Hermes / KP-FHR
Fluoride-salt-cooled high-temperature reactor family. Hermes 1 is a non-power test reactor (~35 MWth); Hermes 2 is permitted by the NRC as two non-power test reactors of 35 MWth each; Kairos states it will supply up to 50 MW to the TVA grid from a single reactor. The NRC says Hermes 1 will not produce electricity. Its final environmental assessment for Hermes 2 records Kairos's statement that Hermes 2 will produce electricity but is categorized as a non-power reactor. No module electrical rating is recorded.
- Reactor type
- Fluoride salt-cooled high-temperature reactor. How it works, with a 3D view.
- Projects
- Construction: 2 projects.
- Evidence
- 4 sources; first primary source: NRC Kairos Hermes construction permit materials. Record reviewed 10 Oct 2026.
Key facts · Tracked projects · Agreements · Sources · Evidence · Regulatory actions · Its projects in the table · Compare with other designs
Key facts
- Class
- SMR
- Technology
- Fluoride-salt-cooled high-temperature reactor (FHR)
- Coolant
- Molten salt
- Spectrum
- Thermal
- Developer / vendor(s)
- Kairos Power
- Module thermal
- 35 MWth (nameplate; basis unspecified)
- Fuel form
- TRISO fuel particles in carbon-matrix pebbles
- Enrichment
- High Assay Low Enriched Uranium (HALEU)
- Inclusion basis
- SMR by regulator classification
- Confidence
- high
- Record reviewed
- 10 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(1 without a known value)
- Module electrical
- Not recorded
Tracked deployment projects
- Kairos Hermes 1 — Construction · United States
- Kairos Hermes 2 — Construction · United States
Agreements naming this design (1)
Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.
- Kairos Power and BWXT commercial TRISO fuel development collaboration — Research program · Status not established · announced 3 Sep 2025
Concerns United States
Design sources
(4)
- NRC Kairos Hermes construction permit materials (regulator, accessed 14 Oct 2026)
- NRC: Hermes 2 – Kairos Application (page updated 15 September 2026) (regulator, accessed 10 Oct 2026)
- Kairos Power: Google, Kairos Power, TVA Collaborate to Meet America’s Growing Energy Needs (18 August 2025) (company, accessed 18 Oct 2026)
- NRC: Environmental Assessment and Finding of No Significant Impact for the Construction Permits and Environmental Review Exemptions for the Kairos Hermes 2 Test Reactors, Final Report (ML24240A034) (regulator, dated Aug 2024, accessed 24 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. The NRC Hermes page (updated 15 September 2026) says the NRC issued a construction permit for the Hermes test reactor to Kairos Power LLC on December 14, 2023, and describes Hermes as a low-power test reactor supporting Kairos Power's fluoride salt-cooled, high-temperature reactor (KP-FHR) technology, at 35 MWth with no electricity production, using HALEU TRISO particles in carbon-matrix pebbles. The NRC Hermes 2 page (updated 15 September 2026) records construction permits issued on November 21, 2024 for two low-power test reactors of 35 MWth each with a shared Rankine steam conversion system. Kairos Power's 18 August 2025 release says a TVA power purchase agreement will take up to 50 MW from Hermes 2 in Oak Ridge and that Kairos will increase Hermes 2 output from 28 MW to 50 MW from a single reactor, with operations scheduled for 2030; that company plan differs from the two-reactor configuration in the NRC permits, which list no amendment. Construction permits are site-specific permissions for test reactors, not a design certification for a commercial KP-FHR. Deployment links supported: Hermes 1 and Hermes 2. Stored vendor, FHR family, molten-salt coolant, 35 MWth, TRISO pebble fuel and HALEU stay supported; the stored thermal spectrum is not stated in any opened source. A thermal-only electrical basis fits Hermes 1, which the NRC says will not produce electricity. It does not fit Hermes 2: the NRC page lists a shared steam conversion system, and the NRC's August 2024 final environmental assessment records Kairos's statement that Hermes 2 will produce electricity while categorized as non-power under 10 CFR 50.22. Last checked 19 Oct 2026. NRC Kairos Hermes construction permit materials; NRC: Hermes 2 – Kairos Application (page updated 15 September 2026); Kairos Power: Google, Kairos Power, TVA Collaborate to Meet America’s Growing Energy Needs (18 August 2025); NRC: Environmental Assessment and Finding of No Significant Impact for the Construction Permits and Environmental Review Exemptions for the Kairos Hermes 2 Test Reactors, Final Report (ML24240A034)
What would change this
An NRC construction-permit amendment for Hermes 2's single-reactor 50 MW configuration, or an operating license application for Hermes 1, which would update the per-reactor rating and electrical role. Next scheduled check: 19 Jan 2027.
Regulatory actions
Compare reviews and approvals across designs
Construction applications and decisions
- Kairos Hermes 2 construction permit — Kairos Hermes 2
Construction permission · Issued / approved · NRC · decided 21 Nov 2024 · submitted 14 Jul 2023 · permit CPTR-7, CPTR-8 · docket 50-611, 50-612 · ADAMS ML24324A021, ML24324A022 · 89 FR 94767
The NRC issued construction permits CPTR-7 and CPTR-8 for the two-unit Hermes 2 test reactor facility on 21 November 2024. Operation needs separate operating licenses.
Sources: Federal Register 89 FR 94767 (29 Nov 2024): Hermes 2 test reactor facility construction permits; NRC Kairos Hermes construction permit materials; U.S. NRC: Kairos Hermes 2 construction permit - Kairos Hermes 1 construction permit — Kairos Hermes 1
Construction permission · Issued / approved · NRC · decided 14 Dec 2023 · submitted 29 Sep 2021 · permit CPTR-6 · docket 50-7513 · ADAMS ML23338A258 · 88 FR 88137 · 91 FR 28629
The NRC issued construction permit CPTR-6 for the Hermes non-power test reactor on 14 December 2023. A 13 May 2026 order extended the latest construction completion date from 31 December 2026 to 30 April 2029. Operation needs a separate operating license.
Sources: Federal Register 88 FR 88137 (20 Dec 2023): Hermes test reactor construction permit; Federal Register 91 FR 28629 (18 May 2026): Hermes test reactor construction completion date extension; NRC Kairos Hermes construction permit materials; U.S. NRC: Kairos Hermes 1 construction permit