Projects / Myanmar · Announced

Myanmar 110 MW SMR project (two RITM-200N; site not named)

Myanmar's 110 MW SMR project, for which Rosatom says two RITM-200N reactors are planned, is one announced project with no site yet named.

Current status

Stage
Announced
How current
Record checked · Evidence reviewed · Next recheck due
Development and review dates

Newest recorded development . 1 of 5 listed sources has a publication or document date recorded here: 24 Aug 2026. Status not rechecked since the record check; this project is not covered by the nightly status check. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
Reported 24 Aug 2026 · Recorded development: Report: Rosatom expects Myanmar survey contract by end of 2026, site work in 2027. Atomic Energy 2.0, relaying Strana Rosatom, reported that Rosatom expects to sign a contract for primary engineering surveys by the end of 2026 and begin site work in 2027. Source: Atomic Energy 2.0 (relaying Strana Rosatom): Rosatom to begin engineering surveys at the Myanmar small NPP site in 2027 (published 24 Aug 2026). Updates entry
More on this development

These remain plans; the site is not named.

Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • No map pin is shown for this record.
  • State or province is not recorded.
  • Not yet recorded for this stage: Site location recorded as disclosed (not stated in the sources read). Not recorded does not mean zero or that none exists; the description and sources may say more.
Same design
3 tracked: 1 construction, 1 licensing, 1 announced. 96 tracked at announced across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Integral pressurized water reactor. How it works, with a 3D view.
Schematic of CAREM-25, this type's example. A single pressure vessel holds the core below helical steam generators, with a steam dome at the top.
Schematic of CAREM-25, this type's example.

Description

A March 2025 Myanmar-Russia intergovernmental agreement covers a 110 MW SMR project; Rosatom says two RITM-200N reactors are planned and site work could start in 2027. The site is not named. Two modules are the announced configuration, not two built reactors, and this is not a program aggregate. On 19 August 2026 the Russian prime minister said implementation of the agreements was starting; the site was still not named. A 24 August 2026 report, relaying Strana Rosatom, says Rosatom expects a primary engineering-survey contract by the end of 2026 and site work in 2027. Possible expansion to 330 MW remains a later option; the initial announced configuration remains two units and the site is unnamed.

Key facts

Design
RITM-200N (SMR)
Technology
Integral pressurized water reactor (iPWR) · light water
Reactor vessel of this design
7.5 m tall, 3.4 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 71.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures appear on SMRMap's pages and are not part of its data downloads. Quoted source material keeps its own rights.
All vessels to scale
Operator(s)
Not recorded
Vendor for linked design
Rosatom
Design origin
Russia: where the design's vendor is recorded, not where parts are made · See designs from this origin on a 3D globe
Location
Myanmar SMR site (not disclosed) · Myanmar · precision: no site named
Searchable without an invented map pin.
Coordinates
No site named, no map pin
Electrical capacity
110 MWe (gross/net unspecified) · scope: plant
Thermal capacity
Not recorded
Modules planned
2
Record reviewed
6 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Myanmar 110 MW SMR project (two RITM-200N; site not named) is recorded at Myanmar SMR site (not disclosed), state or province not recorded, Myanmar. Operator: No operator is recorded. Recorded vendor: Rosatom. Stage: Announced. Location precision: no site named; no site named, no map pin.

Recorded electrical output is 110 MWe (gross/net unspecified), scope plant. Modules planned: 2. Thermal output is not recorded on this project. The linked design record states 190 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project. The linked design record states 55 MWe (gross); the project figure is kept separate.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Reactor supplier
  • Vendor for the linked designRosatom
Not found in the sources we checked (5): Customer or offtaker; Contractor; Funding and government decisions; Fuel; Comparable schedule revision
Customer or offtaker

World Nuclear News reports of 5 March 2025 and 25 August 2026 and the Atomnaya energiya 2.0 reports of 19 and 24 August 2026 name no buyer of power from the Myanmar SMR project and no site. The Russian president's remark about supplying Myanmar's economy with energy and Rosatom's reference to customers setting the pace do not identify an offtaker or terms. WNN: Myanmar and Russia sign SMR cooperation agreement; WNN: Myanmar SMR site work could start in 2027

Contractor

The 5 March 2025 World Nuclear News report says Rosatom's director general and Myanmar's science minister signed the intergovernmental agreement for a 110 MW SMR project, and the 24 August 2026 Atomnaya energiya 2.0 report says Rosatom, the vendor, expects to sign a contract for initial engineering surveys by the end of 2026. That survey contract is not yet signed, and no engineering or construction contractor is named. WNN: Myanmar and Russia sign SMR cooperation agreement; Atomic Energy 2.0 (relaying Strana Rosatom): Rosatom to begin engineering surveys at the Myanmar small NPP site in 2027

Funding and government decisions

The 5 March 2025 and 25 August 2026 World Nuclear News reports and the August 2026 Atomnaya energiya 2.0 reports describe the intergovernmental agreement, an expected survey contract and the RITM-200N configuration but state no amount, lender or financing terms for the Myanmar project. WNN: Myanmar and Russia sign SMR cooperation agreement

Fuel
No fuel form or enrichment is recorded on the linked design profile.No project-specific fuel supply arrangement is recorded as a structured fact.

World Nuclear News of 25 August 2026 describes RITM-200N reactors adapted from the icebreaker RITM-200, a design statement. None of the four reports read names a fuel manufacturer, quantity or delivery for the Myanmar project. WNN: Myanmar SMR site work could start in 2027

Comparable schedule revision

Comparable schedule revision not established. The 5 March 2025 report dates the agreement without a construction year. The August 2026 reports say Rosatom expects to sign a survey contract by the end of 2026 and begin site work in 2027, with Rosatom's chief calling site entry essentially the start of construction. The 2027 site-work target is stated consistently and not revised, and construction has not begun. WNN: Myanmar and Russia sign SMR cooperation agreement; Atomic-energy.ru: Russia starts implementation of the Myanmar agreements (19 August 2026); Atomic Energy 2.0 (relaying Strana Rosatom): Rosatom to begin engineering surveys at the Myanmar small NPP site in 2027; WNN: Myanmar SMR site work could start in 2027

Not recorded in SMRMap's reviewed evidence (4): Project proposer or applicant; Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
Project proposer or applicant
No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
Operator or intended licensed owner
Site host or owner
Programs and agreements naming the project

Timeline

Recorded developments

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(7 notes)

Evidence dates

(1 of 5 sources with a publication or document date)
Latest dated listed source publication: Atomic Energy 2.0 (relaying Strana Rosatom): Rosatom to begin engineering surveys at the Myanmar small NPP site in 2027: 24 Aug 2026.Latest dated recorded event: Report describes Rosatom survey-contract and 2027 site-work plans for Myanmar: 24 Aug 2026.4 of 5 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(5)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Myanmar 110 MW SMR project (two RITM-200N; site not named) — https://smrmap.com/projects/myanmar-ritm-smr/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Myanmar 110 MW SMR project (two RITM-200N; site not named)”. Record reviewed 6 Oct 2026. https://smrmap.com/projects/myanmar-ritm-smr/ (accessed [date]).

“Record reviewed” is the record review date; the evidence review, individual sources and later additions keep their own dates. Add the date you read the page; save a PDF if you need a copy of it.

Record details
Inclusion basis
Vendor SMR claim, capacity checked
Confidence (as stored in the record)
medium

Data fingerprint 0153352d9753fff813ac32edec0a3ffbf1d8b7c7ee6420defec355f03d9ef915; build 2026-11-24. It identifies the underlying data collections, not an archived page or a download checksum. The build date is not a source review date.