Projects / United States · Construction

Last Energy PWR-5 pilot at Texas A&M-RELLIS

Last Energy's PWR-5 pilot at Texas A&M-RELLIS, selected for DOE's Reactor Pilot Program, is at construction stage, with its first phase limited to 100 kWth of low-power testing.

Current status

Stage
Construction
How current
General record check . Bounded evidence review . 2 of 8 listed sources have a publication or document date recorded here; the newest is 16 Dec 2025. Status not rechecked since then; the nightly status check covers this project.
Development and review dates

Newest recorded development . Next general check: . Next evidence or detail review: .

Permissions
Recorded: DOE PWR-5 Phase 1 environmental categorical exclusion (30 Sep 2026). All permissions and applications
Latest development
Announced 7 Oct 2026 · Announcement: Last Energy says DOE approved its PWR-5 final safety analysis. Last Energy said DOE approved its final Documented Safety Analysis for the PWR-5 pilot at Texas A&M-RELLIS. Source: Last Energy announces PWR-5 documented safety analysis approval. Updates entry
More on this development

The company says DOE readiness review and startup authorization are still ahead. The announcement does not establish operating authority or criticality.

Next dated milestone
First criticality: 2026 (target). Last Energy targets a PWR-5 criticality demonstration in 2026. This is not an achieved milestone. Source: Last Energy: Last Energy Announces Oversubscribed $100 Million Series C (published 16 Dec 2025); Last Energy announces PWR-5 documented safety analysis approval.
Selected limitations
  • Thermal output is not recorded on this project.
  • The mapped point is not an exact surveyed coordinate.
  • Expected for this stage but not recorded as a structured fact: Permission evidence appropriate to stage (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Operation or grid target (type stated) (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Pressurized water reactor. How it works, with a 3D view.

Description

Texas A&M reported facility construction under way in May 2026, so the project is shown at construction stage; completion of reactor installation, fuel loading and criticality are not established. Last Energy's 28 May statement says DOE approved a preliminary documented safety analysis, but the DOE letter was not opened. DOE's signed 30 September 2026 categorical exclusion DOE-ID-26-008 covers Phase 1 initial criticality and low-power testing as a proposed environmental action. Phase 1 is an open-pool, near-atmospheric-pressure research configuration limited to 100 kWth and fewer than 1,000 cumulative operating hours, with no grid electricity export. The 19.5 MWth design point and 5 MWe electrical description refer to later phases, not achieved or authorized Phase 1 output; each phase needs separate DOE authorization and an updated safety basis. Last Energy announced on 7 October that DOE approved the final documented safety analysis. The DOE approval letter and decision date were not opened, so this is a dated company claim. DOE readiness review and startup authorization still lie ahead. The environmental decision and safety-analysis claims are not operating authority or an NRC license. Last Energy says it holds a lease at Texas A&M-RELLIS and procured a full core load of low-enriched uranium fuel. It said in December 2025 that it expected a criticality demonstration in 2026. DOE startup authorization for criticality follows the readiness review that began after the October 2026 safety-analysis approval.

Key facts

Design
Last Energy PWR-5 (Microreactor)
Technology
Pressurized water reactor (PWR) · light water
Operator(s)
Last Energy
Vendor for linked design
Last Energy
Location
Texas A&M-RELLIS Energy Proving Ground · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
Shared campus pin for distinct company proposals. Coordinate is the NuclearChain CC BY 4.0 sites export pin for the Aalo Texas A&M discovery row (position_approximate=1), which sits on the RELLIS campus. It is not a reactor-building survey and is not a headquarters pin.
Coordinates
30.6420749, -96.4682751 · site-area point (approximate)
Electrical capacity
5 MWe (gross/net unspecified) · scope: module
Thermal capacity
Not recorded
Modules planned
1
Purpose
Research or test reactor
Construction start
2026Last Energy states it began PWR-5 construction at RELLIS
Inclusion basis
Labeled microreactor
Confidence
medium
Record reviewed
18 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Last Energy PWR-5 pilot at Texas A&M-RELLIS is recorded at Texas A&M-RELLIS Energy Proving Ground, Texas, United States. Operator: Last Energy. Recorded vendor: Last Energy. Stage: Construction. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate). Other records at this site: Aalo commercial proposal at Texas A&M-RELLIS, Kairos commercial proposal at Texas A&M-RELLIS, Natura MSR-100 proposal at Texas A&M-RELLIS, Terrestrial Energy IMSR at Texas A&M-RELLIS.

