Projects / United States · Siting
Terrestrial Energy IMSR at Texas A&M-RELLIS
18 Jun 2026 ground lease and research agreements give Terrestrial Energy site control of about 77 acres at RELLIS for IMSR site characterization, environmental work, and testing.
Current status
- How current
- General record check . Bounded evidence review . None of the 3 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
Newest recorded development . Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- 18 Jun 2026 · Contract: Terrestrial Energy RELLIS ground lease. Ground lease and research agreements for about 77 acres. Source: America's Nuclear Energy Race Accelerates at Texas A&M-RELLIS. Updates entry
More on this development
Not a reactor license.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Electrical output is not recorded.
- Thermal output is not recorded on this project.
- No operator is recorded.
- The mapped point is not an exact surveyed coordinate.
- Same design
- 3 tracked: 1 siting, 2 announced. 65 tracked at siting across all designs. Recorded stages, not proof of current activity.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
- Reactor type
- Molten salt reactor. How it works, with a 3D view.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
Texas A&M has a campus-wide NRC early-site-permit pre-application, not an IMSR-specific application or permit. A future licensed operator, module count and MWe were not stated.
Key facts
- Design
- IMSR (Integral Molten Salt Reactor) (SMR)
- Technology
- Molten salt reactor (MSR) · molten salt
- Reactor vessel of this design
- 18 m tall, 4.1 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 337.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale - Operator(s)
- Not recorded
- Vendor for linked design
- Terrestrial Energy
- Location
- Texas A&M-RELLIS Energy Proving Ground · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
Shared campus pin for distinct company proposals. Coordinate is the NuclearChain CC BY 4.0 sites export pin for the Aalo Texas A&M discovery row (position_approximate=1), which sits on the RELLIS campus. It is not a reactor-building survey and is not a headquarters pin. - Coordinates
- 30.6420749, -96.4682751 · site-area point (approximate)
- Electrical capacity
- Not recorded · scope: unknown
- Thermal capacity
- Not recorded
- Modules planned
- Not recorded
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- medium
- Record reviewed
- 9 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes
Terrestrial Energy IMSR at Texas A&M-RELLIS is recorded at Texas A&M-RELLIS Energy Proving Ground, Texas, United States. Operator: No operator is recorded. Recorded vendor: Terrestrial Energy. Stage: Siting. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate). Other records at this site: Aalo commercial proposal at Texas A&M-RELLIS, Kairos commercial proposal at Texas A&M-RELLIS, Natura MSR-100 proposal at Texas A&M-RELLIS, Last Energy PWR-5 pilot at Texas A&M-RELLIS.
Coordinate source: NuclearChain data exports, NuclearChain sites.csv row 'aalo-atomics-texas-a-and-m-nuclear-power-plant' (30.6420749, -96.4682751)
Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Reactor supplier
- Vendor for the linked designTerrestrial Energy
- Fuel
- Fuel form stated for IMSR (Integral Molten Salt Reactor)Molten salt fuel
- Enrichment stated for IMSR (Integral Molten Salt Reactor)Standard Assay Low-Enriched Uranium (SALEU), under 5% uranium-235 (issuer specification, not delivered fuel).
Texas A&M System's 4 February 2025 and 18 June 2026 releases and the NRC's Texas A&M pre-application page name no fuel supplier, enrichment contract, allocation or delivery for the RELLIS IMSR. America's Nuclear Energy Race Accelerates at Texas A&M-RELLIS
- Site host or owner
- Site hostThe Texas A&M University System · source
Not found in the sources we checked (4): Customer or offtaker; Contractor; Funding and government decisions; Comparable schedule revision
- Customer or offtaker
Texas A&M System's 4 February 2025 news quotes Terrestrial Energy's chief executive saying an IMSR at RELLIS would provide clean, firm electricity for the ERCOT grid. ERCOT is the grid, not a buyer, and neither that page nor the 18 June 2026 agreements release names a power or heat buyer or agreement. Texas A&M System Goes Nuclear
- Contractor
Texas A&M System's 18 June 2026 release says ground-lease and research agreements give Terrestrial Energy site control of about 77 acres at RELLIS and support site characterization, environmental work and testing, and that Terrestrial opened its own engineering and project-management office there. These are a site lease and research agreements with the host and the developer's own office. The release names no engineering or construction contractor. America's Nuclear Energy Race Accelerates at Texas A&M-RELLIS
- Funding and government decisions
Texas A&M System's 18 June 2026 release says DOE selected Terrestrial Energy for its Reactor Pilot Program and that the RELLIS agreements support work linked to its DOE partnership projects TETRA and TEFLA. Program selection and partnership projects are not stated as money for the RELLIS IMSR, and no amount, award or disbursement is given. America's Nuclear Energy Race Accelerates at Texas A&M-RELLIS
- Comparable schedule revision
Comparable schedule revision not established. Texas A&M System's 4 February 2025 news says the first proving-ground reactors could be constructed within five years, a campus-level aim with no IMSR date. The NRC's pre-application page, last reviewed 15 September 2026, still shows a campus-wide early site permit submittal planned for the fourth quarter of 2025. Neither states an earlier and a later date for the same IMSR milestone. Texas A&M System Goes Nuclear; NRC pre-application activities: Texas A&M University System
Not recorded in SMRMap's reviewed evidence (3): Project proposer or applicant; Operator or intended licensed owner; Programs and agreements naming the project
- Project proposer or applicant
- No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
- Operator or intended licensed owner
- Programs and agreements naming the project
Timeline
Recorded developments
- · Contract
Terrestrial Energy RELLIS ground lease
This project’s dated entries are in Updates, filtered to this project. New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Assessments of the design (not of this site)
(1)
- CNSC vendor design review, Phase 2 (IMSR400) — applies to the design, not to a site
Design assessment · Review completed (not an approval) · CNSC · completed Apr 2023
CNSC lists Phase 1 (executive summary dated November 2017) and Phase 2 (executive summary dated April 2023) of its pre-licensing vendor design review of Terrestrial Energy's IMSR400 among completed reviews. CNSC entered into the Phase 2 agreement with Terrestrial Energy on 9 May 2018; that agreement date is not the start of the whole review. The Phase 2 summary found no fundamental barrier to licensing within the reviewed topics and required further design and safety work. CNSC says a vendor design review does not certify a design, issue a license or bind later Commission decisions.
