Who is involved in SMR projects

Proposers, operators, suppliers, customers, contractors, funders, fuel suppliers and agreements recorded for each of the 222 published projects, answered to one standard.

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. “Not recorded” is not a finding that none exists. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed. Each project page gives the cited source beside each answer, plus the linked design’s stated fuel.

Commercial source reviews

These counts cover all 222 published projects; the filters further down do not change them, while the research coverage below the table follows the filters. These counts are completed source reviews on the five commercial questions. A structured role, a policy link, a design fuel specification or a comparable schedule revision is not by itself a completed review. Read the terms of each supported statement: preparation, commitment and payment are different stages. An answer not found in the sources we checked stays unknown.

QuestionSupportedNot found in sources checkedUnreviewed
Customer or offtaker551625
Contractor721455
Funding811374
Project fuel commitment371805
Comparable schedule revision162024
All five questions26182623

Linked organizations, agreements and decisions

These counts cover named links in project records. The source reviews above also include statements without a linked organization or agreement, so their totals differ.

QuestionAll published projects (222)Licensing to operating (43)
Project proposer or applicant139 of 22226 of 43
Operator or intended licensed owner88 of 22239 of 43
Reactor supplier158 of 22238 of 43
Customer or offtaker18 of 222 (4 source-stated customer or offtaker; 14 prospective only)6 of 43 (2 source-stated customer or offtaker; 4 prospective only)
Contractor18 of 22217 of 43
Funding and government decisions26 of 22219 of 43
Fuel supplier named for this project16 of 22215 of 43
Programs and agreements naming the project53 of 22219 of 43

178 of 222 published projects (14 of 43 at licensing to operating) have no linked customer, contractor, funding or government decision in these counts. Their source reviews may still contain relevant statements; this is not a finding that no evidence exists. Advanced-stage projects are reviewed first; the evidence standard is the same for every project. A design’s stated fuel form is not a supply arrangement and is not counted as one.

Download the answers for all projects (CSV, one row per question and answer, including questions with no recorded answer) · Compare two to four projects · Documented schedule changes

By project

To find where a named organization holds a role, choose it under Organization and the role under Its role: both must belong to the same recorded relationship, which is marked in the row. Search matches project and participant names and displayed review statements; a mention does not establish a current role. “Has a recorded answer for” and “No recorded answer for” check the whole project, not the searched name: searching a company with Contractor chosen lists projects that mention the company and have some recorded contractor, who may be a different organization. Source statements in the table that name a company without a recorded role are not matched by Organization.

Showing 222 of 222 projects

ProjectCountryStageProposer or applicantOperatorSupplierCustomer or offtakerContractorFunding and government decisionsFuel supplierPrograms and agreementsComparable schedule revision
Aalo commercial proposal at Texas A&M-RELLISUnited StatesSitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded
  • Vendor for the linked designAalo Atomics

Not found in the sources we checked. The 4 February 2025 Texas A&M System announcement and the NRC pre-application page, last reviewed 15 September 2026, name no power or heat buyer, quantity or agreement for Aalo's pods at RELLIS. Aalo's remark that its technology will ultimately power data centers, and the statement that proving-ground power could supply the ERCOT grid, are general aims, not offtake agreements. Texas A&M is the site host, not a customer. Texas A&M System Goes Nuclear

Not found in the sources we checked. The 4 February 2025 Texas A&M System announcement and the NRC pre-application page, last reviewed 15 September 2026, name no engineering, licensing or construction contractor for Aalo's pods at RELLIS. The announcement says Aalo agreed to work with the System, the site host, to bring reactors to RELLIS and that the System had begun a campus early-site-permit process, which covers the campus rather than Aalo specifically. Texas A&M System Goes Nuclear

Not found in the sources we checked. The 4 February 2025 Texas A&M System announcement and the NRC pre-application page, last reviewed 15 September 2026, state no amount, grant, loan, investment or cost share for Aalo's RELLIS project. The early-site-permit process is a regulatory step, not a funding instrument, and the land offer is not stated as money. Texas A&M System Goes Nuclear

Not found in the sources we checked. The 4 February 2025 Texas A&M System announcement and the NRC pre-application page, last reviewed 15 September 2026, name no fuel supplier, fabrication, allocation or delivery for Aalo's pods at RELLIS. The announcement does not discuss fuel at all. Texas A&M System Goes Nuclear

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The 4 February 2025 Texas A&M System announcement says the first RELLIS reactors could be built within five years, and the NRC pre-application page, last reviewed 15 September 2026, still shows a campus early-site-permit submittal planned for the fourth quarter of 2025. Each target is stated once and they concern different milestones, so neither source revises a date for Aalo's pods. NRC pre-application activities: Texas A&M University System; Texas A&M System Goes Nuclear

Aalo fleet proposal at Idaho Falls Power's Energy Research ParkUnited StatesAnnounced
  • Project proposerAalo Atomics
Not recorded
  • Vendor for the linked designAalo Atomics

Source-backed project statement Idaho Falls Power announced on 16 September 2024 that it is negotiating a power purchase agreement with Aalo Atomics, which would give the city utility the right to eventually buy energy from Aalo's Idaho Falls project at its Energy Research Park. Idaho Falls Power is therefore a prospective buyer. The agreement was under negotiation, not signed, and Aalo's page the same day calls the instrument a memorandum of understanding. Idaho Falls Power negotiating agreement with Aalo Atomics

Not found in the sources we checked. Aalo's 16 September 2024 announcement says the seven Aalo-1 reactors for the Idaho Falls project would be built in Aalo's own Austin reactor factory. That is the vendor's manufacturing plan, not an outside engineering or construction appointment. Idaho Falls Power's announcement the same day and Aalo's July 2024 NRC engagement plan name no engineering, construction or other contractor for the Energy Research Park plant. Aalo Atomics: signs MOU with Idaho Falls Power for fleet of seven Aalo-1 reactors; Idaho Falls Power negotiating agreement with Aalo Atomics

Not found in the sources we checked. Aalo's 16 September 2024 announcement says the memorandum lets the project proceed to full construction only after cost and uncertainty milestones are met, and it states no amount. Idaho Falls Power's announcement the same day gives no price for power or the land lease, and Aalo's July 2024 NRC engagement plan discusses capital costs without a figure or funder for this plant. Aalo Atomics: signs MOU with Idaho Falls Power for fleet of seven Aalo-1 reactors; Aalo-1 regulatory engagement plan (ML24193A003)

Not found in the sources we checked. Aalo's July 2024 NRC engagement plan says the Aalo-1 uses uranium zirconium hydride fuel that does not depend on HALEU and that the reactors would be fueled on site. That is a design and plan description, not a supply commitment. Neither that plan nor the 16 September 2024 city and Aalo announcements name a fuel fabricator, quantity or delivery for the Idaho Falls reactors. Aalo-1 regulatory engagement plan (ML24193A003)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Not found in the sources we checked. On 16 September 2024 Idaho Falls Power said Aalo's Idaho Falls project is not expected to come online before 2030, while Aalo's announcement the same day said it was slated to go online before the end of the 2020s. These are two differing same-day statements of one online date, not a dated revision. Aalo's July 2024 NRC engagement plan says its unnamed-site Idaho Nuclear Project is to be operational by 2029. Idaho Falls Power negotiating agreement with Aalo Atomics; Aalo Atomics: signs MOU with Idaho Falls Power for fleet of seven Aalo-1 reactors; Aalo-1 regulatory engagement plan (ML24193A003)

Aalo Project Ascension power-reactor proposal at INLUnited StatesAnnounced
  • Project proposerAalo Atomics
Not recorded
  • Vendor named for this project (no design profile is linked)Aalo Atomics

Not found in the sources we checked. Aalo's 4 July 2026 announcement says the Project Ascension reactor will power an on-site data center in 2027 but names no customer, agreement or contracted quantity. Aalo's 30 July 2026 Crusoe partnership post describes a second reactor powering an on-site Crusoe Spark data center, but it does not name Project Ascension or Idaho National Laboratory, so Crusoe is not recorded as this project's customer. Aalo: first criticality post, including Project Ascension (4 July 2026); Aalo: Crusoe partnership (30 July 2026)

Not found in the sources we checked. Aalo's 4 July 2026 announcement says Aalo has begun work on its second reactor for Project Ascension on the Aalo-X campus at Idaho National Laboratory. Neither that post nor the 30 July 2026 Crusoe post names an outside engineering, construction or other contractor for Ascension. Aalo's statement that it built and operated its reactor itself refers to the earlier critical-test reactor. Aalo: first criticality post, including Project Ascension (4 July 2026)

Not found in the sources we checked. Aalo's 30 July 2026 post says the company has raised over $136 million from named investors. That is company funding, not money committed to Project Ascension. The 4 July 2026 post thanks the Department of Energy and Idaho National Laboratory for the criticality milestone but states no award, cost share or amount for Ascension. Aalo: Crusoe partnership (30 July 2026)

Not found in the sources we checked. Aalo's 4 July 2026 post says it built 10 MW worth of fuel assemblies for the critical-test reactor that had just reached criticality. Neither that post nor the 30 July 2026 post names a fuel supplier, allocation or delivery for the Project Ascension power reactor. Aalo: first criticality post, including Project Ascension (4 July 2026)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Aalo's 4 July 2026 post gives one target, power for an on-site data center in 2027, for Project Ascension. The 30 July 2026 post repeats 2027 for a Spark pilot and gives end-2029 for a broader pod deployment at Crusoe data centers, a different scope. One target stated once is not a revision of the same milestone. Aalo: first criticality post, including Project Ascension (4 July 2026)

Aalo-X at Idaho National LaboratoryUnited StatesCommissioning
  • Project proposerAalo Atomics
  • OperatorAalo Atomics
  • Vendor for the linked designAalo Atomics

Not found in the sources we checked. The Department of Energy exclusion approved on 14 April 2026 limits this Aalo-X assembly to zero-power physics tests at no more than 10 watts thermal, with no electrical generation. Aalo’s 5 May 2026 post says the critical test reactor validates Aalo’s own models, and its 4 July and 30 July 2026 posts name data-center electricity and Crusoe only for a later power reactor. Those sources do not name a research user, test beneficiary, or service customer for this assembly. The developer, the Department as authorizer, and the laboratory as site host are not treated as customers. DOE Idaho categorical exclusion CX-271002 PDF: Aalo-X critical assembly; Aalo: DOE-Idaho Approves Aalo's Documented Safety Analysis for the Aalo-X Critical Test Reactor; Aalo: first criticality post, including Project Ascension (4 July 2026); Aalo: Crusoe partnership (30 July 2026)

Not found in the sources we checked. Aalo's 5 May 2026 post says the Critical Test Reactor building, on INL land leased from DOE, is built, managed and operated almost exclusively by Aalo and its subcontractors, none of whom is named. INL is the recorded site host. No engineering or construction contractor for the critical assembly is named in the sources read. Aalo: DOE-Idaho Approves Aalo's Documented Safety Analysis for the Aalo-X Critical Test Reactor

Not found in the sources we checked. Nuclear Engineering International's 7 July 2026 report mentions Aalo's US$100 million Series B round in 2025, which is company financing, and DOE's determination and pilot-program update state no funding for the critical assembly. No amount or funder specific to Aalo-X is stated in the sources read. NEI: Fourth reactor meets US criticality deadline

Source-backed project statement Nuclear Engineering International reported on 7 July 2026 that Aalo commissioned GE Vernova's Global Nuclear Fuel to fabricate the Aalo-X fuel rods and that Urenco USA and GNF refined and manufactured the LEU rods used for the 4 July 2026 criticality. DOE's determination describes the fuel as sponsor-owned low-enriched uranium dioxide pins, and DOE's July 2026 update gives 4.95% enrichment. The fuel was delivered and used. Urenco's exact share is not stated. NEI: Fourth reactor meets US criticality deadline; DOE Idaho categorical exclusion CX-271002 PDF: Aalo-X critical assembly

Comparable schedule revision not established. DOE's July 2026 pilot-program update lists the Aalo-X safety approvals in March and April 2026 and criticality on 4 July 2026, which met Aalo's earlier target of criticality by 4 July 2026. The 2027 full-power test concerns the separate power reactor. The record's events contain no revises or supersedes pair, and no revised date is stated. DOE Office of Nuclear Energy: Reactor Pilot Program Update, slides filed with the NRC (ADAMS ML26198A212)

ACR-300 SMR proposal at Atucha (Meitner Energy)ArgentinaAnnounced
  • Project proposerMeitner Energy
Not recorded
  • Vendor for the linked designINVAP

Not found in the sources we checked. The December 2024 government page says an SMR at the Atucha site would improve access to energy and reduce outages. That is a national description, not a named customer or quantity. The later private-project articles name no offtaker. Data-center and artificial-intelligence language on the plan page is not a named buyer for this reactor. Argentina government Atucha SMR plan

Not found in the sources we checked. The checked press reports do not identify an awarded construction contract. Their reported option for Nucleoeléctrica Argentina to undertake operation and maintenance has not been confirmed against the primary shareholder act; no operator or contractor appointment is established here. Infobae: government announces private project for a new nuclear plant (Meitner Energy, Atucha); Dinámica: Atucha III cancelled; tender for a private reactor authorised (September 2026)

Source-backed project statement The Herald reports a plan to invest US$1.2 billion. Dinámica reports an estimated US$1,203 million under a scheme it quotes as 100 percent private capital, without public funds or guarantees. EconoJournal reports the same US$1,200 million announcement and the later resignation of the chief executive. These are attributed estimates and an unawarded tender authorization, not disbursements. The primary Nucleoeléctrica document was not available in this review. Buenos Aires Herald: private project to build nuclear reactor; Dinámica: Atucha III cancelled; tender for a private reactor authorised (September 2026)

Not found in the sources we checked. The December 2024 plan says a second stage would develop uranium reserves for domestic demand and fuel-element exports. That is a national-plan stage, not a supplier, quantity, or delivery for this reactor. The project articles name no fuel contract. Argentina government Atucha SMR plan

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Infobae on 2 July 2026 gives one conditional construction duration of five years after Economy Ministry approval and a nuclear-regulator license. The Buenos Aires Herald on 3 July 2026 recalls a March 2025 announcement of four ACR-300 reactors at Atucha, a different count from this one-reactor proposal. Neither article states two forecasts of the same milestone. Infobae: government announces private project for a new nuclear plant (Meitner Energy, Atucha); Buenos Aires Herald: private project to build nuclear reactor

AEP Joshua Falls SMR proposalUnited StatesSitingNot recordedNot recorded

Not found in the sources we checked. The Virginia order quotes the statute on a future certificate to construct a facility to serve customers in the Commonwealth or in West Virginia. That is a class of utility service, not a named buyer or quantity. Steel Dynamics, Inc. filed a notice of participation and was later excused from the hearing. That participation is not an offtake. No power-purchase agreement is stated. Virginia SCC final order, Case No. PUR-2025-00085

Source-backed project statement The Virginia commission’s 12 November 2025 order records APCo’s statement that it had selected an early-site-permit contractor for Joshua Falls. The cited passage does not name the contractor. This is preparatory licensing work, not a construction award or an operator appointment. Virginia SCC final order, Case No. PUR-2025-00085

Source-backed project statement Virginia's State Corporation Commission approved on 12 November 2025 Appalachian Power's decision to incur early development costs for a possible SMR at its Joshua Falls site, without approving cost recovery, which the company expected to seek in mid-2026 through customer rates. AEP said in January 2025 that Appalachian Power had applied for a 35 million dollar DOE grant for the early site permit work. The utility is funding early development itself, and no DOE award for Joshua Falls is reported in the sources read. Virginia SCC final order, Case No. PUR-2025-00085; AEP potential new SMR sites

Not found in the sources we checked. The order lists reactor original-equipment-manufacturer evaluation and selection as an early-development activity. The AEP release says no technology provider has been identified at Joshua Falls. No fuel supplier, fuel form, or delivery is stated. Virginia SCC final order, Case No. PUR-2025-00085

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The NRC page gives one plan: early-site-permit submittal in April 2027, during a pre-application period that began in December 2024. The order's 31 December 2026 report, and the company's expectation of a mid-2026 cost-recovery request, are different milestones. The order's estimate of seven to twelve years is one undated range for a whole project, not a revision of the April 2027 plan. NRC pre-application activities: APCo Joshua Falls

AEP Rockport BWRX-300 proposalUnited StatesAnnouncedNot recorded

Not found in the sources we checked. The release speaks of bringing nuclear power to AEP's customers and of I&M's existing customers. That is the utility's general service, not a named buyer, quantity, or agreement for a Rockport SMR. No offtake is disclosed. AEP potential new SMR sites

Source-backed project statement AEP’s 17 January 2025 release cited a November 2024 Indiana Office of Energy Development siting report performed by Purdue University that identified Rockport as suitable. This is an attributed state study, not an I&M construction contract or site permission. AEP potential new SMR sites

Not found in the sources we checked. AEP's 17 January 2025 release says Indiana Michigan Power, as a subrecipient in a funding partnership with TVA and GE Hitachi, was seeking US$50 million from DOE to begin early-site-permit and preliminary safety analysis work at Rockport, and would carry out that work if awarded. That is a grant application. No award, amount granted or disbursement is shown in the source read. AEP potential new SMR sites

