Projects / Romania · Announced

Last Energy PWR-20 demonstrator at RATEN Mioveni (2022 plan)

Last Energy's PWR-20 demonstration proposal for RATEN's Mioveni nuclear platform in Romania is at the announced stage.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . None of the 3 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
Same design
6 tracked: 1 licensing, 2 siting, 3 announced. 96 tracked at announced across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Schematic of Rolls-Royce SMR, this type's example. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR, this type's example.

Description

In March 2022 Romania's government and RATEN said Last Energy would build a demonstrator on RATEN's Mioveni nuclear platform. Last Energy completed a CNCAN pre-authorization step for the PWR-20 in 2024 without naming a site, so current siting is unconfirmed. Separate from ALFRED at the same platform.

Key facts

Design
PWR-20 (Microreactor)
Technology
Pressurized water reactor (PWR) · light water. The 2024 SMR Technology Catalogue describes a single-loop pressurized water reactor, so no integral layout is recorded.
Reactor vessel of this design
8.9 m tall, 1.8 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 65.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale
Operator(s)
Not recorded
Vendor for linked design
Last Energy
Design origin
United States: where the design's vendor is recorded, not where parts are made · See designs from this origin on a 3D globe
Location
RATEN ICN Mioveni nuclear platform · Romania · precision: town or locality only
Town point from the Wikipedia article for Mioveni; the sources name the RATEN ICN nuclear platform at Mioveni, near Pitești. No parcel point is published, so this is a town-level point.
Coordinates
44.95694, 24.94056 · town-level point (approximate)
Electrical capacity
Not recorded · scope: module
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Labeled microreactor
Confidence
medium
Record reviewed
2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Last Energy PWR-20 demonstrator at RATEN Mioveni (2022 plan) is recorded at RATEN ICN Mioveni nuclear platform, Argeș, Romania. Operator: No operator is recorded. Recorded vendor: Last Energy. Stage: Announced. Location precision: town or locality only; town-level point (approximate). Other records at this site: ALFRED lead-cooled demonstrator at Mioveni (EAGLES-300 program).

Coordinate source: Wikipedia: Mioveni (article coordinates), Article coordinate 44.95694, 24.94056 on 'Mioveni', read 30 October 2026

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project. The linked design record states 80 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Reactor supplier
Fuel
  • Fuel form stated for PWR-20UO2 pellet / 17x17 grid
No project-specific fuel supply arrangement is recorded as a structured fact.

The March 2022 government and RATEN accounts of the Mioveni demonstrator and Last Energy's 7 October 2024 PWR-20 licensing release name no fuel manufacturer, quantity or delivery for the demonstrator. Fuel wording elsewhere on RATEN's news index concerns other reactor programs. Government of Romania: Prime Minister met representatives of Last Energy; Last Energy: enters authorization phase with nuclear regulator in Romania

Site host or owner
Programs and agreements naming the project
Not found in the sources we checked (4): Customer or offtaker; Contractor; Funding and government decisions; Comparable schedule revision
Customer or offtaker

The Government of Romania's 9 March 2022 item, RATEN's matching news item and Last Energy's 7 October 2024 release name no buyer of power or heat from a Mioveni demonstrator. The 2022 accounts cite Romania's energy independence as the purpose, and the 2024 release's industrial customers throughout Europe describe the company's market, not this site. Government of Romania: Prime Minister met representatives of Last Energy; Last Energy: enters authorization phase with nuclear regulator in Romania

Contractor

The Government of Romania's 9 March 2022 item and RATEN's news item say Last Energy's demonstrator would be developed on the Mioveni nuclear platform in collaboration with RATEN, the platform host. No engineering or construction contractor is named. Last Energy's 7 October 2024 release concerns CNCAN's pre-authorization review of the PWR-20 approach and does not name Mioveni. Government of Romania: Prime Minister met representatives of Last Energy; RATEN: Last Energy demonstrator on the Mioveni nuclear platform; Last Energy: enters authorization phase with nuclear regulator in Romania