Sources: CNSC: vendor design review service agreements and completed reviews; CNSC: IMSR400 Phase 2 pre-licensing vendor design review summary
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(4 notes, 1 not yet reviewed)
- Evidence review. The Texas A&M University System's story of 18 June 2026 says the System signed ground lease and research agreements with Terrestrial Energy Inc. that give the company site control over approximately 77 acres at Texas A&M-RELLIS in Bryan, Texas, and support site characterization, environmental evaluations, testing and research connected to its Integral Molten Salt Reactor (IMSR); the work follows a 2025 memorandum of understanding after Terrestrial joined the RELLIS Energy Proving Ground. The System's 4 February 2025 release quotes Terrestrial's chief executive on siting an IMSR plant at RELLIS to supply the local ERCOT grid, without a unit count or rating. Neither release names an intended licensed operator, and the instruments are a lease and research agreements, not a reactor license. The NRC's pre-application page (last updated 15 September 2026) describes a campus-wide early site permit pre-application by the System for multiple advanced reactors rated 10-1000 MWe gross, with ESP submittal planned for the fourth quarter of 2025, and names no vendor. The next documentary decision is the System's ESP application and its NRC docketing, or a Terrestrial filing for an IMSR at RELLIS. The stored IMSR design, Terrestrial as vendor and the siting stage stay; module count, output and operator stay unknown, and the opened sources do not show that the ESP application was submitted. Last checked 19 Oct 2026. America's Nuclear Energy Race Accelerates at Texas A&M-RELLIS; Texas A&M System Goes Nuclear; NRC pre-application activities: Texas A&M University System
What would change this
Texas A&M University System's early site permit application and the NRC's acceptance or docketing notice, or a Terrestrial Energy filing or agreement stating the IMSR unit count and output at RELLIS. Next scheduled check: 19 Jan 2027.
- Next decision and prerequisites. The next consequential steps shown are completion of Terrestrial Energy's site characterization under its June 2026 RELLIS lease and Texas A&M's early site permit application; the NRC page, updated 15 September 2026, still lists only pre-application activities and gives no filing date. The February 2025 announcement says the first reactors at the proving ground could be built within five years, a stated possibility rather than an IMSR schedule. Last checked 23 Oct 2026. NRC pre-application activities: Texas A&M University System; Texas A&M System Goes Nuclear; America's Nuclear Energy Race Accelerates at Texas A&M-RELLIS
What would change this
Texas A&M's ESP filing, or a Terrestrial Energy construction or license decision for RELLIS. Next scheduled check: 23 Apr 2027.
- Permissions and public process. The NRC's Texas A&M University System page, updated 15 September 2026, says the NRC is in pre-application activities with the System on a future early site permit for multiple advanced reactors at the RELLIS campus. Texas A&M's February 2025 announcement says the System began that process for the site where Terrestrial Energy proposed an IMSR plant. This campus-wide pre-application is not a filed application, a permit or a Terrestrial Energy-specific license, and these sources record no public consultation. Last checked 23 Oct 2026. NRC pre-application activities: Texas A&M University System; Texas A&M System Goes Nuclear
What would change this
Texas A&M's early site permit application for RELLIS, or a Terrestrial Energy license application naming the site. Next scheduled check: 23 Apr 2027.
- Site dependencies (land, grid, water). Texas A&M's 18 June 2026 release says ground lease and research agreements give Terrestrial Energy site control over about 77 acres at the RELLIS campus for site characterization, environmental evaluations, testing and research tied to its IMSR. The February 2025 announcement says power from the RELLIS proving ground could supply the ERCOT grid. A ground lease for characterization is site control, not a licensed site, and no interconnection or cooling-water arrangement is stated. Last checked 23 Oct 2026. America's Nuclear Energy Race Accelerates at Texas A&M-RELLIS; Texas A&M System Goes Nuclear
What would change this
An ERCOT interconnection request or agreement, or a license application naming the 77-acre RELLIS site. Next scheduled check: 23 Apr 2027.
Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.
Evidence dates
(0 of 3 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(3)
- America's Nuclear Energy Race Accelerates at Texas A&M-RELLIS (government, accessed 1 Oct 2026)
- Texas A&M System Goes Nuclear (government, accessed 1 Oct 2026)
- NRC pre-application activities: Texas A&M University System (regulator, accessed 9 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Terrestrial Energy IMSR at Texas A&M-RELLIS — https://smrmap.com/projects/terrestrial-imsr-rellis/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Terrestrial Energy IMSR at Texas A&M-RELLIS”. Record reviewed 9 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/terrestrial-imsr-rellis/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.