Not found in the sources we checked. The release names the GE Hitachi BWRX-300 as the technology for the grant-supported work. It does not name a fuel supplier, a fuel form, or a delivery. The phrase fuel cells in the same release refers to other AEP resources, not nuclear fuel for this proposal. AEP potential new SMR sites

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The 17 January 2025 release gives one company estimate: commercial use of an SMR is at least a decade away. It is not tied to a named Rockport unit, and there is no earlier date in the opened release for the same milestone. A single estimate is not a site revision. AEP potential new SMR sites

Akademik Lomonosov floating NPPRussiaOperatingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
  • Vendor for the linked designRosatom

Source-backed project statement On 27 June 2019 NucNet, relaying Rosatom, reported that coastal work was underway in Pevek to attach Akademik Lomonosov to city power and heating grids and that supply of energy to Pevek was scheduled for December. The 19 August 2026 Rosatom corporate article says the station keeps operating during staggered refueling and that consumers have no break in energy supply. Neither text names a utility, a contract, or a separate heat buyer. NucNet: Regulator Grants Operating Licence For Russia's First Floating Nuclear Station; Strana Rosatom: Rosatom delivers fresh nuclear fuel for the floating nuclear plant (19 August 2026)

Source-backed project statement World Nuclear News reported on 21 May 2018 that Rosatom transferred the Akademik Lomonosov construction contract from Sevmash to Baltic Shipyard in August 2008. This supports the recorded Baltic Shipyard construction role; the contract instrument was not reviewed. WNN: Floating plant arrives at Murmansk for fuelling

Not found in the sources we checked. The 27 June 2019 NucNet report, the IAEA PRIS rows for the two Akademik Lomonosov units at Pevek, and the 19 August 2026 Rosatom fuel article describe a reported operating license, plant operation, and a fuel delivery. They do not state a project cost or an amount paid for the plant. NucNet: Regulator Grants Operating Licence For Russia's First Floating Nuclear Station; IAEA PRIS statistics: reactors by country code (Russia), captured 9 October 2026; Strana Rosatom: Rosatom delivers fresh nuclear fuel for the floating nuclear plant (19 August 2026)

Source-backed project statement On 19 August 2026 a Rosatom corporate article reported that the fuel division had delivered nuclear fuel to Pevek for one of the two Akademik Lomonosov units, and that the core for the starboard reactor was made at the Machine-Building Plant in Elektrostal. The article says the starboard unit was first refueled at the end of 2023 and the port unit in 2024. The new delivery is to Pevek, and the article does not say that core has been loaded. Strana Rosatom: Rosatom delivers fresh nuclear fuel for the floating nuclear plant (19 August 2026)

Source-backed project statement Rosenergoatom's annual report for 2013 planned commissioning of the Pevek floating station in 2018; its report for 2014 planned the same milestone for 2019. The reports document a changed historical target, but the dates on which those forecasts were issued and the reason for the change are not established by the saved evidence. Report years and board preapproval years are not used as forecast statement dates. Delivery of the floating unit, station commissioning, grid connection and commercial operation are distinct milestones. PRIS achieved dates are not further forecasts. NucNet: Regulator Grants Operating Licence For Russia's First Floating Nuclear Station; IAEA PRIS statistics: reactors by country code (Russia), captured 9 October 2026; Rosenergoatom annual report for 2013: Pevek commissioning target; Rosenergoatom annual report for 2014: Pevek commissioning target

ALFRED lead-cooled demonstrator at Mioveni (EAGLES-300 program)RomaniaAnnouncedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
  • OperatorRATEN
Not recorded

Not found in the sources we checked. The World Nuclear Association Romania profile, updated 13 August 2026, says RATEN's research institute ICN will host the ALFRED demonstrator at Mioveni. A host is not a buyer, and the profile names no recipient of ALFRED's power or heat. Its reference to a later industrial unit of about 600 MWe describes a successor concept, not a customer. WNA: Nuclear power in Romania

Source-backed project statement The World Nuclear Association Romania profile, updated 13 August 2026, says ENEA, Ansaldo Nucleare and Romania's ICN set up the Fostering Alfred Construction (Falcon) consortium in December 2013 for building ALFRED at ICN's Mioveni facility. ENEA's August 2021 journal article confirms ENEA's membership of FALCON with Ansaldo Nucleare and RATEN-ICN. This is a development consortium, not an awarded construction contract, and RATEN's roadmap still targets a construction permit in 2032. WNA: Nuclear power in Romania; ENEA: Overview on Lead-Cooled Fast Reactor Design and Related Technologies Development in ENEA

Not found in the sources we checked. The World Nuclear Association Romania profile, updated 13 August 2026, puts ALFRED's total cost at some 1.0 billion euros, which is an estimate, not financing. It also reports a 20 million euro ATHENA contract (2021), a 112 million euro 4ALFRED program for four test facilities (announced March 2025) and a 36 million euro RATEN contract for HELENA-2 and ELF test facilities (early 2026). These support facilities are not the reactor, and the profile names no funder or instrument for ALFRED itself. WNA: Nuclear power in Romania

Not found in the sources we checked. The World Nuclear Association Romania profile, updated 13 August 2026, says the ALFRED design would use mixed-oxide fuel with about 17 percent plutonium. That is a design fuel description. The profile, RATEN's 2026 workshop slides and ENEA's 2021 article name no fuel fabricator, allocation or delivery for ALFRED. WNA: Nuclear power in Romania

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. RATEN ICN's slides for a 2026 IAEA lead-cooled reactor workshop give one ALFRED roadmap: design certification 2030, siting permit 2031, construction permit 2032, commissioning permit 2036 and operation 2037. The slides read do not set out an earlier date for any of these milestones, so they show targets, not a revision. The slide file prints no cover date. RATEN presentation on ALFRED, IAEA LFR workshop 2026

Amazon, AEP and X-energy Xe-100 plant at the former Breed station (Indiana)United StatesAnnouncedNot recorded
  • Vendor for the linked designX-energy
  • Prospective customer / offtaker (binding offtake not established)Amazon

No separate question review is recorded.

Not recorded

No separate question review is recorded.

  • Funder or lender named for this projectAmazon

No separate question review is recorded.

Not recordedNo project-specific fuel supply arrangement is recorded as a structured fact.

No separate question review is recorded.

Not recorded

No separate question review is recorded.

Ameren / Westinghouse SMR proposal at Callaway (2012)United StatesAnnouncedNot recorded

Not found in the sources we checked. Ameren Missouri's 19 April 2012 release, Westinghouse's 17 May 2012 NexStart release and the 2012 World Nuclear News and Engineering News-Record reports name no buyer of power from a Westinghouse SMR at Callaway. The alliance utilities are named as supporters of a funding application and a potential deployment, and the April release says a combined license would not obligate Ameren Missouri to build. Ameren Missouri forms an alliance with Westinghouse to apply for DOE SMR funds; Westinghouse and Ameren Missouri announce NexStart SMR Alliance

Source-backed project statement Westinghouse's 17 May 2012 release announced the Ameren Missouri-led NexStart SMR Alliance to support Westinghouse's DOE application and a strategy for design certification and a combined license for a Westinghouse SMR at Callaway. World Nuclear News reported on 22 May 2012 that engineering firm Burns & McDonnell and General Dynamics Electric Boat had joined. These are application and licensing-preparation roles. No license, engineering contract or construction award followed in the sources read. Westinghouse and Ameren Missouri announce NexStart SMR Alliance; WNN: SMR vendors apply for government funds; ENR: Department of Energy moves forward on small modular reactors

Not found in the sources we checked. Ameren Missouri's 19 April 2012 release says it agreed to support Westinghouse's application for DOE small modular reactor funds of up to $452 million for up to two designs, and World Nuclear News reported the application was filed on 18 May 2012. Engineering News-Record reported on 28 November 2012 that the first award went to the Babcock & Wilcox, Bechtel and TVA team. No source read awards or pays money to the Callaway proposal. The $452 million is the program ceiling, not this project's funding. Ameren Missouri forms an alliance with Westinghouse to apply for DOE SMR funds; Westinghouse and Ameren Missouri announce NexStart SMR Alliance; WNN: SMR vendors apply for government funds; ENR: Department of Energy moves forward on small modular reactors

Not found in the sources we checked. Ameren Missouri's 19 April 2012 release describes a 225 MW Westinghouse SMR based on the AP1000 but names no fuel supplier, fabrication or delivery for Callaway. The later 2012 alliance release and press reports read also name no fuel arrangement. A general risk sentence about the cost of enriched uranium for Ameren's existing generation is not a commitment for this proposal. Ameren Missouri forms an alliance with Westinghouse to apply for DOE SMR funds

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Ameren Missouri's 19 April 2012 release expected a DOE funding decision in the summer of 2012, and Westinghouse's 17 May 2012 release expected it in late summer and stated an aim for Callaway operation by 2022. The 2022 aim is stated once, and the funding decision is a program step rather than a Callaway construction or operation milestone. No source read revises a date for this proposal. Ameren Missouri forms an alliance with Westinghouse to apply for DOE SMR funds; Westinghouse and Ameren Missouri announce NexStart SMR Alliance; ENR: Department of Energy moves forward on small modular reactors

Ameresco–Terrestrial Energy IMSR at Aberdeen Proving GroundUnited StatesAnnounced
  • Project proposerAmeresco
Not recordedReviewed 18 Oct 2026: not disclosed in the reviewed evidence.

Not found in the sources we checked. Ameresco's 21 September 2026 release says the Aberdeen Proving Ground projects are expected to provide market-based capacity to Maryland's grid while supporting the installation's missions during utility outages. It names no buyer, power purchase agreement or contracted quantity for the IMSR phase. Ameresco: Ameresco Selected for U.S. Army Strategic Capital Initiatives to Advance Energy Resilience at Aberdeen Proving Ground and Picatinny Arsenal

Not found in the sources we checked. Ameresco's 21 September 2026 release says Ameresco is collaborating with Terrestrial Energy to deploy an IMSR at the Aberdeen Phase 2 site, and World Nuclear News on 9 October 2026 says Terrestrial was selected as the plant technology supplier after a competitive process. Terrestrial is the reactor vendor, so this is a technology selection, not a contractor appointment. Neither source names an engineering or construction contractor. Ameresco: Ameresco Selected for U.S. Army Strategic Capital Initiatives to Advance Energy Resilience at Aberdeen Proving Ground and Picatinny Arsenal; World Nuclear News: Latest Terrestrial Energy topical report submission could lead to faster deployment

Source-backed project statement Ameresco's 21 September 2026 release says that under the Army's Enhanced Use Lease structure the United States keeps title to the land while the private-sector partners are responsible for financing, designing, building, operating and decommissioning the facilities. Ameresco, as the selected partner, would therefore finance the Aberdeen project. No amount is stated, and the lease is still being negotiated. Ameresco: Ameresco Selected for U.S. Army Strategic Capital Initiatives to Advance Energy Resilience at Aberdeen Proving Ground and Picatinny Arsenal

Not found in the sources we checked. Ameresco's 21 September 2026 release and World Nuclear News' 9 October 2026 report describe the IMSR technology selection for Aberdeen but name no fuel supplier, salt fabrication, quantity or delivery for the project. World Nuclear News: Latest Terrestrial Energy topical report submission could lead to faster deployment

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Ameresco's 21 September 2026 release gives no construction or operation date for the Aberdeen IMSR and says no construction will begin until environmental and regulatory reviews are complete. With no dated target there is nothing to revise. Ameresco: Ameresco Selected for U.S. Army Strategic Capital Initiatives to Advance Energy Resilience at Aberdeen Proving Ground and Picatinny Arsenal

Antares Mark-0 at Idaho National LaboratoryUnited StatesCommissioning
  • Vendor for the linked designAntares Nuclear

Source-backed project statement Antares said on 4 June 2026 that the Mark-0 test contributes verification and validation data to the Department of War’s Project Pele, while describing the Army as a future end user. The same release places electricity and a military installation after this test, and the 26 January 2026 exclusion says Mark-0 is not anticipated to produce electricity. No terms are stated for the Project Pele data contribution, and no buyer of Mark-0 heat or electricity is named. The developer and the laboratory host are not treated as customers. Antares: Antares Achieves Criticality of Mark-0 Reactor; DOE Idaho categorical exclusion CX-035340 PDF: Antares R1 Mark-0

Not found in the sources we checked. Antares' 4 June 2026 release says the Mark-0 demonstration was conducted in partnership with DOE, INL and BWXT, with the US Army observing, and that INL and DOE Idaho provided design, regulatory and facilities support. INL is the host and DOE the authorizing agency, and BWXT's role was fuel fabrication. No engineering or construction contractor is named for Mark-0. Antares: Antares Achieves Criticality of Mark-0 Reactor

Not found in the sources we checked. Antares said on 22 September 2025 that it had executed its agreement with DOE to take a reactor critical by 4 July 2026, and DOE Idaho's categorical exclusion refers to an Other Transaction Agreement and a HALEU agreement between Antares and DOE. Neither source publishes the agreements' financial terms, and no funder or amount for Mark-0 is stated. Antares: Antares executes agreement with DOE to take reactor critical by July 2026; DOE Idaho categorical exclusion CX-035340 PDF: Antares R1 Mark-0

Source-backed project statement Antares' 4 June 2026 release says BWXT fabricated the TRISO fuel used for Mark-0's criticality, the same fuel as Project Pele, and DOE committed HALEU to Antares for this reactor on 26 August 2025. DOE Idaho's categorical exclusion says Mark-0 uses HALEU TRISO under a HALEU agreement in which the material is leased from DOE, and that the fuel will be kept in storage after Mark-0. The fuel was delivered and loaded, since the reactor reached criticality on 4 June 2026. Antares: Antares Achieves Criticality of Mark-0 Reactor; DOE: U.S. Department of Energy to Distribute Next Round of HALEU to U.S. Nuclear Industry; DOE Idaho categorical exclusion CX-035340 PDF: Antares R1 Mark-0

Comparable schedule revision not established. Antares' September 2025 agreement with DOE set a goal of criticality by 4 July 2026, and Mark-0 reached criticality on 4 June 2026, ahead of that goal. No source read gives an earlier and later target for the same Mark-0 milestone, and the record's events contain no revision pair. Antares: Antares executes agreement with DOE to take reactor critical by July 2026; Antares: Antares Achieves Criticality of Mark-0 Reactor

Antares Mark-1 electricity-producing microreactor at INLUnited StatesAnnouncedNot recorded

Not found in the sources we checked. Antares's 17 February 2026 roadmap says it intends to produce electricity with the full-scale Mark-1 within 2027 in its INL test facility, but names no buyer of that electricity. The 2 October 2026 ANS article's Antares passages discuss the test facility only. The roadmap's mention of customers as a class who might turn bearish on the industry is not an offtake. Antares: From neutrons to electrons, our path to power

Not found in the sources we checked. Antares's 17 February 2026 roadmap and the 2 October 2026 ANS article name no engineering, licensing or construction contractor for Mark-1. They place Mark-1 in INL's MFC-793 test facility, which Antares calls its test bed for Mark-0 and Mark-1, and name BWXT only for HALEU TRISO fuel fabrication. INL is the host facility, and the DOE authorizations mentioned concern 2026 tests, not Mark-1. Antares: From neutrons to electrons, our path to power; ANS: Deployable Energy next in line for testing in NRIC's DOME

Not found in the sources we checked. Antares's 17 February 2026 roadmap and the Antares passages of the 2 October 2026 ANS article state no amount, award, loan or investment for Mark-1. The roadmap's references to commercially viable economics and future investments describe later development needs, and its DOE pilot-program mention concerns the Mark-0 test, not money for Mark-1. Antares: From neutrons to electrons, our path to power

Source-backed project statement Antares stated on 17 February 2026 that HALEU TRISO fuel fabrication for two reactors had begun with BWXT. It planned to use the same batch of compacts at its existing INL test facility for Mark-1 electricity production in 2027. Antares announced on 27 October 2026 a commercial agreement with BWXT for TRISO fuel through the end of the decade, with an initial allocation of one metric ton of uranium, on the line it says made Mark-1's fuel. The update does not assign that allocation to Mark-1. None of this is evidence of completed Mark-1 loading or electricity generation. Antares: From neutrons to electrons, our path to power; Antares (27 Oct 2026): TRISO fuel agreement with BWXT

Not recorded

Comparable schedule revision not established. Antares's 17 February 2026 roadmap states one target, electricity from Mark-1 in 2027 in the same INL test facility and with the same HALEU TRISO fuel batch as Mark-0. The 2 October 2026 ANS article does not restate a Mark-1 date, and its 2027 DOME testing slots belong to other companies. A single target stated once is not a schedule revision. Antares: From neutrons to electrons, our path to power; ANS: Deployable Energy next in line for testing in NRIC's DOME

Antares microreactor at Joint Base San Antonio (ANPI)United StatesSitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded
  • Vendor for the linked designAntares Nuclear

Not found in the sources we checked. Antares' 22 April 2026 release quotes the Joint Base San Antonio commander saying the base's resilience would improve if it is selected as a site, which describes potential host use, not a purchase. Neither that release nor World Nuclear News' 24 April 2026 report names a buyer, quantity or power purchase agreement for an Antares reactor at the base. Antares Selected for Proposed Deployment of Nuclear Microreactor at Joint Base San Antonio Under Department of the Air Force ANPI Initiative; WNN: US Air Force announces selections for microreactor deployments

