may comment within 30 days. This is environmental assessment, not a permit; ČEZ says nuclear and building permit filings are still being prepared. Last checked 23 Oct 2026. Nový jaderný zdroj SMR v lokalitě Temelín (EIA record MZP528); „Nový jaderný zdroj SMR v lokalitě Temelín“ – rozeslání a zveřejnění informace o dokumentaci (Č. j. MZP/2026/910/3565); ČEZ: Temelín SMR project advances to next phase
What would change this
The expert review (posudek), public hearing or the ministry's final EIA opinion for the Temelín SMR. Next scheduled check: 25 Nov 2026.
- Site dependencies (land, grid, water). The ministry's July 2025 screening conclusion places the Temelín SMR in the Temelín energy complex next to the existing plant, the Hněvkovice and Kořensko reservoirs and the Kočín substation, an area long used for power and heat with the needed infrastructure. ČEZ told World Nuclear News in October 2026 that its surveys show water availability is not an obstacle. These are the developer's planned arrangements under assessment, not a water permit or grid agreement. Last checked 23 Oct 2026. Závěr zjišťovacího řízení: Nový jaderný zdroj SMR v lokalitě Temelín; World Nuclear News: ČEZ submits EIA documentation for the Temelín Rolls-Royce SMR to the Ministry of the Environment
What would change this
The ministry's final EIA opinion or a water-use permit and grid connection agreement for the Temelín SMR. Next scheduled check: 23 Apr 2027.
- Spent fuel, waste and closure. The July 2025 screening conclusion required ČEZ's EIA documentation to describe radioactive waste management and the spent fuel management concept for the chosen SMR type, and the transport routes for fuel, spent fuel and radioactive waste. The documentation published in October 2026 is the place where ČEZ answers this; its content was not among the sources reviewed, and no storage or disposal arrangement is shown in the sources reviewed. Last checked 23 Oct 2026. Závěr zjišťovacího řízení: Nový jaderný zdroj SMR v lokalitě Temelín
What would change this
The ministry's EIA opinion or the published documentation's chapter on spent fuel and radioactive waste. Next scheduled check: 23 Apr 2027.
Evidence dates
(3 of 8 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(8)
- Rolls-Royce SMR Czech Early Works Contract (company, accessed 1 Oct 2026)
- ČEZ: Temelín SMR project advances to next phase (company, accessed 2 Oct 2026)
- MPO: Czech Republic will develop further SMR sites (government, accessed 2 Oct 2026)
- ČEZ additional Czech SMR locations (company, accessed 1 Oct 2026)
- World Nuclear News: ČEZ submits EIA documentation for the Temelín Rolls-Royce SMR to the Ministry of the Environment (news report, accessed 14 Oct 2026)
- Nový jaderný zdroj SMR v lokalitě Temelín (EIA record MZP528) (government, published 9 Oct 2026, accessed 23 Oct 2026)
- Závěr zjišťovacího řízení: Nový jaderný zdroj SMR v lokalitě Temelín (government, published Jul 2025, accessed 23 Oct 2026)
- „Nový jaderný zdroj SMR v lokalitě Temelín“ – rozeslání a zveřejnění informace o dokumentaci (Č. j. MZP/2026/910/3565) (government, published 9 Oct 2026, accessed 23 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Temelin Rolls-Royce SMR — https://smrmap.com/projects/temelin-rolls-royce-smr/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Temelin Rolls-Royce SMR”. Record reviewed 2 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/temelin-rolls-royce-smr/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.