Coordinate source: NuclearChain data exports, NuclearChain sites.csv row 'aalo-atomics-texas-a-and-m-nuclear-power-plant' (30.6420749, -96.4682751)

Recorded electrical output is 5 MWe (gross/net unspecified), scope module. Modules planned: 1. Thermal output is not recorded on this project. The linked design record states 19.5 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Operator or intended licensed owner
Reactor supplier
Fuel
Project fuel information is described in the source-backed statement below.

Source-backed project statement Last Energy said on 15 October 2025 that it had procured a full-core load of fuel, and on 28 May 2026 that the fuel had been manufactured while authorization to receive fuel on site was still ahead. On 7 October 2026 it said the pilot uses low-enriched uranium tied to a commercial supply chain, without naming the supplier. Manufacture is not site delivery or loading. Last Energy: Last Energy Partners With Texas A&M to Build Microreactor at RELLIS Campus; Last Energy: company statement on PWR-5 preliminary documented safety analysis (28 May 2026); Last Energy announces PWR-5 documented safety analysis approval

Site host or owner
Programs and agreements naming the project
Not found in the sources we checked (4): Customer or offtaker; Contractor; Funding and government decisions; Comparable schedule revision
Customer or offtaker

Last Energy said on 15 October 2025 that the RELLIS pilot would demonstrate low-power criticality and the ability to generate electricity for commercial output, and on 28 May 2026 that its separate commercial plant is designed for industrial customers and data centers. Neither statement names a buyer of this pilot’s electricity or heat. Texas A&M is described as the lessor of the site, not as the offtaker. No power purchase agreement for this pilot is stated. Last Energy: Last Energy Partners With Texas A&M to Build Microreactor at RELLIS Campus; Last Energy: company statement on PWR-5 preliminary documented safety analysis (28 May 2026)

Contractor

Last Energy’s 15 October 2025 and 28 May 2026 releases say the company secured the site, advanced construction, and procured equipment. They name no engineering, FEED, or construction contractor and no contract value. Last Energy: company statement on PWR-5 preliminary documented safety analysis (28 May 2026)

Funding and government decisions

Last Energy said on 15 October 2025 that it had signed an Other Transaction Agreement with the Department of Energy. The releases reviewed state no amount, no payment, and no financing terms for the RELLIS pilot. Selection into the pilot program is not money paid. Last Energy: Last Energy Partners With Texas A&M to Build Microreactor at RELLIS Campus

Comparable schedule revision

Comparable schedule revision not established. The releases reviewed give a preliminary safety analysis approval announced on 28 May 2026 and a documented safety analysis approval announced on 7 October 2026. Those are successive documents, not two forecasts of one milestone. No operation date is revised in these texts. Last Energy: company statement on PWR-5 preliminary documented safety analysis (28 May 2026); Last Energy announces PWR-5 documented safety analysis approval

Not recorded in SMRMap's reviewed evidence (1): Project proposer or applicant
Project proposer or applicant
No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.

Timeline

Recorded developments

Earlier developments (1)

Targets

Planned, target and estimated dates are not achievements or commitments.

Permissions and applications

Environmental decision

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(7 notes)

Evidence dates

(2 of 8 sources with a publication or document date)
Latest dated listed source publication: Last Energy: Last Energy Announces Oversubscribed $100 Million Series C: 16 Dec 2025.Latest dated recorded event: Last Energy states it began PWR-5 construction at RELLIS: 2026; Last Energy announces DOE approval of PWR-5 final safety analysis: 7 Oct 2026; overlapping date precision — latest not uniquely established.6 of 8 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(8)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Last Energy PWR-5 pilot at Texas A&M-RELLIS — https://smrmap.com/projects/last-energy-pwr-5-rellis/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Last Energy PWR-5 pilot at Texas A&M-RELLIS”. Record reviewed 18 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/last-energy-pwr-5-rellis/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.