Projects / United States · Siting

Oklo Aurora campus, Pike County, Ohio

One southern Ohio project, distinct from Aurora-INL and from Eielson.

Current status

Stage
Siting
How current
General record check . Bounded evidence review . 1 of 3 listed sources has a publication or document date recorded here: 12 Nov 2026. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

Newest recorded development . Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
1 Feb 2024 · Contract: Oklo SODI land option for two Ohio powerhouses. Option and right of first refusal for two powerhouses at the former Portsmouth site. Source: Oklo SODI land-rights agreement. Updates entry
More on this development

Later company materials describe a larger phased campus on this same effort.

Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • The mapped point is not an exact surveyed coordinate.
Same design
4 tracked: 1 construction, 2 siting, 1 announced. 65 tracked at siting across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Sodium-cooled fast reactor. How it works, with a 3D view.

Description

A 2024 SODI option covered land for two powerhouses at the former Portsmouth site. Oklo's current Ohio page describes the same Pike County effort as a phased campus of up to 1.2 GW with Meta as customer: Oklo says the agreement provides a mechanism for Meta to prepay for power and provide early funding, which Oklo will use to secure nuclear fuel and advance Phase 1, and Oklo's powerhouses would sell into PJM with a long-term power purchase agreement anticipated. Oklo says it will pursue an NRC commercial license. Its public page, rechecked 15 October 2026, now gives a consistent schedule: pre-construction in 2027, general construction in late 2028/early 2029, the first phase online as early as 2030 and the full 1.2 GW target by 2034. These are company targets, not achieved construction or permission to build. The construction window is not stored as an exact start date. A parenthetical '16-unit' jobs example is not stored as a module count.

Key facts

Design
Aurora (Microreactor)
Technology
Sodium-cooled fast reactor (SFR) · sodium
Operator(s)
Oklo Inc.
Vendor for linked design
Oklo Inc.
Location
Pike County / former Portsmouth site (Oklo) · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
NuclearChain CC BY 4.0 sites pin for Piketon (position_approximate=0 in that export). SMRMap treats it as a site-area pin for the former Portsmouth reservation, not a powerhouse footprint. Not Oklo headquarters.
Coordinates
39.0124, -83.0008 · site-area point (approximate)
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Labeled microreactor
Confidence
medium
Record reviewed
10 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Oklo Aurora campus, Pike County, Ohio is recorded at Pike County / former Portsmouth site (Oklo), Ohio, United States. Operator: Oklo Inc.. Recorded vendor: Oklo Inc.. Stage: Siting. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: NuclearChain data exports, NuclearChain sites.csv row 'piketon-nuclear-power-plant' (39.0124, -83.0008)

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Operator or intended licensed owner
Reactor supplier
Customer or offtaker
  • Prospective customer / offtaker (binding offtake not established)Meta Platforms · sourceThe Ohio project page describes Meta’s access through an anticipated long-term PPA. A signed PPA or delivered power is not established.
Source-backed project statement

Oklo's Ohio project page, rechecked 15 October 2026, says Oklo and Meta are partnering on a 1.2 GW campus in southern Ohio to support Meta's data centers, with Meta prepaying for power and providing early funding. Oklo's powerhouses would sell into the PJM market and Meta would pay Oklo for that power through an anticipated long-term power purchase agreement. The agreement is not stated as signed. Oklo Ohio clean energy campus

Funding and government decisions

Source-backed project statement Oklo's Ohio project page says its agreement with Meta provides a mechanism for Meta to prepay for power and provide early-stage funding for the Pike County Aurora deployment, and that the facilities are financed through private investment and commercial arrangements including customer commitments. This is a customer prepayment and early-funding mechanism with no amount stated and no disbursement reported. The page's multi-billion-dollar figure is a potential scale, not committed money. Oklo Ohio clean energy campus

Fuel
  • Fuel form stated for Aurorametal fuel
  • Enrichment stated for AuroraHALEU, recycled fuel or other qualified fuels
Project fuel information is described in the source-backed statement below.
Source-backed project statement

Oklo and Centrus's joint release of 12 November 2026 (published on Centrus's site) says Oklo signed multiple definitive, multi-year contracts with Centrus for HALEU, with Oklo prepaying for future deliveries to support construction of new Centrus enrichment capacity; the purchase is supported by Meta's prepayment for power and secures fuel for the first phase of Oklo's planned 1.2 GW Ohio campus. The contracts include enough HALEU for up to five Aurora powerhouses for multiple years, a figure the release gives for the contracts as a whole, which it says also cover future Aurora projects and later refuelling of Aurora-INL, so how many of the five are for Ohio is not stated. Deliveries from Centrus's American Centrifuge Plant in Pike County are scheduled to begin in 2029. The contracts formalize a June 2026 letter of intent. The release gives no tonnage, price or contract value, and does not say fuel has been delivered or that a license for the Ohio campus has been applied for. Oklo and Centrus: definitive HALEU supply contracts, including fuel for the Ohio Aurora campus (joint release, 12 November 2026)