Not found in the sources we checked. Antares' 22 April 2026 release says the Department of the Air Force, with the Defense Innovation Unit, selected Antares for the proposed deployment of a prototype microreactor at Joint Base San Antonio, and World Nuclear News on 24 April 2026 calls Antares a potential developer and operator. That is the project's own developer being selected, not a contractor appointment. Neither source names an engineering, construction or other contractor for the base deployment. Antares Selected for Proposed Deployment of Nuclear Microreactor at Joint Base San Antonio Under Department of the Air Force ANPI Initiative; WNN: US Air Force announces selections for microreactor deployments

Not found in the sources we checked. Antares' 22 April 2026 release says the company is backed by over $140 million in funding, which is company financing, not money for the Joint Base San Antonio deployment. World Nuclear News' 24 April 2026 report says the selected firms were eligible to seek funding under the program and states no award or amount for this pairing. Antares Selected for Proposed Deployment of Nuclear Microreactor at Joint Base San Antonio Under Department of the Air Force ANPI Initiative; WNN: US Air Force announces selections for microreactor deployments

Not found in the sources we checked. Antares' 22 April 2026 release says fuel fabrication for its initial reactors has been under way at BWX Technologies since October 2025, in the passage about its Department of Energy pilot reactor, and describes TRISO as the R1 design fuel. It does not tie that fuel or any delivery to a reactor at Joint Base San Antonio. Antares Selected for Proposed Deployment of Nuclear Microreactor at Joint Base San Antonio Under Department of the Air Force ANPI Initiative

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Antares' 22 April 2026 release gives one target, R1 deployment by 2028 or earlier, and World Nuclear News' 24 April 2026 report gives the program's aim of one reactor on an Air Force installation by 2030 or sooner. These are different scopes stated once each, not an earlier and later date for the same Joint Base San Antonio milestone. Antares Selected for Proposed Deployment of Nuclear Microreactor at Joint Base San Antonio Under Department of the Air Force ANPI Initiative; WNN: US Air Force announces selections for microreactor deployments

Antares R1 microreactor siting at INL's Central Facilities AreaUnited StatesSitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
  • Vendor for the linked designAntares Nuclear

Not found in the sources we checked. Antares's 30 July 2025 update says its second INL contract moves it towards a permanent facility where it would test and operate microreactors before providing power for military and commercial uses elsewhere, and DOE Idaho's categorical exclusions of June and August 2025 cover only planning and site characterization. No recipient of power from the Central Facilities Area facility is named. Antares: partnership with INL on facilities for testing and operating reactors (30 July 2025)

Not found in the sources we checked. Antares's 30 July 2025 update says a second contract with Idaho National Laboratory, the host site, moves Antares towards establishing and siting a permanent testing facility. DOE Idaho's August 2025 categorical exclusion covers Antares's planning, drilling and resource surveys and says reactor construction and operation need separate review. No engineering or construction contractor is named, and no location has been chosen. Antares: partnership with INL on facilities for testing and operating reactors (30 July 2025); DOE-ID categorical exclusion determination DOE-ID-INL-23-119: ANTARES Commercial Reactor Site Characterization and Pre-Construction Planning R2 (CX-035323 PDF)

Not found in the sources we checked. DOE Idaho's categorical exclusion for the Antares site work, approved 21 August 2025, says the underlying umbrella agreement is a public-private partnership platform with no funding associated. Antares's 30 July 2025 update gives a value of more than US$40 million only for its separate contract to build and demonstrate R1 in an existing INL facility. No amount is stated for the Central Facilities Area siting work. DOE-ID categorical exclusion determination DOE-ID-INL-23-119: ANTARES Commercial Reactor Site Characterization and Pre-Construction Planning R2 (CX-035323 PDF); Antares: partnership with INL on facilities for testing and operating reactors (30 July 2025)

Not found in the sources we checked. DOE Idaho's August 2025 categorical exclusion lists fuel fabrication and support with nuclear fuel vendors among activities under the umbrella agreement, but names no vendor, quantity or delivery for an Antares reactor at the Central Facilities Area, and the Antares update names none. DOE-ID categorical exclusion determination DOE-ID-INL-23-119: ANTARES Commercial Reactor Site Characterization and Pre-Construction Planning R2 (CX-035323 PDF)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. DOE Idaho's categorical exclusions of 26 June 2025 and 21 August 2025 cover planning and site characterization without a construction or operation date, and Antares's 30 July 2025 update gives no date for the permanent facility. No dated target exists for this record, so no revision is shown. DOE Idaho NEPA determination CX-034362: Antares commercial reactor site characterization and pre-construction planning (Revision 1); DOE-ID categorical exclusion determination DOE-ID-INL-23-119: ANTARES Commercial Reactor Site Characterization and Pre-Construction Planning R2 (CX-035323 PDF)

Antares R1 microreactors at Fort Bragg (Army Janus)United StatesAnnounced
  • Vendor for the linked designAntares Nuclear

Not found in the sources we checked. The Army's 26 August 2026 Janus release and POWER's report of the same day pair Antares with Fort Bragg and say Janus reactors will be contractor-owned and operated to deliver reliable power for military installations, but they name no power purchase agreement, quantity or price for Fort Bragg. The Army is recorded as host, and no purchase terms are stated. Army reaches agreement with private industry for nuclear micro reactors

Not found in the sources we checked. The Army's 26 August 2026 release selected Antares Nuclear, the developer and intended operator, for Fort Bragg under the Janus program, and POWER reports Antares will deploy three R1 microreactors there. No separate engineering or construction contractor is named, and no construction is established. Army reaches agreement with private industry for nuclear micro reactors; POWER: U.S. Army mobilizes $2.2B Janus program

Source-backed project statement The Army's 26 August 2026 release says that, with the Defense Innovation Unit, it is awarding up to a combined $2.2 billion for fiscal years 2027 to 2031 to the five Janus vendors, including Antares for Fort Bragg, paid only as technical milestones are met, alongside capital from each vendor. The Fort Bragg share is not stated, payments are conditional, and POWER's roughly $1 billion figure covers all of Antares's military contracts, not this site. Army reaches agreement with private industry for nuclear micro reactors; POWER: U.S. Army mobilizes $2.2B Janus program

Not found in the sources we checked. POWER's 26 August 2026 report says each Fort Bragg R1 unit is TRISO-fueled, which describes the design. Neither it nor the Army's release names a fuel supplier, fabrication contract or delivery for the Fort Bragg units. POWER: U.S. Army mobilizes $2.2B Janus program

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. The Army's 26 August 2026 release repeats the September 2028 target for operation of a first Army-regulated reactor on any military installation, and POWER's report gives no date for the three Fort Bragg units. A program target stated once is not a Fort Bragg date, so no revision is shown. Army reaches agreement with private industry for nuclear micro reactors; POWER: U.S. Army mobilizes $2.2B Janus program

ARC-100 first-of-a-kind deployment framework at Idaho National LaboratoryUnited StatesAnnouncedNot recorded

Not found in the sources we checked. ARC Clean Technology's 28 July 2026 announcement of its INL partnership says the ARC-100 could help meet US demand for firm power, including data centers. That is a general market statement. It names no buyer or agreement for power from an ARC-100 at INL. ARC Clean Technology and INL formalize strategic partnership (28 July 2026)

Source-backed project statement ARC Clean Technology's 28 July 2026 announcement says it signed a Strategic Partnership Project agreement with Battelle Energy Alliance, INL's operating contractor, under which INL will support ARC-100 engineering and design, materials, modeling, irradiation testing, commissioning, operation and site development. This is a framework for technical support services, and each scope of work needs a separate DOE-approved task statement. It is not a construction contract. ARC said on 29 October 2026 that it signed a memorandum of understanding with Hyundai Engineering Co., Ltd. to explore support for this deployment; that is not a construction contract either. ARC Clean Technology and INL formalize strategic partnership (28 July 2026); ARC Clean Technology (29 Oct 2026): memorandum with Hyundai Engineering on ARC-100 deployment

Not found in the sources we checked. ARC Clean Technology's 28 July 2026 announcement says funding for INL's work will be defined in individual task statements, each subject to DOE approval. It names no funder, amount or instrument for the INL ARC-100 deployment. ARC Clean Technology and INL formalize strategic partnership (28 July 2026)

Not found in the sources we checked. ARC Clean Technology's 28 July 2026 announcement says INL previously supported ARC's fuel design and analysis under DOE's ARC-20 program and describes the ARC-100 as metal-fueled. These concern design work. It names no fuel supplier, quantity or delivery for the INL deployment. ARC Clean Technology and INL formalize strategic partnership (28 July 2026)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. ARC Clean Technology's 28 July 2026 announcement describes a multi-year framework from detailed design through deployment but gives no construction or operation date for the INL ARC-100. With no dated target there is nothing to revise. ARC Clean Technology and INL formalize strategic partnership (28 July 2026)

ARC-100 proposal at the Port of Belledune Green Energy HubCanadaAnnouncedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Not found in the sources we checked. The Belledune Port Authority's 28 November 2022 announcement says the ARC-100 would serve expanded hydrogen production and other port industries, which may include metal fabrication and advanced manufacturing. Those are intended uses. The announcement names no buyer, quantity or agreement for the unit's power or heat. Belledune Port Authority: to pursue an ARC Clean Technology aSMR project with Cross River

Not found in the sources we checked. The Belledune Port Authority's 28 November 2022 announcement says the port is working with Cross River Infrastructure Partners, named as project developer, to pursue an ARC-100 unit, pending feasibility studies, environmental approvals and licensing. A developer is a proposer, not a contractor. The announcement names no feasibility, engineering or construction contractor, and its 2021 Pabineau First Nation agreement concerns jobs and economic initiatives. Belledune Port Authority: to pursue an ARC Clean Technology aSMR project with Cross River

Not found in the sources we checked. The Belledune Port Authority's 28 November 2022 announcement gives no cost, funder or financing for the ARC-100 unit. ARC's chief executive describes a relatively low cost of construction and operation without a figure, and the minimum 1 GW of heat and power is an output aim, not money. Belledune Port Authority: to pursue an ARC Clean Technology aSMR project with Cross River

Not found in the sources we checked. The Belledune Port Authority's 28 November 2022 announcement mentions the fueling of low-carbon hydrogen projects as an ARC-100 application, which concerns hydrogen, not nuclear fuel. It names no nuclear fuel supplier, quantity or delivery for the Belledune unit. Belledune Port Authority: to pursue an ARC Clean Technology aSMR project with Cross River

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The Belledune Port Authority's 28 November 2022 announcement gives one conditional window, commercial operation between 2030 and 2035 pending studies, approvals and licensing. The 2029 commissioning and late-2020s dates on the same page are for the separate Point Lepreau ARC-100. One window stated once is not a revision. Belledune Port Authority: to pursue an ARC Clean Technology aSMR project with Cross River

B&W mPower plan at TVA's Clinch River site (2013-2017)Earlier-plan recordUnited StatesCanceledNot recordedReviewed 19 Oct 2026: not disclosed in the reviewed evidence.Not recordedNot recorded

Source-backed project statement TVA's fiscal 2013 annual report says SMRs at Clinch River would provide an important option for clean base-load energy for TVA's customers, with TVA preparing the license application and owning the site. That is a possible supply to TVA's own system, not a purchase agreement, and TVA said it would not decide on construction for several years. The project was shelved in March 2017. TVA annual report on Form 10-K, fiscal year 2013 (mPower at Clinch River)

Source-backed project statement TVA's fiscal 2013 annual report says that under a contract TVA executed with Babcock & Wilcox in February 2013, TVA, B&W and Generation mPower, a B&W affiliate minority-owned by Bechtel, were preparing an NRC license application for up to four mPower SMRs at Clinch River. That was preparatory licensing work, not a construction contract. ANS reported that Bechtel took the program lead in 2016 and terminated it on 3 March 2017. TVA annual report on Form 10-K, fiscal year 2013 (mPower at Clinch River); ANS Nuclear Newswire: mPower consortium halts project (16 March 2017)

Source-backed project statement TVA's fiscal 2013 annual report says that under an April 2013 DOE cooperative agreement with B&W, TVA was reimbursed through B&W for roughly half of its qualified site-study and license-development costs, retroactive to October 2012. ANS reported in March 2017 that DOE reduced its funding after B&W scaled back in 2014 and halted payments at the end of 2014, and that the program ended in 2017 for lack of funding. TVA annual report on Form 10-K, fiscal year 2013 (mPower at Clinch River); ANS Nuclear Newswire: mPower consortium halts project (16 March 2017)

Not found in the sources we checked. TVA's fiscal 2013 annual report and ANS's March 2017 account describe licensing preparation, DOE cost sharing and the project's shelving, but name no fuel supplier, fabrication or delivery for mPower units at Clinch River. The plan ended before any license application. ANS Nuclear Newswire: mPower consortium halts project (16 March 2017)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. TVA's fiscal 2013 annual report says TVA would not decide to submit the license application until mid-2015 and would make construction decisions several years later. ANS's 2017 account gives no later date for the same step before the March 2017 shelving. No earlier and later date for the same milestone is shown in these sources. TVA annual report on Form 10-K, fiscal year 2013 (mPower at Clinch River)

Baim / Cape Nagloynyn floating PEB-106 (RITM-200S)RussiaConstructionNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
  • Intended licensed ownerAtomflot
  • Vendor for the linked designRosatom
  • Prospective customer / offtaker (binding offtake not established)GDK Baimskaya

Source-backed project statement World Nuclear News reported on 3 September 2021 that Atomflot and GDK Baimskaya, a KAZ Minerals subsidiary developing the Baimskaya mine, signed a preliminary power-supply agreement at the Eastern Economic Forum, with delivered electricity priced at RUB 6 per kWh in 2020 prices and described as concluded on commercial terms. It is a preliminary agreement. A final binding supply contract is not recorded in the sources read. WNN: SMRs to power Arctic development

  • Construction contractorAtomenergomash

Source-backed project statement Delovoy Peterburg reported on 25 October 2021 that Atomenergomash will manufacture and supply the four modernised floating power units ordered by Atomflot, in a deal reported at RUB 190.2 billion including VAT, and that Kirov-Energomash signed a contract with OKBM Afrikantov to supply eight 58 MW steam-turbine units. World Nuclear News reported the keel laying of the first barge at a Chinese shipyard in August 2022. These are signed supply and construction contracts. Reactor installation and operating licensing are not reported. Delovoy Peterburg: Kirovsky Zavod to supply turbine units for floating power units

Source-backed project statement Delovoy Peterburg reported on 25 October 2021 that Atomflot, the intended owner, ordered the four floating units from Atomenergomash in a deal of RUB 190.2 billion including VAT, and World Nuclear News reported in September 2021 that partners would spend over RUB 150 billion on power plants and transmission for the mine, with Atomflot's power sold to GDK Baimskaya at a set tariff. Atomflot's own financing sources and any state support are not stated. Delovoy Peterburg: Kirovsky Zavod to supply turbine units for floating power units; WNN: SMRs to power Arctic development

Not found in the sources we checked. Strana Rosatom's 24 September 2026 reactor-set report establishes no fuel-supply commitment, fabricated core, delivery or loading for the first Baimsky unit. This is a limit of that report, not evidence that no supplier exists. Fuel design and planned production capability are separate from a procurement commitment. Strana Rosatom: Rosatom manufactures the reactor set for the first floating unit (24 September 2026)

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. World Nuclear News reported in September 2021 that the first two Baimsky floating units would operate by early 2027, and in August 2022 linked a 2027 target to transfer of the first unit and electricity supply at Cape Nagloynyn. Interfax's own background note on 13 August 2026 expects the first unit to be put into service in 2028 and the fourth in 2031. The sources do not establish that transfer, first electricity supply and entry into service are the same milestone. The forecasts remain recorded separately; a comparable revision or one-year delay is not established. WNN: SMRs to power Arctic development; World Nuclear News: Construction starts on Russia's next floating nuclear power plant (31 August 2022); Interfax: four floating units of 424 MW for the Baimsky project

BARC Visakhapatnam HTGCR hydrogen demonstration proposalIndiaSitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Not found in the sources we checked. The Department of Atomic Energy's 5 August 2026 Lok Sabha answer and World Nuclear News of 10 December 2025 describe the Vizag reactor as an up-to-5 MWth demonstration intended to be coupled with a chemical process for hydrogen production. Neither names a buyer or user of the hydrogen or heat, a quantity, or an agreement. WNN: Maharashtra and Andhra Pradesh proposed for first Indian SMRs; Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)

Not found in the sources we checked. The Department of Atomic Energy's 5 August 2026 Lok Sabha answer says in-principle approval for engineering and construction of the Vizag HTGCR has been received, siting consent has been received and environment-ministry terms of reference were issued. Those are government approvals for BARC's own demonstration, not a contract. No engineering, procurement or construction contractor is named, and construction has not started. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)

Not found in the sources we checked. The Department of Atomic Energy's 5 August 2026 Lok Sabha answer states a Nuclear Energy Mission provision of Rs 20,000 crore for small modular reactor research, development and deployment as a class, not an allocation to the Vizag reactor. The same answer counts construction time from receipt of financial approval and does not say that approval has been given. No amount for this reactor is stated. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)

