Project TETRA / TETRA-1 pilot at Texas A&M RELLIS
DOE's January 2026 worker-safety variance names TETRA-1 at Texas A&M RELLIS; Terrestrial’s January agreement connects the pilot to IMSR technology.
Current status
- How current
- General record check . Bounded evidence review . 1 of 5 listed sources has a publication or document date recorded here: 8 Jan 2026. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Electrical output is not recorded.
- Thermal output is not recorded on this project.
- The mapped point is not an exact surveyed coordinate.
- State or province is not recorded.
- Same design
- 3 tracked: 1 siting, 2 announced. 96 tracked at announced across all designs. Recorded stages, not proof of current activity.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
- Reactor type
- Molten salt reactor. How it works, with a 3D view.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
DOE's July 2026 Reactor Pilot Program update lists Terrestrial Energy's TETRA as a 200 W thermal graphite-moderated uranium tetrafluoride reactor with its site to be determined. The similar name and technology suggest a connection, but these sources do not explicitly confirm identical project and phase scope. The dated site statements remain an apparent discrepancy, not proof of relocation. The 200 W figure is attributed to the July selection and is not stored as this project's capacity. This announced demonstration is separate from the commercial RELLIS IMSR proposal. The worker-safety variance and OTA pathway do not establish reactor construction or operating permission.
Key facts
- Design
- IMSR (Integral Molten Salt Reactor) (SMR)
- Technology
- Molten salt reactor (MSR) · molten salt
- Reactor vessel of this design
- 18 m tall, 4.1 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 337.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale - Operator(s)
- Terrestrial Energy
- Vendor for linked design
- Terrestrial Energy
- Location
- Texas A&M RELLIS campus — TETRA-1 planned site · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
Reuse the existing shared RELLIS campus pin (Texas A&M-RELLIS Energy Proving Ground); DOE lists TETRA-1 at the RELLIS campus address, and the reactor footprint is not published. - Coordinates
- 30.642075, -96.468275 · site-area point (approximate)
- Electrical capacity
- Not recorded · scope: module
- Thermal capacity
- Not recorded
- Modules planned
- Not recorded
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 2 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes
Project TETRA / TETRA-1 pilot at Texas A&M RELLIS is recorded at Texas A&M RELLIS campus — TETRA-1 planned site, state or province not recorded, United States. Operator: Terrestrial Energy. Recorded vendor: Terrestrial Energy. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).
Coordinate source: NuclearChain data downloads (CC BY 4.0), NuclearChain sites.csv row 'aalo-atomics-texas-a-and-m-nuclear-power-plant' (30.6420749, -96.4682751)
Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Operator or intended licensed owner
- OperatorTerrestrial Energy
- Reactor supplier
- Vendor for the linked designTerrestrial Energy
- Funding and government decisions
Source-backed project statement World Nuclear News reported on 8 January 2026 that Terrestrial Energy executed an agreement with DOE for Project TETRA under the Advanced Reactor Pilot Program, under which each company is responsible for all costs of designing, manufacturing, constructing, operating and decommissioning its test reactor. Terrestrial therefore funds TETRA itself, with no amount disclosed. DOE authorization is not DOE funding. Terrestrial Energy, Oklo execute DOE agreements; DOE advanced-reactor worker-safety variance — named project sites
- Fuel
- Fuel form stated for IMSR (Integral Molten Salt Reactor)Molten salt fuel
- Enrichment stated for IMSR (Integral Molten Salt Reactor)Standard Assay Low-Enriched Uranium (SALEU), under 5% uranium-235 (issuer specification, not delivered fuel).
World Nuclear News of 8 January 2026 says TETRA uses standard-assay low-enriched uranium tetrafluoride fuel below 5% U-235 and that Terrestrial was separately selected for DOE's Fuel Line Pilot Program. These are a design specification and a company-level program selection. No source read names a fuel supplier, fabrication or delivery for TETRA-1. Terrestrial Energy, Oklo execute DOE agreements; DOE advanced-reactor worker-safety variance — named project sites
Not found in the sources we checked (3): Customer or offtaker; Contractor; Comparable schedule revision
- Customer or offtaker
DOE's January 2026 worker-safety variance lists a TETRA-1 reactor at Texas A&M RELLIS, and World Nuclear News of 8 January 2026 describes TETRA as a pilot reactor to support Terrestrial's IMSR licensing. Neither names a recipient of power or heat. A DOE pilot-program slide filed in July 2026 describes TETRA as a 200 W thermal test reactor, which implies no saleable output. Terrestrial's own release could not be read. DOE advanced-reactor worker-safety variance — named project sites; Terrestrial Energy, Oklo execute DOE agreements; DOE Office of Nuclear Energy: Reactor Pilot Program Update, slides filed with the NRC (ADAMS ML26198A212)
- Contractor
World Nuclear News reported on 8 January 2026 that Terrestrial Energy executed an Other Transaction Authority agreement with DOE under which the department will review and authorize TETRA's design and operation. DOE is the authorizing body, and Texas A&M's June 2026 agreements, which support research tied to TETRA at RELLIS, are with the site host. No engineering or construction contractor for TETRA-1 is named. Terrestrial Energy, Oklo execute DOE agreements; America's Nuclear Energy Race Accelerates at Texas A&M-RELLIS; DOE advanced-reactor worker-safety variance — named project sites
- Comparable schedule revision
Comparable schedule revision not established. DOE's January 2026 variance memorandum and World Nuclear News of 8 January 2026 repeat the pilot program's goal of criticality for at least three unnamed test reactors by 4 July 2026, and neither gives a date for TETRA-1. No dated TETRA-1 milestone is stated, so no revision is shown. DOE advanced-reactor worker-safety variance — named project sites; Terrestrial Energy, Oklo execute DOE agreements
Not recorded in SMRMap's reviewed evidence (3): Project proposer or applicant; Site host or owner; Programs and agreements naming the project
- Project proposer or applicant
- No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
- Site host or owner
- Programs and agreements naming the project
Timeline
This timeline has no entries yet. Other dated information may appear in the description and checking notes.