Not found in the sources we checked (2): Contractor; Comparable schedule revision
Contractor

Oklo's Ohio project page says Oklo plans to work with regional partners to prioritize Ohio-based contractors, trades and suppliers, without naming any, and Oklo's 1 February 2024 release names the Southern Ohio Diversification Initiative as the land-option counterparty. Neither names an engineering, early-works or construction contractor for the Pike County campus. Oklo Ohio clean energy campus; Oklo SODI land-rights agreement

Comparable schedule revision

Comparable schedule revision not established. Oklo's Ohio project page gives one schedule for the Pike County campus: pre-construction in 2027, general construction in late 2028 or early 2029, first phase operating in 2030 and full 1.2 GW by 2034. Oklo's 1 February 2024 land-rights release gives no construction or operation date. With one set of targets there is no dated revision. Oklo Ohio clean energy campus

Not recorded in SMRMap's reviewed evidence (2): Site host or owner; Programs and agreements naming the project
Site host or owner
Programs and agreements naming the project

Timeline

Recorded developments

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(4 notes, 1 not yet reviewed)
  • Evidence review. Oklo proposes a phased campus of Aurora powerhouses in Pike County, Ohio, scaling to up to 1.2 GW; its undated Ohio page gives no unit count or per-unit rating. Meta is the customer: its agreement with Oklo provides prepayment for power and early funding for Phase 1, Oklo's powerhouses would sell into the PJM market and a long-term power purchase agreement is anticipated. Oklo says it will construct and operate the units and will pursue an NRC commercial license; the page targets pre-construction and site characterization in 2027, general construction in late 2028/early 2029, a first phase as early as 2030 and the full 1.2 GW by 2034. The site history is the Option and Right of First Refusal with SODI for land at the former Portsmouth site near Piketon, announced on 1 February 2024 for two powerhouses. The stored Aurora design, Oklo as vendor and operator, Meta as customer and the siting stage stay, and capacity stays unstored because 1.2 GW is an 'up to' campus ceiling, not a plant rating. The next documentary decision is an NRC license application for the southern Ohio deployments. Last checked 19 Oct 2026. Oklo Ohio clean energy campus; Oklo SODI land-rights agreement
    What would change this

    An NRC license application (or docketed pre-application filing) naming the Pike County site, or a signed Oklo-Meta power purchase agreement, would change this record. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites. Oklo's Ohio page says pre-construction and site characterization will begin in 2027, general construction in late 2028 or early 2029, and the first phase is targeted online as early as 2030, with the full 1.2 GW by 2034. These are company targets. The page says Oklo will pursue an NRC commercial license for the powerhouses but names no application date. Last checked 23 Oct 2026. Oklo Ohio clean energy campus
    What would change this

    An NRC application for the Ohio campus, the start of site characterization, or a revised Oklo schedule. Next scheduled check: 23 Apr 2027.

  • Permissions and public process. Oklo's Ohio project page, rechecked in October 2026, says Oklo will pursue an NRC commercial license for the Aurora powerhouses planned in southern Ohio and is advancing permitting preparation and community engagement, with planned information sessions and open houses. It names no filed NRC application, state permit or local agreement, so the project has no stated permission in this source. Last checked 23 Oct 2026. Oklo Ohio clean energy campus
    What would change this

    An NRC application or pre-application filing for the Pike County Aurora campus, or a state or county permit decision. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water). Oklo announced on 1 February 2024 that the Southern Ohio Diversification Initiative granted it an option and right of first refusal to buy land at the former Portsmouth Gaseous Diffusion Plant site near Piketon for two powerhouses, in exchange for an upfront fee. Its current Ohio page says Oklo is working with PJM and the utility AEP on an updated interconnection scheme. An option is not a completed purchase, and the page describes interconnection as work in progress, not a signed agreement. Last checked 23 Oct 2026. Oklo SODI land-rights agreement; Oklo Ohio clean energy campus
    What would change this

    Exercise of the land option, or a PJM interconnection agreement for the Pike County campus. Next scheduled check: 23 Apr 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(1 of 3 sources with a publication or document date)
Latest dated listed source publication: Oklo and Centrus: definitive HALEU supply contracts, including fuel for the Ohio Aurora campus (joint release, 12 November 2026): 12 Nov 2026.Latest dated recorded event: Oklo SODI land option for two Ohio powerhouses: 1 Feb 2024.2 of 3 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(3)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Oklo Aurora campus, Pike County, Ohio — https://smrmap.com/projects/oklo-ohio-pike/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Oklo Aurora campus, Pike County, Ohio”. Record reviewed 10 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/oklo-ohio-pike/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.