Not found in the sources we checked. The Department of Atomic Energy's 5 August 2026 Lok Sabha answer and World Nuclear News of 10 December 2025 name no fuel supply, fabricator or delivery for the Vizag HTGCR. They describe only its up-to-5 MWth capacity and hydrogen purpose. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The Department of Atomic Energy's 5 August 2026 Lok Sabha answer gives one estimate, 60 to 72 months of construction from receipt of financial approval, for the demonstration reactors as a group. No source read gives an earlier and a later date for the same Vizag milestone. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)

BaRupOn's anticipated KRONOS MMR deployment at its Liberty, Texas campus (feasibility stage)United StatesAnnouncedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Source-backed project statement NANO Nuclear's 24 November 2025 announcement says the feasibility study would evaluate KRONOS units supplying 1 GW to BaRupOn's LAMP hub in Liberty, Texas, and that the arrangement would let the LAMP data center campus secure on-site nuclear power. The intended recipient is BaRupOn's own campus, which is prospective and subject to the study. No power purchase agreement, quantity under contract or tenant buyer is named. NANO Nuclear announces 1 GW feasibility study with BaRupOn

Not found in the sources we checked. NANO Nuclear's 24 November 2025 announcement says BaRupOn signed a paid feasibility study agreement with NANO Nuclear to evaluate siting many KRONOS units on its Liberty campus. NANO Nuclear is the reactor vendor, so its study is not a separate contractor appointment. The announcement names no engineering or construction contractor for Liberty. NANO Nuclear announces 1 GW feasibility study with BaRupOn

Source-backed project statement NANO Nuclear's 24 November 2025 announcement says BaRupOn will pay NANO Nuclear for completing the Liberty feasibility assessment and has expressed willingness to co-invest directly in building the microreactors at its site after a successful assessment. The study phase is host-funded with no amount stated, and construction co-investment is conditional and uncommitted. NANO Nuclear announces 1 GW feasibility study with BaRupOn

Not found in the sources we checked. NANO Nuclear's 24 November 2025 announcement describes the KRONOS MMR as using helium coolant and TRISO fuel and lists a fuel subsidiary, HALEU Energy Fuel Inc., among its businesses. These are design and company descriptions. The announcement names no fuel supplier, quantity or delivery for Liberty. NANO Nuclear announces 1 GW feasibility study with BaRupOn

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. NANO Nuclear's 24 November 2025 announcement dates only the feasibility agreement and gives no study completion, construction or operation date for Liberty. With no dated target there is nothing to revise. NANO Nuclear announces 1 GW feasibility study with BaRupOn

BATAN/BRIN RDE experimental reactor at Serpong (PeLUIt-40 predecessor)IndonesiaSuspendedNot recordedReviewed 19 Oct 2026: not disclosed in the reviewed evidence.Not recordedNot recorded

Not found in the sources we checked. ANTARA's 7 February 2017 report on the Serpong experimental power reactor names no buyer of its power or heat. This is a finding about that project's reviewed report; arrangements for another design or site do not establish a Serpong offtake. ANTARA: BATAN obtains RDE site permit

Source-backed project statement ANTARA reported on 7 February 2017 that for the Serpong site evaluation BATAN involved the energy ministry's Geological Survey Centre and Centre for Volcanology and Geological Disaster Mitigation, the meteorology agency BMKG, Universitas Indonesia and Institut Teknologi Bandung. That was preparatory site-evaluation work, not a construction contract or operating appointment. BAPETEN's 2019 article records BATAN's own design submissions. ANTARA: BATAN obtains RDE site permit; BAPETEN: handover of RDE detail engineering design

Source-backed project statement BAPETEN's 29 January 2019 article says construction funds for the Serpong RDE would come from the state budget allocation (DIPA) and from non-DIPA sources, namely research cooperation with Tsinghua University and INSINAS funding, without amounts. ANTARA's 7 February 2017 report says construction would require Rp 2.2 trillion, which is a cost estimate, not an appropriation. These sources do not establish a budget approval or disbursement. BAPETEN: handover of RDE detail engineering design; ANTARA: BATAN obtains RDE site permit

Not found in the sources we checked. The October 2024 IAEA ARIS account of PeLUIt-40 says the earlier RDE design and the current PeLUIt-40 design are based on HTR-10 pebble fuel, and that BRIN is discussing possible supply with Tsinghua INET, with talks also opened with Rosatom and South African fabricators. Those are current design-supply discussions, not a contract, quantity or delivery for the suspended Serpong reactor. IAEA ARIS status report: PeLUIt-40

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. ANTARA and BAPETEN date the Serpong site permit to 23 January 2017, and BAPETEN says it is valid four years unless construction starts. These reviewed passages do not supply two dated forecasts for the same Serpong milestone. Targets for a successor design are not substituted for this project's schedule. ANTARA: BATAN obtains RDE site permit; BAPETEN: handover of RDE detail engineering design

Beck Creek Energy SMR proposal (Amherst County)United StatesAnnounced
  • Project proposerGeenex Power
Not recordedNot recordedNot recorded

No separate question review is recorded.

Not recorded

No separate question review is recorded.

Not recorded

No separate question review is recorded.

Not recordedNo project-specific fuel supply arrangement is recorded as a structured fact.

No separate question review is recorded.

Not recordedNot recorded

No separate question review is recorded.

Belledune Prodigy transportable nuclear proposalCanadaAnnouncedNot recorded
  • Vendor for the linked designBWX Technologies

Source-backed project statement Prodigy's 1 September 2026 announcement and BWXT's 5 October 2026 release say the Government of New Brunswick signed a letter of intent to offtake the electricity from the proposed Belledune transportable plant and notified Natural Resources Canada of its support. A letter of intent is not a definitive power-sales contract. Prodigy Belledune Indigenous-led proposal; BWXT: BWXT's BANR microreactor chosen for Canadian transportable nuclear power plant project (5 October 2026)

Source-backed project statement Prodigy announced on 1 September 2026 that BWXT Canada Ltd. and Kinectrics Inc. would advance licensing and supply-chain development. BWXT subsequently described planned workforce support. The cited releases do not establish an EPC award, a license or completed fabrication. Prodigy Belledune Indigenous-led proposal; BWXT: BWXT's BANR microreactor chosen for Canadian transportable nuclear power plant project (5 October 2026)

Not found in the sources we checked. The 1 September 2026 release sets an objective of a final investment decision within 18 months. It states no amount, application, or allocation. Notice to the federal Major Projects Office is institutional support, not a disclosed sum. No disbursement is stated. Prodigy Belledune Indigenous-led proposal

Not found in the sources we checked. The 5 October 2026 release says BANR is intended to use high-assay low-enriched uranium in TRISO fuel. That is the design description in the selection announcement, not a supplier, a quantity, or a delivery committed to Belledune. The plant is described as arriving ready for fueling, which is also not a fuel contract. BWXT: BWXT's BANR microreactor chosen for Canadian transportable nuclear power plant project (5 October 2026)

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. The 1 September and 5 October 2026 releases both target in-service operation by the early 2030s. Repeating one target is not a revision. The September release also says reactor technology should be demonstrably ready by 2032 for commercial generation. That is a down-selection criterion, not a second date for the same in-service milestone. A final investment decision within 18 months is a different objective. Prodigy Belledune Indigenous-led proposal

Blue Energy BWRX-300 at Port of VictoriaUnited StatesLicensing
  • Project proposerBlue Energy
  • Application filing entityBlue Energy
  • Parent companyBlue Energy
  • OperatorBlue Energy
  • Intended licensed ownerSister 1 LLC
  • Prospective customer / offtaker (binding offtake not established)Crusoe

Source-backed project statement Crusoe's 30 October 2025 announcement says Blue Energy would develop a plant of up to 1.5 GW at the Port of Victoria and deliver power to Crusoe-developed AI factories on a nearby site. Crusoe is a prospective customer under that partnership. Blue Energy's 15 September 2026 filing says it intends to finance the nuclear phase like other power projects, backed by a long-term power purchase agreement, and names no executed offtake, so no binding offtake is shown. Crusoe: Blue Energy and Crusoe partner to develop nuclear-powered AI data center; Blue Energy Construction Permit Application Part 1, non-proprietary Enclosure 9 (ADAMS ML26265A376)

Source-backed project statement Blue Energy's 15 September 2026 filing says major-equipment cost inputs come from agreements with GE Vernova Hitachi, including an Early Works Agreement, and that Blue Energy plans to engage an architect-engineer for a front-end engineering study. The synthetic EPC module contracts in the same filing are a financing model, not named awards. No construction contractor is named. Blue Energy Construction Permit Application Part 1, non-proprietary Enclosure 9 (ADAMS ML26265A376)

Source-backed project statement Blue Energy's 15 September 2026 filing says the company has raised about 450 million dollars of equity and debt across its capital raises. It says those funds included long-lead equipment orders for the project before a final investment decision, as part of broader business growth. The filing does not state that the whole sum was spent on Unit 1, and it does not state the amount spent on the project. Blue Energy Construction Permit Application Part 1, non-proprietary Enclosure 9 (ADAMS ML26265A376)

Not found in the sources we checked. Blue Energy's 15 September 2026 filing lists an initial fuel load as a redacted cost line and says the fuel cycle will be covered in Part 2's environmental report. No fuel supplier, fabrication or delivery for Unit 1 is named in the public text. Blue Energy Construction Permit Application Part 1, non-proprietary Enclosure 9 (ADAMS ML26265A376)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Source-backed project statement Blue Energy and Crusoe said on 30 October 2025 that the Port of Victoria project would supply power as early as 2028 and move to expected nuclear generation by 2031. DatacenterDynamics reported on 17 August 2026 that Blue Energy intended to supply about 1 GW from two gas turbines in 2030, followed by up to 1.5 GW from as many as five BWRX-300s starting in 2032, which ANS also reported. The expected start of nuclear supply therefore moved from 2031 to 2032, and gas supply from as early as 2028 to 2030. Both are company targets subject to a 2027 investment decision, not achieved dates. Crusoe: Blue Energy and Crusoe partner to develop nuclear-powered AI data center; Blue Energy, GE Vernova Hitachi advance 2.5GW gas-plus-nuclear plant in Texas, to power up to 1.5GW data center; ANS: Agreement advances Texas gas-plus-nuclear concept

BlueCore BC-15 floating plant proposal at the Port of Long BeachUnited StatesSitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded
  • Vendor for the linked designBlueCore Energy

Not found in the sources we checked. The NRC's BlueCore pre-application page names the Port of Long Beach as the reference operating location, which is a site, not a buyer. BlueCore's 13 October 2026 release says future systems could support ports, AI data centers and coastal infrastructure and that future sites will be determined later. Neither names a buyer, quantity or agreement for power or heat. NRC: BlueCore Energy (pre-application); BlueCore Energy secures low-enriched uranium

Not found in the sources we checked. Bluecore’s October 2026 release describes NRC and Coast Guard engagement and an ABS maritime-classification pathway. These are regulatory and classification relationships, not construction-contractor awards. The port notice’s planned INL testing does not establish a full-power operating site or an issued reactor license. NRC: BlueCore Energy (pre-application); Port of Long Beach: CEQA notice of exemption, BlueCore lease; BlueCore Energy secures low-enriched uranium

Not found in the sources we checked. BlueCore's 13 October 2026 release refers to the company's $50 million seed financing announced weeks earlier. That is company financing, not money committed to the Long Beach demonstration. The Port of Long Beach's July 2026 lease notice states areas and a lease term but no rent or project cost. BlueCore Energy secures low-enriched uranium; Port of Long Beach: CEQA notice of exemption, BlueCore lease

Source-backed project statement Bluecore reported on 13 October 2026 that it purchased uranium hexafluoride enriched to 4.95% uranium-235 from WMC for development of its first system. It said the material was held at an unnamed US fuel facility outside California. This is company/first-system procurement context, not fuel fabrication, loading or storage at Long Beach, whose prototype is described as non-fueled. BlueCore Energy secures low-enriched uranium; NRC: BlueCore Energy (pre-application); Port of Long Beach: CEQA notice of exemption, BlueCore lease

Not recorded

Comparable schedule revision not established. The NRC page dates BlueCore's pre-application engagement from July 2026, the port's lease notice was posted 17 July 2026, and BlueCore's 13 October 2026 release says future sites and configurations will be determined later. None of these states an earlier and a later date for the same Long Beach construction or operation milestone. NRC: BlueCore Energy (pre-application); Port of Long Beach: CEQA notice of exemption, BlueCore lease; BlueCore Energy secures low-enriched uranium

Blykalla SEALER Norrsundet / Gävle proposalSwedenLicensing
  • Application filing entityBlykalla
  • OperatorBlykalla
  • Vendor for the linked designBlykalla

Not found in the sources we checked. Blykalla's 18 May 2026 application release and its March 2026 Gävle planning release describe six lead-cooled reactors of about 330 MW at Norrsundet and Blykalla's aim to supply power for AI and industry. Neither names a buyer, offtake agreement or power purchase agreement for the Norrsundet plant. Blykalla Norrsundet planning

Not found in the sources we checked. Blykalla's March 2026 Gävle release names Oklo, Uniper and ABB as company partners, and its May 2026 application release describes a technical partnership with Oklo on Oklo's own reactor work. Neither assigns an engineering or construction role for the Norrsundet plant, and the county board's October 2026 plan description names none. Blykalla Norrsundet planning

Not found in the sources we checked. The Swedish government said on 5 June 2026 that it had received Blykalla's application for state support to establish a nuclear plant at Norrsundet outside Gävle. An application is not an award, and Blykalla's releases name no committed investor or financing for the plant. Swedish government records Norrsundet state-support application

Not found in the sources we checked. The Gävleborg county board's 8 October 2026 plan description covers interim storage of spent fuel and waste at Norrsundet, and Blykalla's releases describe the lead-cooled design. None names a fuel supplier, fabricator or delivery for the plant. Länsstyrelsen Gävleborg: Planbeskrivning - Förslag till anläggningsplan för kärntekniska anläggningar i Norrsundet (dnr 4622-2026, 8 October 2026)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Blykalla's March 2026 Gävle release says that, subject to permits and investment decisions, the facility could be operational in the first half of the 2030s. That target is stated once in the sources read, and the record's events hold no revision pair. Blykalla Norrsundet planning

Blykalla SEALER study at Hörby (withdrawn)SwedenCanceled
  • Project proposerBlykalla
Not recorded
  • Vendor for the linked designBlykalla

Not found in the sources we checked. Hörby municipality's project page, covering the June 2025 letter of intent and Blykalla's May 2026 withdrawal, names no buyer of power or heat from a Hörby SEALER. It says the site suits local distribution of electricity and heat and that Blykalla hoped to offer connections to possible future industries, but no customer, quantity or agreement is named. The municipality was the study partner, not a buyer. Hörby kommun: småskalig kärnteknik i Hörby (avsiktsförklaring med Blykalla)

Not found in the sources we checked. Hörby municipality's project page names no engineering or construction contractor for a Hörby SEALER. It says the 18 June 2025 letter of intent committed the municipality, as host, and Blykalla to a joint pre-study of about 18 months at Stavröd that was not a decision to build, and that in May 2026 Blykalla said building SMRs in Hörby was no longer current. Hörby kommun: småskalig kärnteknik i Hörby (avsiktsförklaring med Blykalla)

Not found in the sources we checked. Hörby municipality's project page states no amount, grant, investment or cost share for the Hörby study or a reactor. Blykalla's answer there names financing and cost overruns as the main risk, which describes uncertainty rather than any funding. Hörby kommun: småskalig kärnteknik i Hörby (avsiktsförklaring med Blykalla)

Not found in the sources we checked. Hörby municipality's project page quotes Blykalla saying uranium would be procured the same way as for Sweden's existing nuclear power unless new suppliers appeared, for example Swedish uranium mining. That names no supplier, allocation, fabrication or delivery for a Hörby reactor, and the reactor plan was withdrawn in May 2026. Hörby kommun: småskalig kärnteknik i Hörby (avsiktsförklaring med Blykalla)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Hörby municipality's page dates the letter of intent 18 June 2025 and describes a pre-study of about 18 months, with no construction or operation year. In May 2026 Blykalla said building SMRs in Hörby was no longer current. A withdrawal of the plan is a change of status, not an earlier and a later date for the same milestone. Hörby kommun: småskalig kärnteknik i Hörby (avsiktsförklaring med Blykalla)

Blykalla SEALER Untra / Tierp proposalSwedenLicensing
  • Application filing entityBlykalla
  • OperatorBlykalla
  • Vendor for the linked designBlykalla

Not found in the sources we checked. Blykalla's 25 August 2026 application says the Untra park would supply new capacity for industrial development and future energy-intensive establishments, and its 31 August 2026 financing release describes six to eight commercial SEALER-55 units in bidding zone SE3. Neither those company pages nor the Government's 28 August 2026 assignment and 2 October 2026 status page names an offtaker or a research-service customer. The developer and Tierp municipality are not treated as customers. Blykalla submits application for second advanced nuclear reactor park in Sweden, with up to 440 MW of capacity; blykalla.com: Untra Nuclear Power AB applies for Swedish state support; Government of Sweden: facility-plan assignment for the Untra application

