Natrium
Sodium-cooled fast reactor with integrated energy storage: the recorded design output is 345 MWe (gross/net unspecified), with a separate 500 MWe storage-discharge peak. The NRC issued construction permit CPAR-1 for the specific Kemmerer Unit 1 project on 9 March 2026; that is construction permission, not an operating license or blanket approval for other Natrium sites. Separately, the UK regulators began a three-step Generic Design Assessment on 5 June 2026. The Environment Agency page updated 16 June 2026 describes Step 1 as preparatory work; this dated account does not establish completion of later steps or permission for a UK site.
- Reactor type
- Sodium-cooled fast reactor. How it works, with a 3D view.
- Projects
- Construction: Natrium Kemmerer Unit 1. Furthest recorded stage of 2 using this design.
- Evidence
- 6 sources; first primary source: NRC TerraPower Natrium / Kemmerer. Record reviewed 1 Oct 2026.
Key facts · Tracked projects · Agreements · Sources · Evidence · Regulatory actions · Its projects in the table · Compare with other designs
Key facts
- Class
- SMR
- Technology
- Sodium-cooled fast reactor (SFR)
- Coolant
- Sodium
- Spectrum
- Fast
- Developer / vendor(s)
- TerraPower
- Module electrical
- 345 MWe (gross/net unspecified)
- Module thermal
- 840 MWth (nameplate; basis unspecified)
- Peak electrical output
- 500 MWe, recorded separately from the electrical figure above. Peak with molten-salt energy storage discharge; not continuous nameplate.
- Fuel form
- Metallic uranium-zirconium (U-10Zr) HALEU fuel column with a sodium bond to HT9 cladding
- Enrichment
- HALEU
- Reactor vessel
- 20.4 m tall, 11.6 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 295.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.All vessels to scale10 m bar; a person 1.8 m tallNatrium
20.4 m tall, 11.6 m across - Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 1 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- Natrium Kemmerer Unit 1 — Construction · United States
- Meta–TerraPower initial dual-unit Natrium proposal — Announced · United States
Agreements naming this design
(9)
Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.
- TerraPower and SK Innovation term sheet to develop Korea's first commercial Natrium plant (2026) — Cooperation agreement or MOU · Active · announced Aug 2026
Concerns South Korea - TerraPower and Hyundai E&C framework agreement: EPC for up to eight Natrium reactors (2026) — Fleet agreement · Active · announced Aug 2026
Concerns United States - TerraPower, Evergy and Kansas Department of Commerce memorandum to explore siting a Natrium plant in Kansas — Cooperation agreement or MOU · Active · announced 23 Sep 2025
Concerns United States - TerraPower and KBR studies of potential UK sites for Natrium reactors (2025) — Feasibility or siting study · Active · announced Sep 2025
Concerns United Kingdom - Utah Office of Energy Development, TerraPower and Flagship Companies memorandum to explore siting a Natrium plant in… — Cooperation agreement or MOU · Status not established · announced 25 Aug 2025
Concerns United States - TerraPower–nVision Natrium development framework — Cooperation agreement or MOU · Status not established · announced 12 Feb 2025
Concerns United States - TerraPower–Sabey Data Centers exploratory Natrium memorandum — Cooperation agreement or MOU · Status not established · announced 21 Jan 2025
Concerns United States - ENEC ADVANCE program for advanced reactors and its COP28 SMR memoranda — Government program · Active · announced Dec 2023
Concerns United Arab Emirates - PacifiCorp and TerraPower joint study of up to five additional Natrium reactors by 2035 — Feasibility or siting study · Status not established · announced 27 Oct 2022
Concerns United States
Design sources
(6)
- NRC TerraPower Natrium / Kemmerer (regulator, accessed 1 Oct 2026)
- IAEA Advanced Reactors Information System (ARIS) (IAEA/NEA, accessed 1 Oct 2026)
- Federal Register 91 FR 12628 (16 Mar 2026): Kemmerer Power Station Unit 1 construction permit and record of decision (regulator, accessed 3 Oct 2026)
- NRC: TerraPower, LLC — Kemmerer Power Station Unit 1 Application (page updated 14 September 2026) (regulator, accessed 18 Oct 2026)
- Environment Agency: assessing new nuclear reactor designs (regulator, page updated 16 Jun 2026, accessed 28 Oct 2026)