New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Assessments of the design (not of this site)
(1)
- CNSC vendor design review, Phase 2 (IMSR400) — applies to the design, not to a site
Design assessment · Review completed (not an approval) · CNSC · completed Apr 2023
CNSC lists Phase 1 (executive summary dated November 2017) and Phase 2 (executive summary dated April 2023) of its pre-licensing vendor design review of Terrestrial Energy's IMSR400 among completed reviews. CNSC entered into the Phase 2 agreement with Terrestrial Energy on 9 May 2018; that agreement date is not the start of the whole review. The Phase 2 summary found no fundamental barrier to licensing within the reviewed topics and required further design and safety work. CNSC says a vendor design review does not certify a design, issue a license or bind later Commission decisions.
Sources: CNSC: vendor design review service agreements and completed reviews; CNSC: IMSR400 Phase 2 pre-licensing vendor design review summary
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(4 notes, 1 not yet reviewed)
- Evidence review. The readable DOE capture is a 10 CFR 851 worker-safety variance application. It lists a TETRA-1 reactor at the Texas A&M RELLIS Technology and Innovation Campus, 1041 Research Pkwy, Bryan, Texas. The same campus address is also listed for a PWR-5 reactor, which is not this record. The capture does not contain the word IMSR. Terrestrial Energy Inc. appears in the contractor list, but not in the same sentence as TETRA-1. The company page returned an access refusal (HTTP 403) and is not quoted. The street address is not turned into a map pin. The variance is not a reactor construction or operating permission. Last checked 20 Oct 2026. DOE advanced-reactor worker-safety variance — named project sites
What would change this
A readable Terrestrial or DOE notice that ties TETRA-1 to IMSR and states whether any reactor authorization, rather than a worker-safety variance, has been requested. Next scheduled check: 20 Jan 2027.
- Permissions and public process. World Nuclear News reported on 8 January 2026 that Terrestrial Energy executed an Other Transaction Authority agreement with DOE that sets up DOE review and authorization of the TETRA pilot reactor's design and safe operation under the Reactor Pilot Program. This is a DOE authorization pathway, not an NRC license, and these sources record no completed DOE safety approval or public comment process for TETRA. Last checked 23 Oct 2026. Terrestrial Energy, Oklo execute DOE agreements
What would change this
A DOE approval of a TETRA safety analysis or authorization to operate. Next scheduled check: 23 Jan 2027.
- Site dependencies (land, grid, water): Sources conflict. DOE's worker-safety variance package of 5 January 2026 lists the TETRA-1 reactor at the Texas A&M RELLIS campus, 1041 Research Parkway, Bryan, Texas, but DOE's July 2026 Reactor Pilot Program update filed with the NRC lists Terrestrial Energy's TETRA as 'Site: TBD'. The June 2026 Texas A&M ground lease for about 77 acres at RELLIS concerns Terrestrial's commercial IMSR plant, not clearly the pilot. The pilot's site is therefore unresolved in these sources. Last checked 23 Oct 2026. DOE advanced-reactor worker-safety variance — named project sites; DOE Office of Nuclear Energy: Reactor Pilot Program Update, slides filed with the NRC (ADAMS ML26198A212); America's Nuclear Energy Race Accelerates at Texas A&M-RELLIS
What would change this
A DOE or Terrestrial statement confirming the TETRA pilot's location. Next scheduled check: 23 Jan 2027.
- Spent fuel, waste and closure. World Nuclear News reported in January 2026, relaying DOE, that under the Reactor Pilot Program each selected company, including Terrestrial Energy for TETRA, is responsible for all costs of designing, building, operating and decommissioning its test reactor. That assigns decommissioning cost responsibility at program level; the sources do not describe how TETRA's fuel salt or waste would be stored or disposed of. Last checked 23 Oct 2026. Terrestrial Energy, Oklo execute DOE agreements
What would change this
A DOE or Terrestrial document describing TETRA's fuel-salt and waste disposition. Next scheduled check: 23 Jan 2027.
Not yet reviewed against sources: Next decision and prerequisites. An unreviewed question is unfinished research, not a finding that nothing exists.
Evidence dates
(1 of 5 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(5)
- DOE advanced-reactor worker-safety variance — named project sites (government, accessed 2 Oct 2026)
- Terrestrial Energy TETRA DOE agreement (company, accessed 2 Oct 2026)
- Terrestrial Energy, Oklo execute DOE agreements (news report, published 8 Jan 2026, accessed 23 Oct 2026)
- America's Nuclear Energy Race Accelerates at Texas A&M-RELLIS (government, accessed 1 Oct 2026)
- DOE Office of Nuclear Energy: Reactor Pilot Program Update, slides filed with the NRC (ADAMS ML26198A212) (government, accessed 15 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Project TETRA / TETRA-1 pilot at Texas A&M RELLIS — https://smrmap.com/projects/tetra-1-rellis/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Project TETRA / TETRA-1 pilot at Texas A&M RELLIS”. Record reviewed 2 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/tetra-1-rellis/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.