Not found in the sources we checked. Blykalla's 25 August 2026 application names value-chain partners and an electric test facility at Oskarshamn with Uniper, which is a different site from Untra. The 31 August 2026 financing release and the Government's 28 August 2026 assignment and 2 October 2026 status page name no engineering, FEED, or construction contractor for the Untra park. Those partner sentences are not an Untra construction award. Blykalla submits application for second advanced nuclear reactor park in Sweden, with up to 440 MW of capacity; blykalla.com: Untra Nuclear Power AB applies for Swedish state support; Government of Sweden: facility-plan assignment for the Untra application

Source-backed project statement On 31 August 2026 Blykalla said Untra Nuclear Power AB, its wholly owned project company, applied for Swedish state support for the Untra park. The same company release says the model uses state loans, a contract for difference, and risk and gain sharing, with interest, strike price, and length still to be negotiated and reviewed by the European Commission. Negotiations start only if the Government Offices decide to proceed. The application is not money paid, and no amount is stated. blykalla.com: Untra Nuclear Power AB applies for Swedish state support

Not found in the sources we checked. Blykalla's 25 August 2026 application describes the Untra units as lead-cooled SEALER reactors, which is a coolant and design description rather than a fuel-supply commitment. The 31 August 2026 financing release and the Government pages of 28 August 2026 and 2 October 2026 do not name a fuel supplier, fabrication contract, delivery, or loading for Untra. The Oskarshamn electric test facility named in the application is a different site. Blykalla submits application for second advanced nuclear reactor park in Sweden, with up to 440 MW of capacity; blykalla.com: Untra Nuclear Power AB applies for Swedish state support; Government of Sweden: facility-plan assignment for the Untra application

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Blykalla stated the same operation target twice: first operations at Tierp in the first half of the 2030s on 25 August 2026, and the first reactor at Untra in the first half of the 2030s on 31 August 2026, both conditional on approvals. Repeating one target is not a revision. The Government's 30 April 2027 date is the deadline for the county board's draft facility plan, a different milestone. Blykalla submits application for second advanced nuclear reactor park in Sweden, with up to 440 MW of capacity; blykalla.com: Untra Nuclear Power AB applies for Swedish state support; Government of Sweden: facility-plan assignment for the Untra application

BREST-OD-300 SeverskRussiaConstructionNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
  • Vendor for the linked designRosatom

Not found in the sources we checked. The IAEA PRIS record lists BREST-OD-300 at Seversk as under construction with Siberian Chemical Combine as operator and owner, and World Nuclear News' 7 October 2026 report describes the reactor within the site's closed fuel-cycle complex. Neither names a buyer or supply arrangement for the plant's electricity. IAEA PRIS statistics: reactors by country code (Russia), captured 9 October 2026; World Nuclear News: Key equipment installed in BREST-OD-300 turbine hall (7 October 2026)

  • Construction contractorTitan-2

Source-backed project statement World Nuclear News reported on 5 December 2019 that Siberian Chemical Combine awarded Titan-2 a RUB 26.3 billion contract for construction and installation works on BREST-OD-300, covering the reactor building, turbine hall and related infrastructure. A TVEL release reprinted on 14 September 2026 says Titan-2 has been concreting the reactor vessel's inner cavity, so the awarded contractor is doing the work. Construction is under way, not complete. WNN: Russia awards contract to build BREST reactor; Atomic Energy 2.0 (relaying TVEL/SKhK release): First stage of BREST-OD-300 reactor-vessel concreting completed (14 September 2026)

Not found in the sources we checked. World Nuclear News' 2019 report gives the value of Siberian Chemical Combine's construction contract with Titan-2, RUB 26.3 billion, which is a contract price, not a funding source. The saved WNN, TVEL and PRIS texts name no funder, budget allocation or financing instrument for BREST-OD-300. WNN: Russia awards contract to build BREST reactor

Source-backed project statement Rosatom's industry media center said on 25 December 2024 that the site's fuel fabrication module had entered pilot-industrial operation, making mock-up BREST-OD-300 assemblies from depleted uranium under a license of 29 March 2024, and that production of mixed uranium-plutonium nitride fuel can begin once the regulator approves plutonium handling. More than 200 such assemblies are needed for the first core. The first core's fuel is therefore to be made on site by Siberian Chemical Combine, with production of the real fuel still awaiting approval in that source. Atom Media (Rosatom press release): Rosatom puts the fuel plant for the BREST-OD-300 reactor into pilot-industrial operation (25 December 2024)

Not recorded

Source-backed project statement Nuclear Engineering International reported on 19 June 2026 that Rosatom originally planned to launch BREST-OD-300 in 2026 and that, after additional research and development, the launch had been postponed to 2029. World Nuclear News on 7 October 2026 also reports an initial operation target of 2026. The reported launch target changed from 2026 to 2029; launch is not defined as criticality, grid connection or commercial operation. First concrete for BREST turbine - Nuclear Engineering International; World Nuclear News: Key equipment installed in BREST-OD-300 turbine hall (7 October 2026)

BWXT BANR at Fort Campbell (Army Janus)United StatesAnnounced
  • Vendor for the linked designBWX Technologies

Not found in the sources we checked. BWXT's 26 August 2026 release says it will work with the customer and potential partners on establishing the operating company structure for the Fort Campbell BANR, without naming that customer or stating who would take the reactor's power. The Army's release the same day pairs BWXT with Fort Campbell but names no power recipient or agreement. U.S. Army chooses BWXT BANR for Janus program

Not found in the sources we checked. The Army's 26 August 2026 release pairs BWXT Advanced Technologies with Fort Campbell, and BWXT's release describes a phased Janus contract whose first phase covers site selection, regulatory work and starting fuel fabrication, with groundbreaking targeted for late 2028. BWXT is the project's own vendor and intended operator, so this is not a separate contractor appointment. Neither source names an engineering or construction contractor. Army reaches agreement with private industry for nuclear micro reactors; U.S. Army chooses BWXT BANR for Janus program

Source-backed project statement The Army's 26 August 2026 release says Janus vendors, including BWXT Advanced Technologies for Fort Campbell, will receive government funding only after hitting technical milestones, from about $2.2 billion across fiscal years 2027 to 2031 for all vendors, alongside vendor capital. This is conditional, milestone-based Army funding. No amount for Fort Campbell is stated and no milestone payment has been reported. Army reaches agreement with private industry for nuclear micro reactors

Source-backed project statement BWXT's 26 August 2026 release says the first phase of its Fort Campbell Janus work includes initiating TRISO fuel fabrication at existing BWXT facilities, and POWER Magazine the same day says this will begin at BWXT's NRC-licensed Lynchburg, Virginia facility. This is a planned start of fabrication by the vendor itself. No quantity, delivery date or completed fabrication is stated. U.S. Army chooses BWXT BANR for Janus program; POWER: U.S. Army mobilizes $2.2B Janus program

Comparable schedule revision not established. BWXT's 26 August 2026 release targets groundbreaking at Fort Campbell in late 2028 and reactor operations in the early 2030s, and POWER Magazine repeats these the same day. Targets stated once on the announcement day are not a revision. U.S. Army chooses BWXT BANR for Janus program

Calogena NetZeroHeat CAL30 heat reactor for PierrelatteFranceAnnouncedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded
  • Vendor for the linked designCalogena
Not recorded

No separate question review is recorded.

Not recorded

No separate question review is recorded.

Source-backed project statement The European Commission lists NetZeroHeat, coordinated by Calogena, among projects selected on 19 October 2026 and says promoters have been invited to prepare grant agreements, with results due in the first quarter of 2027. Calogena's 2 November 2026 release gives the amount as €40 million and says it would contribute to potential construction. A selection is not a signed grant agreement or a payment. European Commission: IF25 Net-Zero Technologies call, projects description; European Commission press release IP/26/2187 on Innovation Fund selections; Calogena obtient 40 M€ de la Commission européenne pour son premier réacteur nucléaire commercial

Not recordedNo project-specific fuel supply arrangement is recorded as a structured fact.

No separate question review is recorded.

Not recordedNot recorded

No separate question review is recorded.

Calogena nuclear heating plant at CEA CadaracheFranceSitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
  • OperatorCalogena
  • Vendor named for this project (no design profile is linked)Calogena

Source-backed project statement Calogena's September 2026 consultation dossier for the Cadarache heating plant says a long-term heat purchase agreement is planned with the heat-network operator to fix a stable price for the contract's duration, and that heat-supply contracts would typically run 30 years. The heat-network operator is not named, and CEA is described as the host. The agreement is planned, not signed. Calogena: Cadarache public consultation dossier

Not found in the sources we checked. Calogena's 11 September 2026 press release and its Cadarache consultation dossier name no engineering or construction contractor for the plant. They say CEA, as host providing a parcel, signed a July 2025 letter of intent with Calogena for siting and heat-network connection studies of equipment that Calogena itself would design, build and operate. No creation authorization has been applied for. Calogena launches prior consultation on its nuclear heating plant at CEA Cadarache; Calogena: Cadarache public consultation dossier; ASNR, PRM projects and their fuel-fabrication plants

Source-backed project statement Calogena's 2026 Cadarache consultation dossier says the initial construction capital for the module is to be provided by shareholders, Calogena where applicable, and debt, against an equipment estimate of €104 to 208 million, with a long-term heat purchase agreement planned. This is a planned financing structure without named lenders or committed amounts. The France 2030 aid of €5.2 million and €48 million and the press release's €100 million are funding of Calogena the company, not allocations to Cadarache. The €40 million Innovation Fund grant Calogena announced on 2 November 2026 is stated for its Pierrelatte project, not Cadarache. Calogena: Cadarache public consultation dossier; Calogena launches prior consultation on its nuclear heating plant at CEA Cadarache

Source-backed project statement Calogena's 2026 Cadarache consultation dossier says the fuel assemblies could be produced by Framatome at Romans-sur-Isère and that Orano could supply the fuel material, conversion and enrichment. It also claims secured uranium supply contracts without naming the sellers or a quantity for Cadarache. These are conditional supply intentions, not a signed fabrication contract, allocation or delivery for this plant. Calogena: Cadarache public consultation dossier

Not recorded

Comparable schedule revision not established. Calogena's 2026 Cadarache consultation dossier states one set of targets: a creation-authorization application in mid-2027, construction from late 2029 and entry into service in late 2032. The 11 September 2026 press release's 2032 first commercial deployment is consistent with that, and the ASNR page lists design safety-option requests, not project milestones. No source read gives an earlier and a later date for the same milestone. Calogena: Cadarache public consultation dossier; ASNR, PRM projects and their fuel-fabrication plants; Calogena launches prior consultation on its nuclear heating plant at CEA Cadarache

Cambridge Atomworks ODIN prototype at Berkeley GreenUnited KingdomAnnouncedNot recorded

Not found in the sources we checked. Cambridge Atomworks' letter-of-intent announcement says the Berkeley Green prototype would answer physics and thermal-hydraulics questions for regulators and later serve as a training facility. It is a research prototype, and the announcement names no user or buyer of any heat or power. Cambridge Atomworks: Chiltern Vital Group and Cambridge Atomworks sign Berkeley Green site letter of intent

Not found in the sources we checked. Cambridge Atomworks' announcement says it and Chiltern Vital Group signed a letter of intent for ODIN research and development at the Berkeley Green Science and Technology Park, which Chiltern Vital Berkeley owns and is developing. That is the site developer agreeing to host the vendor's prototype, not a contractor appointment, and no engineering or construction contractor is named. Cambridge Atomworks: Chiltern Vital Group and Cambridge Atomworks sign Berkeley Green site letter of intent

Not found in the sources we checked. Cambridge Atomworks' Berkeley Green letter-of-intent announcement states no funder, amount or financing for the ODIN prototype. Cambridge Atomworks: Chiltern Vital Group and Cambridge Atomworks sign Berkeley Green site letter of intent

Not found in the sources we checked. Cambridge Atomworks' Berkeley Green letter-of-intent announcement names no fuel type, supplier, quantity or delivery for the ODIN prototype. Cambridge Atomworks: Chiltern Vital Group and Cambridge Atomworks sign Berkeley Green site letter of intent

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Cambridge Atomworks' Berkeley Green letter-of-intent announcement gives no construction, criticality or operation date for the ODIN prototype. With no dated target there is nothing to revise. Cambridge Atomworks: Chiltern Vital Group and Cambridge Atomworks sign Berkeley Green site letter of intent

CAREM-25ArgentinaSuspendedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
  • Vendor for the linked designCNEA (Argentina)

Not found in the sources we checked. The 2024 IAEA SMR catalog describes CAREM as an electricity source for regions with small demand that can also support desalination. That is a design application. Neither the catalog, the IAEA PRIS record nor EconoJournal's 2 April 2026 report names a buyer or supply agreement for the CAREM25 prototype's output. Small Modular Reactor Technology Catalogue, 2024 edition: CAREM; EconoJournal: CAREM paused; CNEA to downgrade the project (April 2026)

Source-backed project statement CNEA's undated presentation reports a contract signed with Na-Sa in the first half of 2020 to complete the CAREM25 nuclear building's civil works. This is a historical civil-works contract, not a full EPC award or confirmation of the contractor's status after the later suspension. The presentation's publication date is not established. CNEA presentation by Adriana C. Serquis: CAREM-25 future milestones

Source-backed project statement EconoJournal reported in April 2026, attributing the estimate to the Secretaría de Asuntos Nucleares, that at least roughly US$750 million of capital had been invested in the prototype. This is an attributed press-reported estimate, not a verified current budget, new award or itemized disbursement. EconoJournal: CAREM paused; CNEA to downgrade the project (April 2026)

Source-backed project statement CNEA's annual report for 2013 records a contract signed with CONUAR on 9 October 2013 to manufacture nuclear fuel elements and control-rod assemblies for CAREM. Its CONUAR section describes a five-year contract term. This establishes a historical project-specific fabrication commitment, not current contract validity, completed fuel fabrication or delivery to the suspended project. Those later outcomes are not established by the reviewed report. Small Modular Reactor Technology Catalogue, 2024 edition: CAREM; CNEA: Memoria y Balance Anual 2013, CAREM and CONUAR sections

Not recorded

Source-backed project statement CAREM-25 has a partial history of changed criticality expectations. POWER's 1 January 2015 article attributed a 2017 criticality target to CNEA, without dating CNEA's statement. An undated CNEA presentation by Adriana C. Serquis separately listed first criticality in the first half of 2025. Its content establishes only that it was prepared no earlier than mid-2021; the conference label and upload path do not establish its statement date or place it precisely in the forecast sequence. World Nuclear News reported on 30 October 2023 that CNEA had expected initial criticality by the end of 2027 in an October 2022 statement. The dated attribution and full sequence remain incomplete, so these accounts are not treated as a single ten-year delay. The reviewed evidence establishes no current criticality target; the recorded 2025 construction suspension is not a revised target date. IAEA PRIS statistics: reactors by country code (Argentina), captured 9 October 2026; EconoJournal: CAREM paused; CNEA to downgrade the project (April 2026); Small Modular Reactors Speaking in Foreign Tongues; CNEA and Nucleoeléctrica sign CAREM SMR agreement - World Nuclear News; CNEA presentation by Adriana C. Serquis: CAREM-25 future milestones

Cascade Advanced Energy FacilityUnited StatesSiting
  • Vendor for the linked designX-energy
  • Customer / offtakerAmazon

Source-backed project statement Energy Northwest's 16 October 2024 release says Amazon will have the right to purchase electricity from the first four-module project, expected to be about 320 megawatts, with further output available to Amazon and other Northwest utilities. That is a purchase right, not a binding power-sales contract. The 26 March 2026 regulatory plan says the plant would serve subscribers and names no other customer. Energy Northwest: Amazon, Energy Northwest announce plans to develop advanced nuclear technology in Washington; NRC ADAMS ML26085A601: Energy Northwest New Nuclear Regulatory Engagement Plan, Revision 3

Source-backed project statement Energy Northwest's 23 October 2025 release says it is negotiating with Cascade Nuclear Partners, a joint venture of Kiewit, Black & Veatch and Aecon, to plan, design and construct the first four Xe-100 modules under a progressive design-build model. The development phase is to define scope, schedule and cost before full execution. No construction contract is stated. Energy Northwest: Energy Northwest selects design builder for Cascade Advanced Energy Facility

  • Funder or lender named for this projectAmazon

Source-backed project statement Energy Northwest's 16 October 2024 release says Amazon will fund the initial feasibility phase, with no amount or payment stated. The 26 March 2026 regulatory plan says the company is exploring financing and that the Department of Energy loan office approved Part I of Energy Northwest's loan application, which only allows a Part II application to be prepared. That is not a loan or construction funding. Energy Northwest: Amazon, Energy Northwest announce plans to develop advanced nuclear technology in Washington; NRC ADAMS ML26085A601: Energy Northwest New Nuclear Regulatory Engagement Plan, Revision 3

Not found in the sources we checked. Energy Northwest's 2024 Amazon agreement release and its 2025 design-builder release describe X-energy as a developer of reactor and fuel technology and the Xe-100 as a high-temperature gas-cooled design. They name no fuel supplier, fabrication contract or delivery for the Cascade modules. Energy Northwest: Amazon, Energy Northwest announce plans to develop advanced nuclear technology in Washington; Energy Northwest: Energy Northwest selects design builder for Cascade Advanced Energy Facility