- TerraPower construction start Kemmerer (company, accessed 17 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. The NRC Kemmerer Power Station Unit 1 page (last reviewed 14 September 2026, filed under past licensing activities) describes the construction permit application by TerraPower on behalf of US SFR Owner, LLC for a plant that would demonstrate the TerraPower and General Electric-Hitachi Natrium sodium fast reactor technology, a pool-type sodium fast reactor at 840 megawatts thermal with metallic U-10Zr HALEU fuel and molten-salt energy storage. Its milestones record the hearing on 4 March 2026 and the construction permit decision on 9 March 2026 as actual; that permit is a project permission for Kemmerer Unit 1, not a design certification. The Environment Agency page (last updated 16 June 2026) says the UK regulators began a three-step Generic Design Assessment of the TerraPower Natrium reactor on 5 June 2026, describes it as a 345 MWe sodium-cooled fast reactor with molten-salt energy storage designed by TerraPower LLC, and says Step 1 is preparatory. The opened sources link the design to the Kemmerer Unit 1 deployment; none names the Meta-TerraPower proposal. Stored vendor, SFR family, sodium coolant, fast spectrum, 840 MWth and fuel form stay supported; the stored 345 MWe is supported without a gross/net basis. The attached TerraPower release of 23 April 2026 states 345 MW with integrated storage that can boost output to 500 MW; the peak is not continuous reactor output. The Federal Register CPAR-1 notice could not be opened when checked, and the ARIS home page showed only its title, so neither was read. Last checked 19 Oct 2026. NRC: TerraPower, LLC — Kemmerer Power Station Unit 1 Application (page updated 14 September 2026); NRC TerraPower Natrium / Kemmerer; Environment Agency: assessing new nuclear reactor designs; TerraPower construction start Kemmerer
What would change this
The UK regulators' GDA Step 1 completion statement for Natrium, or a TerraPower or NRC document stating the gross or net basis of the 345 MWe rating. Next scheduled check: 19 Jan 2027.
Regulatory actions
Compare reviews and approvals across designs
Design assessment
- Natrium UK Generic Design Assessment — applies to the design, not to a site
Design assessment sought · Under review · ONR/EA (UK)
The UK regulators began a three-step Generic Design Assessment of TerraPower's Natrium on 5 June 2026, after ministers at the Department for Energy Security and Net Zero asked them to, following the department's review of TerraPower's application. Step 1 is preparatory. No step is recorded as completed, and the assessment is not permission for any UK site.
Sources: Environment Agency: assessing new nuclear reactor designsStatus confirmed on against Environment Agency: assessing new nuclear reactor designs. This confirms the recorded status only; the general record check date remains separate.
Construction applications and decisions
- TerraPower Natrium construction permit — Natrium Kemmerer Unit 1
Construction permission · Issued / approved · NRC · decided 9 Mar 2026 · submitted 28 Mar 2024 · permit CPAR-1 · docket 50-613 · ADAMS ML26034B247 · 91 FR 12628
The NRC issued construction permit CPAR-1 on 9 March 2026 to US SFR Owner, LLC (TerraPower) for Kemmerer Power Station Unit 1, after the Commission's 4 March 2026 decision on the uncontested hearing. The permit authorizes construction only; an operating license is a separate NRC decision.
Sources: Federal Register 91 FR 12628 (16 Mar 2026): Kemmerer Power Station Unit 1 construction permit and record of decision; NRC TerraPower Natrium / Kemmerer; U.S. NRC: Natrium Kemmerer Unit 1
Other applications and decisions
- Kemmerer Unit 1 exemption for energy-island work before a construction permit — Natrium Kemmerer Unit 1
Other regulatory action · Issued / approved · NRC · decided 7 May 2025 · submitted 28 Feb 2025 · docket 50-613 · 90 FR 20692
The Federal Register notice (90 FR 20692, 15 May 2025) states that the NRC issued an exemption on 7 May 2025, in response to TerraPower's 28 February 2025 request for US SFR Owner, LLC, modifying the definition of construction for Kemmerer Unit 1. It allows specified work for non-safety-related structures, systems and components on the energy island, such as pile driving and foundations, before a construction permit and without a limited work authorization. It is not a construction permit or operating authority.
Sources: Federal Register 90 FR 20692 (15 May 2025): US SFR Owner, LLC; Kemmerer Power Station, Unit 1; Exemption