eVinci DOME nuclear test reactor

DOE's 1 July 2025 release conditionally selected Westinghouse to test an eVinci nuclear test reactor in the DOME facility at Idaho National Laboratory. The same release says the authorization process was still underway. It is not the Penn State FRONTIER proposal. The stated 5 MWe figure belongs to the commercial design, not a measured output of this test.

Stage
Announced
Design
eVinci (Microreactor)
Technology
Other · unknown
Operator(s)
—
Vendor(s)
Westinghouse Electric Company
Location
DOME test bed, Idaho National Laboratory · United States · precision: undisclosed
DOE names the DOME facility at Idaho National Laboratory. The 1 July 2025 release does not give a coordinate. This is not the Aurora or Kaleidos project pin.
Coordinates
undisclosed / not plotted
Electrical capacity
— · scope: module
Thermal capacity
—
Modules planned
1
Inclusion basis
microreactor_labeled
Confidence
medium
Last verified
2026-10-02 (publication/verification date)