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Energy Northwest's 2025 Cascade naming release and its design-builder release both say construction is anticipated to begin by the end of the decade, with operations targeted for the 2030s. The same target repeated is not a revision, and the releases read give no earlier or later date for either milestone. Energy Northwest Cascade naming release; Energy Northwest: Energy Northwest selects design builder for Cascade Advanced Energy Facility

Centrica / X-energy Xe-100 plant at HartlepoolUnited KingdomAnnounced
  • Project proposerCentrica
  • Project proposerX-energy
Not recorded
  • Vendor for the linked designX-energy

Not found in the sources we checked. The 15 September 2025 X-energy and Centrica release and the UK government's 4 February 2026 notice name no buyer, contracted quantity or purchase agreement for power or heat from a Hartlepool Xe-100 plant. The 960 MW and 1.5 million homes figures describe what 12 units could add, and EDF's support for the plans reflects its site-owner role. X-energy and Centrica joint development agreement (Hartlepool); Government to unlock advanced nuclear to grow economy

Not found in the sources we checked. The 15 September 2025 release says Centrica and X-energy, the two proposers, signed a joint development agreement and are in discussions with potential equity partners and unnamed engineering and construction companies to form a UK development company. No engineering or construction contractor is named, and the UK government's 4 February 2026 notice describes plans, not an award. X-energy and Centrica joint development agreement (Hartlepool); Government to unlock advanced nuclear to grow economy

Source-backed project statement Centrica and X-energy’s announcement says Centrica will provide initial project capital for development. The amount and disbursement are not stated; this is prospective capital, not confirmation of paid expenditure. X-energy and Centrica joint development agreement (Hartlepool); Government to unlock advanced nuclear to grow economy

Not found in the sources we checked. The 15 September 2025 X-energy and Centrica release names TRISO-X as X-energy's fuel technology but states no fuel supplier, allocation, fabrication or delivery for Hartlepool, and the UK government's 4 February 2026 notice names no fuel arrangement. The release's Dow and Energy Northwest plants are other projects. X-energy and Centrica joint development agreement (Hartlepool)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The 15 September 2025 release gives one target, first electricity in the mid-2030s subject to regulatory approval, plus a 2026 goal for full-scale development activities and the existing station's 2028 closure, which are different milestones. The UK government's 4 February 2026 notice restates no date. No revision of the same milestone is shown. X-energy and Centrica joint development agreement (Hartlepool)

CGN Bohai ACPR50S floating SMR demonstration proposalEarlier-plan recordChinaAnnouncedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Source-backed project statement The China Atomic Energy Authority's 18 January 2016 news item, attributed to CGN, says CGN and China National Offshore Oil Corporation signed a strategic cooperation framework on 14 January 2016 that would help promote use of the ACPR50S in offshore oil and gas fields, for power, heat and desalination. That makes CNOOC a prospective user at framework level only. No field, berth, quantity or purchase contract is named. CAEA domestic news: CGN and CNOOC offshore small-reactor demonstration, 18 January 2016

Source-backed project statement A report by The Paper, carried by Huanqiu and dated only 4 November with no year printed, says CGN Research Institute signed a pressure-vessel procurement agreement with Dongfang Electric for the ACPR50S experimental-reactor platform after a tender. That is a component supply contract, not an engineering, procurement and construction award, and the berth for the platform is not named. CGN ACPR50S experimental platform pressure-vessel procurement (Huanqiu/Pengpai)

Not found in the sources we checked. The 2016 China Atomic Energy Authority item, the 20 January 2016 China Energy News report and The Paper's report on the pressure-vessel agreement state no amount, appropriation or financing for the ACPR50S platform. NDRC inclusion in the energy innovation plan is plan approval, not stated money, and the cost-reduction percentage and the roughly 3 billion yuan figure concern series building and a different platform. CGN ACPR50S experimental platform pressure-vessel procurement (Huanqiu/Pengpai); ACPR50S marine nuclear platform included in 13th FYP energy science plan

Not found in the sources we checked. The Paper's report on the ACPR50S pressure-vessel agreement gives a 30-month refuelling cycle and says the design relies on a mature nuclear-grade supply chain, which are design statements. Neither it nor the 2016 China Atomic Energy Authority and China Energy News items names a fuel supplier, fabrication or delivery for the platform. CGN ACPR50S experimental platform pressure-vessel procurement (Huanqiu/Pengpai)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The 20 January 2016 China Energy News report says CGN expected to start demonstration-project construction in 2017 and generate power in 2020. The Paper's later report calls the pressure-vessel agreement the formal start of ACPR50S construction but prints no year. No source read gives a second dated target for the same construction or power milestone, so no revision is shown. ACPR50S marine nuclear platform included in 13th FYP energy science plan; CGN ACPR50S experimental platform pressure-vessel procurement (Huanqiu/Pengpai)

CNEC / Zheneng Sanmen HTGR power stationChinaSitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Not found in the sources we checked. The 21 August 2017 China Energy News report of Zheneng Power's 11 August board resolution says the joint venture's business includes building and operating a station, desalination and heat supply, and selling electricity and related products. No buyer is named. The 22 November 2017 account of the preliminary-feasibility review also names no customer. China Energy News: CNEC Zhejiang Sanmen HTGR station preparatory work

Not found in the sources we checked. The 2017 reports name Zheneng Power and the nuclear-construction group's high-temperature-reactor holding company as shareholders of the project company. The November review says an unnamed design organization prepared the preliminary feasibility report. No engineering or construction contractor is named, and no construction award is stated. China Energy News: CNEC Zhejiang Sanmen HTGR station preparatory work; The Paper: CNEC Zhejiang Sanmen HTGR pre-feasibility study passes review

Source-backed project statement The 21 August 2017 report says the joint venture was to be formed with registered capital of 30 million yuan. The high-temperature-reactor holding company subscribed 15.3 million yuan for 51 percent, and Zheneng Power subscribed 14.7 million yuan for 49 percent. Later increases were to follow state approval of the project investment. This is formation capital, not a statement that plant construction costs were paid. China Energy News: CNEC Zhejiang Sanmen HTGR station preparatory work

Not found in the sources we checked. China Energy News of 21 August 2017, World Nuclear News of 19 September 2017 and The Paper of 22 November 2017 describe the Sanmen HTGR joint venture, its site replies and its pre-feasibility review, and the pebble-bed technology platform, but none names a fuel manufacturer, quantity or delivery for the Sanmen station. The graphite-sphere loading in the 2017 report concerns the separate HTR-PM demonstration. China Energy News: CNEC Zhejiang Sanmen HTGR station preparatory work; WNN: China plans further high-temperature reactor innovation

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. China Energy News of 21 August 2017 and The Paper of 22 November 2017 date the 2017 preparatory steps, site-selection and land pre-review replies and a pre-feasibility review on 16 and 17 November 2017, and The Paper says the project was still far from realisation. None gives a construction or operation target for the Sanmen station, so no schedule revision is shown. China Energy News: CNEC Zhejiang Sanmen HTGR station preparatory work; The Paper: CNEC Zhejiang Sanmen HTGR pre-feasibility study passes review; WNN: China plans further high-temperature reactor innovation

CNNC floating SMR demonstration proposal (2016)Earlier-plan recordChinaAnnouncedNot recorded

Not found in the sources we checked. The China Atomic Energy Authority's 15 January 2016 item, credited to Xinhua and CNNC, says the ACP100S could supply heat, power and water to offshore drilling platforms, island developments and remote areas. Those are classes of use, and no buyer, platform or quantity is named for the floating demonstration. 我国唯一具备完整自主知识产权的海上浮动核电站立项

Not found in the sources we checked. The China Atomic Energy Authority's 15 January 2016 item says CNNC's Nuclear Power Institute of China completed preliminary design of the floating plant jointly with unnamed domestic hull-platform design and manufacturing units, and that a cooperation agreement with Lloyd's Register and the IAEA covers safety review and standards for floating plants generally. No named engineering or construction contractor for the demonstration is stated. 我国唯一具备完整自主知识产权的海上浮动核电站立项

Not found in the sources we checked. The China Atomic Energy Authority's 15 January 2016 item says NDRC agreed to include CNNC's ACP100S in the 13th Five-Year energy innovation plan, which is plan inclusion, and states no amount, budget or funder for the floating demonstration. 我国唯一具备完整自主知识产权的海上浮动核电站立项

Not found in the sources we checked. The China Atomic Energy Authority's 15 January 2016 item describes the ACP10S, ACP25S and ACP100S floating reactor family and its patents but names no fuel supplier, fabrication or delivery for the demonstration. 我国唯一具备完整自主知识产权的海上浮动核电站立项

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. The China Atomic Energy Authority's 15 January 2016 item states one plan, to start building the demonstration at the end of 2016 and complete and operate it in 2019. No later source read restates or moves those dates, so no revision is shown, and the dates are plans, not achievements. 我国唯一具备完整自主知识产权的海上浮动核电站立项

Community Nuclear Power North Teesside AP300 proposalUnited KingdomAnnouncedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Not found in the sources we checked. Westinghouse's 8 February 2024 release says the AP300 suits grid generation, industrial sites, hydrogen, e-fuels, desalination and district heating, and that the North Teesside region has growing electricity demand. It names no buyer, quantity or offtake agreement for the four North Teesside units. Westinghouse / Community Nuclear Power Teesside proposal

Source-backed project statement Westinghouse's 8 February 2024 release says Community Nuclear Power signed an agreement with Westinghouse aimed at four AP300 units in North Teesside and is working with strategic partners, including Jacobs and Interpath Advisory, to develop a fully licensed site targeted for 2027. These are preparatory site-development partners. The release does not describe an engineering, procurement and construction award or a notice to proceed. Westinghouse / Community Nuclear Power Teesside proposal

Source-backed project statement Westinghouse described the North Teesside project as privately funded. Its release does not state a financing amount, named investor or disbursement. Westinghouse / Community Nuclear Power Teesside proposal

Not found in the sources we checked. Westinghouse's 8 February 2024 release says the AP300 uses AP1000 engineering, components and supply chain. That is design heritage, not fuel supply. The release names no fuel supplier, allocation or delivery for the four North Teesside units. Westinghouse / Community Nuclear Power Teesside proposal

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Westinghouse's 8 February 2024 release gives a 2027 target for a fully licensed North Teesside site and commercial operation expected by the early 2030s. These targets are stated once in the source read, so they show no revision of either milestone. Westinghouse / Community Nuclear Power Teesside proposal

Copenhagen Atomics critical experiment at the Paul Scherrer InstituteSwitzerlandSitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.

Not found in the sources we checked. PSI's BALDER FAQ says PSI is not building a nuclear power plant, since new plants are prohibited in Switzerland, and its 1 July 2024 release describes a critical experiment to validate Copenhagen Atomics' technology. Neither names a user or buyer of heat or power from the experiment. PSI: questions and answers on BALDER; PSI: cooperation in reactor research (Copenhagen Atomics)

Not found in the sources we checked. PSI's 1 July 2024 release describes a four-year collaboration agreement with Copenhagen Atomics, PSI's FAQ says Copenhagen Atomics contributes pumps, components and high-purity salts while PSI builds an additional building, and ENSI says PSI is preparing the application with Copenhagen Atomics. PSI is the intended operator and Copenhagen Atomics the vendor, so these are not contractor appointments. No other engineering or construction firm is named. PSI: cooperation in reactor research (Copenhagen Atomics); PSI: questions and answers on BALDER; ENSI: Projekt BALDER (page modified 15 June 2026)

Source-backed project statement PSI's BALDER FAQ says the costs of approval, construction, commissioning and implementation of the reactor experiment will be borne in full by Copenhagen Atomics and that no Swiss taxpayer money will be used. PSI says it cannot give the total cost. This is full funding by the vendor with no amount disclosed. PSI: questions and answers on BALDER

Not found in the sources we checked. PSI's BALDER FAQ says this reactor type uses molten salt with uranium fluoride fuel, and PSI's 1 July 2024 release describes Copenhagen Atomics' salt production. These are design and company-capability statements. Neither names a fuel quantity, allocation or delivery for the PSI experiment. PSI: questions and answers on BALDER; PSI: cooperation in reactor research (Copenhagen Atomics)

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. PSI’s 1 July 2024 release targeted a critical experiment in 2026. Its FAQ statement labeled Q2 2026 acknowledges delay to tests originally planned for 2026 and expects first tests no earlier than 2028. The program distinguishes cold tests, hot tests and criticality. This supports a program delay but does not establish a revised first-criticality date or an exact two-year slip. PSI: cooperation in reactor research (Copenhagen Atomics); PSI: questions and answers on BALDER; ENSI: Projekt BALDER (page modified 15 June 2026)

Cwmni Egino small modular reactor proposal at TrawsfynyddUnited KingdomDeferred
  • Project proposerCwmni Egino
Not recordedReviewed 19 Oct 2026: not disclosed in the reviewed evidence.Not recorded

Not found in the sources we checked. Cwmni Egino's What Next page discusses technology choice and socio-economic benefits, its homepage says it ceased operations on 31 March 2026, and DESNZ's 4 February 2026 news lists Trawsfynydd as surplus land for clean energy. None names a buyer of power or heat from a Trawsfynydd reactor. Cwmni Egino: what next for Trawsfynydd; Government to unlock advanced nuclear to grow economy; Cwmni Egino website home page (ceased-operations notice)

Not found in the sources we checked. The Welsh Government's 3 December 2025 statement says Cwmni Egino was set up in 2021 to deliver a Trawsfynydd site development plan, with an aspiration then of an SMR under construction by 2027, and Cwmni Egino's What Next page says a technology was still to be chosen. Cwmni Egino is the proposer, and no engineering, study or construction contractor is named. The company ceased operations on 31 March 2026. Welsh Government written statement: Cwmni Egino Ltd (3 December 2025); Cwmni Egino website home page (ceased-operations notice); Cwmni Egino: what next for Trawsfynydd

Source-backed project statement The Welsh Government's 3 December 2025 statement says Cwmni Egino, set up in 2021 to deliver a Trawsfynydd site development plan, operated under a Welsh Government funding agreement ending on 31 March 2026, and Cwmni Egino says it ceased operations then because funding was not continued. This was Welsh Government funding for the project's development company. No amount is stated, and the funding has ended. Cwmni Egino website home page (ceased-operations notice); Welsh Government written statement: Cwmni Egino Ltd (3 December 2025)

Not found in the sources we checked. Cwmni Egino's What Next page says it was in discussions with technology providers and would choose a technology, and the Welsh Government's 3 December 2025 statement names none. No reactor technology or fuel supplier was selected for Trawsfynydd. Cwmni Egino: what next for Trawsfynydd; Welsh Government written statement: Cwmni Egino Ltd (3 December 2025)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The Welsh Government's 3 December 2025 statement recalls an earlier aspiration of an SMR under construction at Trawsfynydd by 2027 and says the site was left out of the UK's initial SMR competition sites in May 2024 and Cwmni Egino would be wound down. It gives no replacement construction date, so this is a deferral, not a dated revision. Welsh Government written statement: Cwmni Egino Ltd (3 December 2025); Cwmni Egino website home page (ceased-operations notice)

Daegu i-SMR proposal at the Gunwi industrial complexSouth KoreaDeferredNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Not found in the sources we checked. Yonhap's 3 February 2026 report says Daegu's plan aimed to reduce energy costs for companies locating in the Gunwi advanced industrial complex, and World Nuclear News' 3 July 2024 report places the plant there. Neither names a company or other buyer that agreed to take the plant's power or heat. Yonhap (via Daum): Daegu's first-unit SMR bid falls through; later unit sought (3 February 2026)

Not found in the sources we checked. World Nuclear News reported on 3 July 2024 that Daegu and KHNP signed a memorandum including a feasibility study for the Gunwi plant, to be done with KHNP and private construction companies that the article does not name. KHNP is the i-SMR developer, so this is not a separate contractor appointment, and the construction companies are unnamed. Yonhap reported on 3 February 2026 that the city's first-unit plan fell through because the site call required a coastal site. WNN: Korean city to study feasibility of i-SMR deployment; Yonhap (via Daum): Daegu's first-unit SMR bid falls through; later unit sought (3 February 2026)

Source-backed project statement World Nuclear News reported on 3 July 2024 that a newly created special-purpose corporation would buy about 160,000 square metres at the Gunwi complex and that the total project cost of KRW 4 trillion (USD 2.9 billion) would be entirely financed by that corporation. This is a planned financing structure, not funds raised. The article does not say the corporation had been formed, and Daegu's first-unit plan fell through in February 2026. WNN: Korean city to study feasibility of i-SMR deployment

Not found in the sources we checked. World Nuclear News' 3 July 2024 report describes the i-SMR as a 170 MWe integrated pressurised water reactor. Neither it nor Yonhap's 3 February 2026 report names a fuel supplier, quantity or delivery for the Gunwi plant. WNN: Korean city to study feasibility of i-SMR deployment

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. World Nuclear News reported on 3 July 2024 that Daegu targeted standard design approval in 2028 and commercial development in 2033, and Yonhap on 3 February 2026 restated the 2033 aim while reporting that the first-unit plan had fallen through, with no date for a further site call. Neither source gives a replacement date, so this is a stalled plan, not a dated revision. WNN: Korean city to study feasibility of i-SMR deployment; Yonhap (via Daum): Daegu's first-unit SMR bid falls through; later unit sought (3 February 2026)

