Designs

Aurora

Compact fast fission powerhouse. Public materials cite a class of up to about 75 MWe. That ceiling is not stored as a module rating, and the first-of-a-kind output may differ. Labeled microreactor/compact class on SMRMap (not a large SMR).

Reactor type
Sodium-cooled fast reactor. How it works, with a 3D view.
Projects
Construction: Oklo Aurora-INL. Furthest recorded stage of 4 using this design. Development status as stated: Detailed design.
Evidence
4 sources; first primary source: Oklo Aurora-INL PDSA approval announcement. Record reviewed 7 Oct 2026.

Key facts

Class
Microreactor
Technology
Sodium-cooled fast reactor (SFR)
Coolant
Sodium
Spectrum
Fast
Developer / vendor(s)
Oklo Inc.
Electrical output range or ceiling
Public materials cite a class of up to about 75 MWe. That ceiling is not stored as a module rating. Exact first-of-a-kind output may differ.
Fuel form
metal fuel
Enrichment
HALEU, recycled fuel or other qualified fuels
Development status (as stated)
Detailed design
Inclusion basis
Labeled microreactor
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
7 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

Agreements naming this design (2)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(4)

Evidence and open questions

(2 notes)
  • Evidence review. Oklo's Aurora powerhouse page (undated, captured 19 October 2026) describes Aurora as Oklo's fast fission power plant: a metal-fueled, sodium-cooled fast reactor that can run on high-assay low-enriched uranium, recycled fuel and other qualified fuels, providing power and heat. It gives no power rating. The October 2024 ARIS record lists Oklo as developer with a fast spectrum, metal fuel and 'Detailed Design' status. Oklo's 11 June 2026 release says DOE's Idaho Operations Office approved the preliminary documented safety analysis for the Aurora powerhouse at INL under DOE's Reactor Pilot Program, a DOE authorization step rather than an NRC license, and Oklo's Idaho page says construction began in 2025 with commercial deployment targeted for 2028. Oklo's product page names INL, Ohio and Eielson Air Force Base as deployments. Stored vendor, sodium-cooled fast-reactor family, fast spectrum, metal fuel and design status stay; the module rating stays unset. Last checked 19 Oct 2026. oklo.com: Aurora; Oklo Aurora-INL PDSA approval announcement; Oklo: Idaho projects and deployment page (Aurora-INL powerhouse status)
    What would change this

    An Oklo or regulator specification identifying the exact Aurora configuration and its per-module electrical or thermal rating, distinct from the 75 MWe class ceiling. A site license and simultaneous disclosure of both ratings are not prerequisites; retain unstated gross/net basis. Next scheduled check: 19 Jan 2027.

  • Module rating: Not disclosed in the reviewed evidence. None of Oklo's current pages opened (the product page, the June 2026 safety-analysis release, the Idaho deployment page and two 2025 releases) states an Aurora power rating. An October 2024 ARIS record carries an earlier configuration's figures, which are not republished here and are not taken as the current module rating. Last checked 19 Oct 2026. oklo.com: Aurora
    What would change this

    An Oklo or regulator specification identifying the exact Aurora configuration and its per-module electrical or thermal rating, distinct from the 75 MWe class ceiling. A site license and simultaneous disclosure of both ratings are not prerequisites; retain unstated gross/net basis. Next scheduled check: 19 Jan 2027.

Regulatory actions

Compare reviews and approvals across designs

Environmental decision

  • DOE Aurora-INL B5.26 environmental categorical exclusion — Oklo Aurora-INL
    Environmental decision · Issued / approved · U.S. Department of Energy, Idaho Operations Office · decided 20 Jul 2026
    DOE Idaho approved environmental determination DOE-ID-INL-26-018 on 20 July 2026 for the proposed Aurora-INL reactor construction, installation and operation scope under B5.26. The document describes anticipated activities and a planned construction period; it is an environmental determination, not evidence that reactor construction occurred, an approval of the preliminary safety analysis, or authority to load fuel or operate.
    Sources: DOE Aurora-INL B5.26 environmental determination, DOE-ID-INL-26-018