Funding and government decisions

The Government of Romania's 9 March 2022 item says Last Energy is backed by investors involved in SpaceX projects and that the demonstrator adds to announced nuclear investments in Romania, but neither it, RATEN's item nor Last Energy's 7 October 2024 release states a funder, amount or award for the Mioveni demonstrator. Government of Romania: Prime Minister met representatives of Last Energy

Comparable schedule revision

Comparable schedule revision not established. The 9 March 2022 government item and RATEN's news item say a Mioveni demonstrator will be developed without giving a construction or operation year, and Last Energy's 7 October 2024 release dates a CNCAN pre-authorization step without naming Mioveni. No dated target exists in these sources, so no schedule revision is shown. Government of Romania: Prime Minister met representatives of Last Energy; Last Energy: enters authorization phase with nuclear regulator in Romania

Not recorded in SMRMap's reviewed evidence (1): Operator or intended licensed owner
Operator or intended licensed owner

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(5 notes, 1 not yet reviewed)
  • Evidence review. The March 2022 government and RATEN accounts describe a Last Energy demonstration proposal on the Mioveni nuclear platform in collaboration with RATEN. They identify a collaborator and platform host, without naming the reactor operator. Their phrase '20 MWh installed power' is not used as an electrical rating. Last Energy's October 2024 account concerns CNCAN pre-authorization of the PWR-20 approach and does not name Mioveni; it does not establish a project-specific permit, current selected site or operating appointment for this demonstrator. RATEN remains the recorded site host and Last Energy the project proposer. The operator and project output are unknown; the project remains announced. Last checked 19 Oct 2026. Government of Romania: Prime Minister met representatives of Last Energy; RATEN: Last Energy demonstrator on the Mioveni nuclear platform; Last Energy: enters authorization phase with nuclear regulator in Romania
    What would change this

    A CNCAN or RATEN document that names a site application or an authorization decision for the Mioveni demonstrator. Next scheduled check: 19 Jan 2027.

  • Site location recorded as disclosed. The 2022 government and RATEN statements name the Mioveni nuclear platform for the historical demonstrator proposal. This establishes a named installation, not a plot or coordinates; the map shows a town-level point for Mioveni. Current siting remains unconfirmed: the 2024 pre-authorization statement names no site. Last checked 19 Oct 2026. Government of Romania: Prime Minister met representatives of Last Energy; RATEN: Last Energy demonstrator on the Mioveni nuclear platform; Last Energy: enters authorization phase with nuclear regulator in Romania
    What would change this

    A CNCAN, RATEN or Last Energy statement confirming current siting, a changed platform or a specific plot for this historical proposal. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites. After the October 2024 pre-authorization step, Last Energy said it was working on the next licensing milestones in Romania's authorization phase. It named no application date, and the sources reviewed record no later licensing step. Last checked 23 Oct 2026. Last Energy: enters authorization phase with nuclear regulator in Romania
    What would change this

    A CNCAN authorization-phase filing or decision for the demonstrator. Next scheduled check: 21 Jan 2027.

  • Permissions and public process. Last Energy said in October 2024 that CNCAN had confirmed completion of the pre-authorization phase, finding the PWR-20 conceptual design and project approach credible, so the company could enter the authorization phase. A comfort letter is not a license; the release names no site or construction license application and no public consultation. Last checked 23 Oct 2026. Last Energy: enters authorization phase with nuclear regulator in Romania
    What would change this

    A CNCAN license application or decision for the Mioveni demonstrator. Next scheduled check: 21 Jan 2027.

  • Site dependencies (land, grid, water). The March 2022 government release says the demonstration would be conducted on RATEN's Mioveni nuclear platform. The sources describe no plot, grid connection or water arrangement for the unit. Last checked 23 Oct 2026. Government of Romania: Prime Minister met representatives of Last Energy
    What would change this

    A site license application or environmental assessment for the PWR-20 at Mioveni. Next scheduled check: 21 Jan 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(0 of 3 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: no date recorded.3 of 3 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(3)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Last Energy PWR-20 demonstrator at RATEN Mioveni (2022 plan) — https://smrmap.com/projects/last-energy-mioveni/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Last Energy PWR-20 demonstrator at RATEN Mioveni (2022 plan)”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/last-energy-mioveni/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.