Dalane / Lund SMR proposalNorwaySitingNot recordedNot recorded

Not found in the sources we checked. The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft Dalane assessment; Norsk Kjernekraft: locations (ten project companies)

Not found in the sources we checked. The reviewed sources do not establish an additional project-specific engineering, preparatory-work or construction assignment. A supplier’s general capabilities or an industry-wide agreement do not establish a contract for this site. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft Dalane assessment

Source-backed project statement The 27 April 2026 release identifies Lund as a co-owner and describes financing studies and a still-distant final investment decision. It states no plant funding amount or paid contribution. Norsk Kjernekraft Dalane assessment

Not found in the sources we checked. The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft Dalane assessment

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft Dalane assessment

Daqing NHR-200 nuclear heating plant (1990s)Earlier-plan recordChinaLicensingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Source-backed project statement IAEA-TECDOC-965 (September 1997) says the NHR-200 demonstration plant at Daqing would be the main heat source for that city's district heating grid, about 2.5 km from the city boundary, and that the grid supply temperature was raised to 130°C at the customer's request. The customer is not named, and no heat-supply contract is stated. IAEA-TECDOC-965: Design approaches for heating reactors

Not found in the sources we checked. IAEA-TECDOC-965 says it had been decided to build an NHR-200 demonstration plant in Daqing, that the basic design was finished and that detailed design was under way. The account names no engineering or construction contractor for that plant. IAEA-TECDOC-965: Design approaches for heating reactors

Not found in the sources we checked. IAEA-TECDOC-965 records the decision to build an NHR-200 demonstration plant at Daqing and the approval of its siting report, environmental assessment and feasibility study. That account states no funder, budget or amount for the plant. IAEA-TECDOC-965: Design approaches for heating reactors

Not found in the sources we checked. IAEA-TECDOC-965 says the integrated NHR-200 design for Daqing includes in-vessel spent-fuel storage. That is a design feature. The account names no fuel supplier, fabrication contract or delivery for the plant. IAEA-TECDOC-965: Design approaches for heating reactors

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. IAEA-TECDOC-965 (September 1997) says in its summary that the first NHR-200 was expected to operate in 2000, and in an INET paper in the same volume that it was expected in 1999. Those are inconsistent expectations in one volume, not an earlier forecast later revised. IAEA-TECDOC-965: Design approaches for heating reactors

Darlington BWRX-300 Unit 1CanadaConstruction

Not found in the sources we checked. No buyer of the station's output, offtake contract or payment amount is named in the sources read. Ontario's regulatory registry decision posted on 16 January 2026 says O. Reg. 53/05, the regulation on payments under section 78.1 of the Ontario Energy Board Act, was amended effective 1 January 2026 to prescribe DNNP GP Inc., acting for the DNNP LP partnership, as a rate-regulated generator for the DNNP Nuclear Generating Station, which remains subject to OEB rate-setting; the regulation previously prescribed OPG. This is a station-wide regulated payment framework, not a sale contract with a named buyer. World Nuclear News: OPG secures government equity financing for SMR project; ERO 025-0501: Regulatory amendments to support financing for OPG's major nuclear projects (decision)

Source-backed project statement World Nuclear News reported on 9 May 2025 that Aecon Kiewit Nuclear Partners was awarded the execution-phase construction contract for OPG's Darlington BWRX-300 under an integrated project delivery model with GE Vernova Hitachi and AtkinsRéalis. This records the award and its scope; the award announcement alone does not establish physical construction progress. WNN: Construction contract awarded for Darlington SMR

Source-backed project statement The Canada Infrastructure Bank finalized an agreement in October 2022 committing C$970 million to Phase 1 of the first Darlington SMR. In October 2025 the Canada Growth Fund committed up to C$2 billion and the Building Ontario Fund C$1 billion in equity in the four-unit project, subject to conditions, with the first tranche funding this first unit. On 23 June 2026 the Williams Treaties First Nations announced a C$700 million loan to the project partnership for building the first unit, converting to equity later and backed by federal and Ontario loan guarantees. Disbursed amounts are not stated. Canada Infrastructure Bank: CIB commits $970 million towards Canada's first small modular reactor; World Nuclear News: OPG secures government equity financing for SMR project; World Nuclear News: First Nations group takes stake in Ontario nuclear plant; Department of Finance Canada: Government announces largest Indigenous loan guarantee in Canadian history to support Darlington New Nuclear Project

  • Fuel supplier named for this projectCameco
  • Fuel supplier named for this projectUrenco
  • Fuel supplier named for this projectOrano
  • Fuel supplier named for this projectGlobal Nuclear Fuel-Americas, LLC

Source-backed project statement World Nuclear News reported on 30 November 2023 that OPG selected Cameco to be contracted for natural uranium hexafluoride, Urenco USA for enrichment, Orano for additional enriched uranium product and Global Nuclear Fuel-Americas for fabrication and fuel assemblies, to secure fuel for the first Darlington BWRX-300. Urenco called it the first long-term SMR fuel supply agreement. No delivery or fuel loading is reported. WNN: SMR fuel supply chain grows as agreements signed

Not recorded

Source-backed project statement World Nuclear News reported on 30 November 2023 that OPG planned to have the first Darlington BWRX-300 online by the end of 2029, and on 24 October 2025 that OPG expects to connect it to the grid by the end of 2030. The grid-connection target has moved from end-2029 to end-2030. These are company targets, and the record already stores the pair. OPG's 2025 annual MD&A (12 March 2026) still gave grid connection by the end of 2030, and its first-quarter 2026 MD&A (5 May 2026) an expected in-service year of 2030, both with a C$7.7 billion approved budget. On 10 November 2026 OPG's third-quarter release (read as republished by Cantech Letter) said Unit 1 is no longer expected to meet its previously disclosed October 2030 commercial-operation target or C$7.7 billion estimate; the release gives no replacement date or cost and does not mention grid connection, so no new pair is recorded. OPG's third-quarter MD&A was not read. WNN: SMR fuel supply chain grows as agreements signed; World Nuclear News: OPG secures government equity financing for SMR project; Ontario Power Generation: OPG Reports 2026 Third Quarter Financial Results (10 November 2026), OPG release as republished by Cantech Letter; Ontario Power Generation: 2025 annual Management's Discussion and Analysis (OEB-filed copy, 12 March 2026); Ontario Power Generation: 2026 first-quarter results release and MD&A (OEB-filed copy, 5 May 2026)

Darlington BWRX-300 Units 2-4CanadaSitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.

Not found in the sources we checked. The CNSC's Darlington New Nuclear Project page, modified 25 August 2026, and World Nuclear News of 2 April 2026 name Ontario Power Generation as site owner and licensee but name no purchaser of power from Units 2 to 4. The Ontario ministry's jobs and GDP figures are economic estimates, not an offtake. CNSC: Darlington New Nuclear Project; WNN: OPG applies for operating licence for BWRX-300 SMR

Not found in the sources we checked. The CNSC's Darlington New Nuclear Project page, modified 25 August 2026, says OPG selected the BWRX-300 in December 2021 and that a construction application for up to three additional units is only a possibility. The CNSC's 4 April 2025 decision on the one-unit construction license names GE Vernova Hitachi, AtkinsRéalis and Aecon as OPG's contract partners for that application. No source read assigns engineering or construction contracts to Units 2 to 4. CNSC: Darlington New Nuclear Project; CNSC Record of Proceedings, Including Reasons for Decision: OPG application for a licence to construct one BWRX-300 (CMD 24-H3)

Not found in the sources we checked. World Nuclear News of 2 April 2026 says Ontario approved a CAD 20.9 billion budget and construction start for the first of the four planned BWRX-300s. OPG's 2025 annual MD&A (12 March 2026) gives the Board-approved budget for Unit 1 as C$7.7 billion, including C$1.6 billion of systems and services common to all four units, and about C$20.9 billion as the current estimate for the whole four-unit project, so the WNN sentence attaches the four-unit estimate to the first unit's approval. The CNSC page states no amount. The four-unit GDP and jobs figures are economic estimates. No source read states a budget, approval or financing for Units 2 to 4. WNN: OPG applies for operating licence for BWRX-300 SMR; Ontario Power Generation: 2025 annual Management's Discussion and Analysis (OEB-filed copy, 12 March 2026)

Not found in the sources we checked. World Nuclear News of 2 April 2026 says the BWRX-300 uses GE Vernova Hitachi's existing licensed GNF2 fuel design, which is a design statement. Neither it nor the CNSC Darlington page names a fuel supplier, contract, quantity or delivery for Units 2 to 4. WNN: OPG applies for operating licence for BWRX-300 SMR

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The CNSC page, modified 25 August 2026, and World Nuclear News of 2 April 2026 give dates for the first unit only, including grid connection planned by the end of 2030, and describe a construction application for up to three more units only as a possibility. The site-preparation license's 2031 expiry is not a milestone. No dated target for Units 2 to 4 was read, so no revision is shown. CNSC: Darlington New Nuclear Project; WNN: OPG applies for operating licence for BWRX-300 SMR

Deep Atomic MK60 AI data-center campus proposal at INLUnited StatesAnnounced
  • Project proposerDeep Atomic
Not recorded
  • Vendor for the linked designDeep Atomic

Not found in the sources we checked. Data Center Dynamics reported on 2 December 2025 that Deep Atomic's consortium proposed an integrated nuclear-powered AI data-center campus at Idaho National Laboratory and that, if approved, it could be a model for federal campuses, national labs, cloud providers and private operators. The campus is the proposed load, and the article, Clayco's 12 February 2026 release and DOE's September 2025 notice name no buyer of its power or cooling. DCD: SMR developer Deep Atomic proposes nuclear-powered AI data center at INL

Source-backed project statement Data Center Dynamics reported on 2 December 2025 that the INL campus proposal is being developed by a Deep Atomic-led consortium including Parker Tide, Clayco, Gleeds, Paragon Energy Solutions, EvapCo Dry Cooling, Bedrock Labs, Azimuth Renewables, Future-Tech and MoonliteAI. Clayco's 12 February 2026 release says it provides early-stage delivery planning and constructability analysis for the consortium's DOE submissions, with the INL facility still pending DOE approval. These are proposal-stage partners, not a DOE selection or a construction contract. DCD: SMR developer Deep Atomic proposes nuclear-powered AI data center at INL; Clayco: supports Deep Atomic consortium with DOE submissions

Not found in the sources we checked. DOE's 8 September 2025 notice says lease projects at the INL site would be solely funded by the applicants, which is a program condition, not a funding commitment. Neither that notice, Data Center Dynamics' 2 December 2025 report nor Clayco's 12 February 2026 release states an amount, funder or financing close for Deep Atomic's INL campus proposal. DOE: Energy Department seeks proposals for AI data centers at INL; Clayco: supports Deep Atomic consortium with DOE submissions

Not found in the sources we checked. Data Center Dynamics' 2 December 2025 report describes the MK60 as a light-water SMR with 60 MW of electricity and 200 MW of thermal output. That is a design description. Neither it, Clayco's 12 February 2026 release nor DOE's September 2025 notice names a fuel supplier, quantity or delivery for an MK60 at INL. DCD: SMR developer Deep Atomic proposes nuclear-powered AI data center at INL

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. DOE's 8 September 2025 notice set 7 November 2025 for initial applications, Data Center Dynamics reported the proposal's submission on 2 December 2025 with data-center operations possible within 24 to 36 months on other power, and Clayco said on 12 February 2026 that DOE approval was pending. These are a deadline, a submission and a pending status, not two dates for one construction or operation milestone. DOE: Energy Department seeks proposals for AI data centers at INL; DCD: SMR developer Deep Atomic proposes nuclear-powered AI data center at INL; Clayco: supports Deep Atomic consortium with DOE submissions

Deep Fission Gravity pilot, ParsonsUnited StatesSitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
  • OperatorDeep Fission
  • Vendor for the linked designDeep Fission

Not found in the sources we checked. Deep Fission's Parsons site page and FAQ name no electricity or heat recipient for the Justin Freeman Energy Center pilot. The site page notes that Kansas law requires commercial power to be sold to a regulated utility, and the FAQ lists possible future users in general terms. Neither is an offtake agreement or a named customer. Deep Fission Parsons project page; Deep Fission Gravity reactor FAQ

Not found in the sources we checked. The Parsons site page credits the Deep Fission team with fabricating and delivering the first prototype canister, and the public safety design agreement says Deep Fission's engineering group and unnamed subcontractors design and implement the plant. No engineering, drilling, licensing or construction contractor is named for the Parsons pilot. Deep Fission Parsons project page; Deep Fission: public Gravity pilot Nuclear Safety Design Agreement, Revision 0; Deep Fission Gravity reactor FAQ

Not found in the sources we checked. The Parsons site page says Deep Fission was one of ten companies selected for the US Department of Energy Reactor Pilot Program and that the demonstration is subject to DOE authorization. Selection is program participation, not a stated grant, loan, cost share or amount. The opened pages give no project capital figure or financing instrument for the pilot. Deep Fission Parsons project page

Not found in the sources we checked. Deep Fission's FAQ says it will use low-enriched uranium from qualified suppliers, and the public safety design agreement describes conventional low-enriched PWR fuel assemblies. These are design-fuel statements. No supplier, allocation, fabrication order or delivery is named for the Parsons pilot. The site page anticipates interim storage of used fuel pending a national solution. Deep Fission Gravity reactor FAQ; Deep Fission: public Gravity pilot Nuclear Safety Design Agreement, Revision 0; Deep Fission Parsons project page

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. The undated Parsons site page targets Phase 1 for 2026–2027, the DOE pilot for 2027 and commercial operation for 2027–2028. Each phase target is stated once, so no comparable earlier and later target for the same milestone is recorded. The December 2025 groundbreaking ceremony is an achieved event, not a target change. Deep Fission Parsons project page; Deep Fission: public Gravity pilot Nuclear Safety Design Agreement, Revision 0

Deployable Energy Unity at Idaho National LaboratoryUnited StatesCommissioningNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
  • Vendor for the linked designDeployable Energy

Not found in the sources we checked. The Department of Energy exclusion approved on 15 April 2026 says the Unity activity is a zero-power test to confirm the core’s predicted neutronic performance, and that it will not generate electricity or usable heat. The July 2026 program slides call it a critical experiment below 1 watt thermal with no electrical output. Neither those texts nor the 1 July 2026 Nuclear News report names a research user, test beneficiary, or service customer. The developer and the laboratory host are not treated as customers. DOE Idaho categorical exclusion CX-271007 PDF: Unity zero-power criticality; DOE Office of Nuclear Energy: Reactor Pilot Program Update, slides filed with the NRC (ADAMS ML26198A212)

Not found in the sources we checked. The 15 April 2026 exclusion says Deployable Energy proposes the zero-power test inside an existing laboratory room. It names no engineering, FEED, or construction contractor, and the 1 July 2026 report does not add one. DOE Idaho categorical exclusion CX-271007 PDF: Unity zero-power criticality

Not found in the sources we checked. The 15 April 2026 exclusion, the July 2026 program slides, and the 1 July 2026 report describe the test and its criticality. They state no funder, instrument, or amount paid for this Unity test. Participation through the laboratory is not itself a disclosed payment. DOE Idaho categorical exclusion CX-271007 PDF: Unity zero-power criticality

Source-backed project statement The 15 April 2026 exclusion says about 536 kilograms of uranium dioxide enriched to 4.95 percent uranium-235 will be shipped to Idaho National Laboratory for the test, and that after the test the fuel will be disassembled into approved storage for future use. The July slides describe the same experiment’s fuel as below 5 percent uranium-235. No fuel manufacturer or supplier is named. Criticality on 30 June 2026 shows the test was fueled; the exclusion’s shipment sentence is the plan, not a named delivery receipt. DOE Idaho categorical exclusion CX-271007 PDF: Unity zero-power criticality; DOE Office of Nuclear Energy: Reactor Pilot Program Update, slides filed with the NRC (ADAMS ML26198A212)

Not recorded

Comparable schedule revision not established. The July 2026 slides list a preliminary safety analysis on 22 May 2026, the documented safety analysis on 11 June 2026, and criticality on 30 June 2026 as achieved dates. Full-power testing by 4 July 2027 is a later and different milestone. No source reviewed gives two forecasts for the same Unity milestone. DOE Office of Nuclear Energy: Reactor Pilot Program Update, slides filed with the NRC (ADAMS ML26198A212)

Deployable Energy Unity full-power test in INL's DOME (2027)United StatesSitingNot recorded
  • Vendor for the linked designDeployable Energy

Not found in the sources we checked. INL's 30 September 2026 release, as carried by KIFI, and the American Nuclear Society's 2 October 2026 report describe a conditional 2027 full-power test of Deployable Energy's 1 MWe Unity reactor in DOME. Neither names a buyer or user of the test's power. KIFI: Deployable Energy selected by NRIC to test its nuclear battery at DOME; ANS: Deployable Energy next in line for testing in NRIC's DOME

Not found in the sources we checked. INL's 30 September 2026 release says NRIC selected Deployable Energy to test its reactor in DOME in 2027, and the American Nuclear Society says Deployable filled DOME's second slot. That is a test host selecting the vendor, not a contractor appointment. Neither source names an engineering, fabrication or construction contractor for the Unity test. KIFI: Deployable Energy selected by NRIC to test its nuclear battery at DOME; ANS: Deployable Energy next in line for testing in NRIC's DOME

Source-backed project statement INL's 30 September 2026 release, as carried by KIFI, says Deployable Energy's DOME testing campaign is self-funded. The American Nuclear Society reports that NRIC's award conditions center on schedule and funding information. No amount is stated. KIFI: Deployable Energy selected by NRIC to test its nuclear battery at DOME; ANS: Deployable Energy next in line for testing in NRIC's DOME

Not found in the sources we checked. INL's 30 September 2026 release lists fuel availability as a condition of the test timeline, and the American Nuclear Society's 2 October 2026 report gives DOME's enrichment limit and says Deployable achieved zero-power criticality earlier. Neither names a fuel supplier, quantity or delivery for the DOME test. KIFI: Deployable Energy selected by NRIC to test its nuclear battery at DOME; ANS: Deployable Energy next in line for testing in NRIC's DOME

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. INL's 30 September 2026 release gives one target, a 2027 full-power test in DOME. The zero-power criticality reported for an earlier date is a separate experiment, not a different date for the DOME test. No earlier and later targets for the same milestone appear. KIFI: Deployable Energy selected by NRIC to test its nuclear battery at DOME; ANS: Deployable Energy next in line for testing in NRIC's DOME

Deployable Energy–Hornbeck Unity maritime demonstration proposalUnited StatesAnnouncedNot recorded
  • Vendor for the linked designDeployable Energy

Not found in the sources we checked. Deployable Energy's 28 August 2026 release says the Unity Nuclear Battery will be demonstrated with Hornbeck Offshore in an offshore environment to test power generation, transport and integration into maritime operations. Hornbeck is the demonstration partner, and no buyer, quantity or supply agreement for the demonstration's power is stated. Deployable Energy: INL full-power and Hornbeck maritime demonstrations

Not found in the sources we checked. Deployable Energy's 28 August 2026 release says NRIC selected it for a Launch Pad USA maritime demonstration that it will conduct with Hornbeck Offshore, which provides the offshore operational setting for integrating the Unity Nuclear Battery. That is a demonstration-host partnership and program selection, not an engineering or construction contract, and no vessel, port or other contractor is named. Deployable Energy: INL full-power and Hornbeck maritime demonstrations

Not found in the sources we checked. Deployable Energy's 28 August 2026 release describes NRIC's selection of the maritime demonstration under the Nuclear Energy Launch Pad, which is program participation, and states no amount, award or funder for the demonstration. Deployable Energy: INL full-power and Hornbeck maritime demonstrations

Not found in the sources we checked. Deployable Energy's 28 August 2026 release names no fuel supplier, fabrication or delivery for the maritime Unity demonstration. Deployable Energy: INL full-power and Hornbeck maritime demonstrations

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Deployable Energy's 28 August 2026 release gives no date for the maritime demonstration, so no schedule revision is shown. Deployable Energy: INL full-power and Hornbeck maritime demonstrations

Dimitrovgrad SVBR-100 pilot proposal (2013 land lease)Earlier-plan recordRussiaCanceledNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Not found in the sources we checked. World Nuclear News of 18 June 2013 says the SVBR-100 module could supply heat, industrial steam, desalination and electricity, and a regional official refers to an unnamed project customer that would own the finished unit. AKME-engineering's 28 April 2014 environmental impact assessment, book 5, names no buyer or consumer. No recipient, quantity or agreement for the Dimitrovgrad pilot's output is stated. WNN: Land secured for SVBR-100 pilot at Dimitrovgrad

Not found in the sources we checked. World Nuclear News of 18 June 2013 says AKME-Engineering, the Rosatom-founded developer of the SVBR-100, leased the Dimitrovgrad plot and had just received a license to provide construction services, and the 28 April 2014 environmental impact assessment is issued in AKME's name. AKME is the developer acting for itself. No separate engineering or construction contractor is named. The sources read for this review did not establish what later became of the pilot; the World Nuclear Association's Russia profile, read afterwards, says that "in 2018 the project had been dropped". WNN: Land secured for SVBR-100 pilot at Dimitrovgrad; AKME-engineering: SVBR-100 Ulyanovsk EIA, book 5, 28 April 2014

Not found in the sources we checked. World Nuclear News of 18 June 2013 describes a ten-year lease of a 15-hectare plot and AKME-Engineering's commitments to build an access road and two concrete plants, without any cost or rent. AKME-engineering's 28 April 2014 environmental impact assessment, book 5, states no investment, financing or budget for the pilot. No amount or funder is stated. WNN: Land secured for SVBR-100 pilot at Dimitrovgrad

Not found in the sources we checked. AKME-engineering's 28 April 2014 environmental impact assessment, book 5, says emergency centers must exist before nuclear fuel is brought to the SVBR-100 site, but names no supplier, fabricator or delivery. World Nuclear News of 18 June 2013 describes the lead-bismuth coolant, not fuel supply. AKME-engineering: SVBR-100 Ulyanovsk EIA, book 5, 28 April 2014

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. World Nuclear News of 18 June 2013 reported AKME's plan to start up the pilot in late 2018, and AKME's 28 April 2014 environmental impact assessment gives preparation in 2015 to 2016 and construction in 2016 to 2019. The later document dates construction, not startup, so the two do not state the same milestone. No source read gives a revised startup date. The 2018 year in the World Nuclear Association's profile, and in Global Energy Monitor's catalog, which cites that profile, is when they say the project ended, not a schedule statement. WNN: Land secured for SVBR-100 pilot at Dimitrovgrad; AKME-engineering: SVBR-100 Ulyanovsk EIA, book 5, 28 April 2014; GEM Global Nuclear Power Tracker public map ? Dimitrovgrad

Dominion North Anna SMR proposalUnited StatesAnnouncedNot recordedNot recorded

Not found in the sources we checked. The page says Dominion is developing one or more SMRs on the existing North Anna Energy Center property. It names no buyer, quantity, or agreement for those SMRs. The homes figure on the page belongs to the operating station. Dominion North Anna SMR planning

Not found in the sources we checked. The page says a commitment to construction has not been made and that Dominion is in the development phase for one or more SMRs. Factory construction is described for SMRs in general. No engineering or construction firm is named. Dominion remains the proposer, not a newly appointed SMR operator. Dominion North Anna SMR planning

Not found in the sources we checked. The page says smaller factory-built designs can possibly reduce project cost. That is a general description of SMRs. It states no amount, application, allocation, or disbursement for this proposal. Dominion North Anna SMR planning

Not found in the sources we checked. The page explains that SMRs, like the existing units, use fission by splitting uranium atoms. That is a description of the technology. It names no supplier, enrichment, quantity, or delivery for this proposal. Dominion North Anna SMR planning

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The page says construction has not been committed and gives no date for an SMR milestone. There are not two dated statements of the same milestone. The 945 and 950 megawatt sentences describe the existing station, not an SMR schedule. Dominion North Anna SMR planning

Dual Fluid critical demonstration experiment in RwandaRwandaLicensingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
  • Vendor for the linked designDual Fluid Energy

Not found in the sources we checked. The September 2023 reports and Dual Fluid's February 2026 paper describe a cooperation agreement: Rwanda provides the site and infrastructure, and Dual Fluid implements the critical experiment. The Globe and Mail and the company paper both say the demonstration is not to supply the grid. No energy buyer and no research-service customer are named. RAEB says the experiment is to study a low-power core for at most two years. Globe and Mail: Rwanda signs deal with Canadian startup to build nuclear reactor; Dual Fluid: February 2026 white paper, CDE programme; RAEB: Critical Demonstration Experiment

Source-backed project statement The 14 September 2023 reports say Dual Fluid is responsible for technical implementation and will build the demonstration reactor, while Rwanda provides the site and infrastructure. The February 2026 paper says Dual Fluid is responsible for design and operation and Rwanda will provide infrastructure. No separate construction firm and no executed construction contract are named. WNN: Demonstration reactor to be built in Rwanda; Globe and Mail: Rwanda signs deal with Canadian startup to build nuclear reactor; Dual Fluid: February 2026 white paper, CDE programme

Source-backed project statement The Globe and Mail reported on 14 September 2023 that Dual Fluid is paying for the project and that its finance chief was seeking to raise 70 million euros. The February 2026 paper places 15 million euros beside fabrication development and says capital acquisition for construction is being ramped up. Neither source says those amounts have been paid. Globe and Mail: Rwanda signs deal with Canadian startup to build nuclear reactor; Dual Fluid: February 2026 white paper, CDE programme

Not found in the sources we checked. The sources describe liquid metallic fuel as the concept being tested. They do not name a supplier, a fabrication contract or a delivery of fuel for the Rwanda experiment. Dual Fluid: February 2026 white paper, CDE programme; RAEB: Critical Demonstration Experiment

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Source-backed project statement World Nuclear News and The Globe and Mail reported on 14 September 2023 that the demonstration was to be operational by 2026, with testing completed by 2028. Dual Fluid's February 2026 paper places construction and completion in 2026 and the testing phase in 2028–2030, so the end of testing moved from 2028 to as late as 2030. The 2023 dates were announced by the Rwandan government and the 2026 dates are the company's own; neither is an achieved date. WNN: Demonstration reactor to be built in Rwanda; Globe and Mail: Rwanda signs deal with Canadian startup to build nuclear reactor; Dual Fluid: February 2026 white paper, CDE programme

Duke Belews Creek technology-neutral SMR proposalUnited StatesLicensing
  • Project proposerDuke Energy
  • OperatorDuke Energy
Not recorded

Source-backed project statement Duke Energy's 30 December 2025 release says that, if further evaluation confirms SMRs at Belews Creek offer the best value for customers, Duke plans to add 600 MW of advanced nuclear to its system by 2037. The intended recipient is Duke Energy's own regulated system and customers. Duke has not decided to build, and no separate buyer or agreement is named. Duke Belews Creek early site application

Not found in the sources we checked. Duke Energy's 30 December 2025 release says Duke submitted the Belews Creek early site permit application after two years of work and has not decided to build. Neither it nor the NRC's 29 September 2026 fee-cap and schedule letter names an engineering, site-study or construction contractor for the project. Duke Belews Creek early site application

Not found in the sources we checked. The NRC's 29 September 2026 letter sets a 2,178,000 dollar cap on NRC fees for reviewing the Belews Creek early site permit application. That is a regulatory fee cap, not project funding. Duke Energy's 30 December 2025 release states no funder, amount or financing for the project. NRC letter: fixed fee cap and revised schedule for the Belews Creek early site permit review (ADAMS ML26259A008)

Not found in the sources we checked. Duke Energy's 30 December 2025 release and the NRC's early site permit documents concern a technology-neutral site permit and name no reactor design, fuel supplier or fuel delivery for Belews Creek. Duke Belews Creek early site application

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Source-backed project statement The NRC's 29 September 2026 letter moved its Belews Creek early-site-permit review milestones earlier than its February 2026 schedule, for example the final safety evaluation from May 2027 to February 2027 and the final environmental impact statement from May 2027 to March 2027. These are regulator review targets, not plant milestones. Duke's 2023 plan had two SMRs at Belews Creek by 2035, while its 2025 plan gives a potential 2037 date for SMRs there or a large reactor elsewhere; that later target covers a different scope, so it is not a like-for-like revision. NRC letter: fixed fee cap and revised schedule for the Belews Creek early site permit review (ADAMS ML26259A008); Duke Energy brings large-scale new-build into resource plan - World Nuclear News

Elementl Letart Township BWRX-300 proposalUnited StatesSiting
  • Project proposerElementl Power
Not recorded

Not found in the sources we checked. Elementl's 18 June 2026 release and its Meigs County fact sheet revised 1 September 2026 name no buyer, quantity or power purchase agreement for the Letart Township plant. American Municipal Power is named as the seller of the site, and the PJM filing is an interconnection request for the first 600 MW, not a sale of power. Elementl announces Southeast Ohio BWRX-300 proposal

Source-backed project statement Elementl's 18 June 2026 release says it signed an Early Works Agreement with GE Vernova Hitachi Nuclear Energy to use the BWRX-300 for the Letart Township project. That is an explicit preparatory contract with the reactor vendor whose work scope is not described. It is not an engineering, procurement and construction award, and no construction contractor is named. Elementl announces Southeast Ohio BWRX-300 proposal

Source-backed project statement Elementl's 18 June 2026 release says that, as a private development project, Elementl plans to finance the cost of the proposed Letart Township plant and that it will not be funded through electric customer rates, and the fact sheet revised 1 September 2026 repeats that it will be privately financed. This is a stated financing plan by the developer itself, with no amount, lender, investor or financial close disclosed. Elementl announces Southeast Ohio BWRX-300 proposal; Elementl Power: Ohio Advanced Nuclear Project fact sheet

Not found in the sources we checked. Elementl's 18 June 2026 release and its fact sheet revised 1 September 2026 name the GE Vernova Hitachi BWRX-300 technology but no fuel supplier, enrichment contract, fabrication or delivery for the Letart Township units. Neither document mentions fuel. Elementl Power: Ohio Advanced Nuclear Project fact sheet

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Elementl's 18 June 2026 announcement and its fact sheet revised 1 September 2026 both say construction of the first Letart unit is expected to begin in 2030, subject to a final investment decision and regulatory approvals, with completion in 2034. The same targets restated are not a revision. Elementl announces Southeast Ohio BWRX-300 proposal; Elementl Power: Ohio Advanced Nuclear Project fact sheet

Energoatom / Holtec Rivne SMR-160 proposal (MoU-era)Earlier-plan recordUkraineAnnounced
  • Project proposerEnergoatom
Not recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.

Not found in the sources we checked. Holtec's 28 February 2018 release says Energoatom intends, as a pilot, to replace two Rivne VVER-440 units with SMR-160 reactors and that SMR-160s would likely also supply steam and power at Ukraine's industrial sites, none named. No buyer, quantity or agreement for a Rivne unit's output is stated. Holtec: Energoatom MoU to build SMR-160 plants in Ukraine

Not found in the sources we checked. Holtec's 28 February 2018 release says Holtec and Energoatom signed a memorandum envisaging Ukraine's adoption of the SMR-160, that Ukraine would become a manufacturing hub for its components, and that Holtec was in talks with unnamed Ukrainian machinery suppliers. A vendor memorandum with the proposer and unnamed supplier talks are not a contractor appointment, and no engineering or construction contractor is named for Rivne. Holtec: Energoatom MoU to build SMR-160 plants in Ukraine

Not found in the sources we checked. Holtec's 28 February 2018 release states no amount, funder or financing instrument for the Rivne SMR-160 proposal. Its mention of Holtec's chief executive serving on Ukraine's National Investment Council is a relationship statement, not funding. Holtec: Energoatom MoU to build SMR-160 plants in Ukraine

Not found in the sources we checked. Holtec's 28 February 2018 release names the SMR-160 and the Rivne pilot but no fuel supplier, enrichment, allocation or delivery. A site navigation heading about nuclear fuel is not a commitment. Holtec: Energoatom MoU to build SMR-160 plants in Ukraine

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. Holtec's 28 February 2018 release gives no construction or operation date for a Rivne SMR-160, only a national horizon for clean-power needs and a mid-2020s date for Holtec's own factory plans. There is no Rivne target to revise. Holtec: Energoatom MoU to build SMR-160 plants in Ukraine

Energoatom SMR at the Trypilska thermal plant siteUkraineAnnouncedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
  • OperatorEnergoatom
Not recorded

Not found in the sources we checked. Energoatom's 11 December 2024 statement, republished by the Kolomyia district administration, says SMRs could supplement Energoatom's own fleet and names the Trypilska thermal plant site as the first prospective location, replacing old or damaged thermal units. It names no buyer of power or heat from a Trypilska reactor. Energoatom: SMR technologies in Ukraine (Trypilska TPP site)

Not found in the sources we checked. Energoatom's 11 December 2024 statement says project documentation and calculations for the Trypilska site are being prepared, without saying who prepares them, and lists separate cooperation agreements with Holtec, EDF, Westinghouse, Rolls-Royce and NuScale that it does not assign to Trypilska. No design, vendor, engineering or construction contractor is named for the site. Energoatom: SMR technologies in Ukraine (Trypilska TPP site)

Not found in the sources we checked. Energoatom's 11 December 2024 statement says Energoatom, wholly state-owned, takes full responsibility for deploying SMR technology in Ukraine, but states no amount, budget or financing for a reactor at the Trypilska site or for the cooperation agreements it lists. Energoatom: SMR technologies in Ukraine (Trypilska TPP site)

Not found in the sources we checked. Energoatom's 11 December 2024 statement says Ukrainian law allows nuclear material only in state ownership, a general legal point, and names no fuel supplier, quantity or delivery for a Trypilska reactor. Energoatom: SMR technologies in Ukraine (Trypilska TPP site)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Energoatom's 11 December 2024 statement says SMRs could join its fleet in the next decade, a general horizon, and dates only past cooperation agreements. It gives no construction or operation date for Trypilska, so no revision is shown. Energoatom: SMR technologies in Ukraine (Trypilska TPP site)

eVinci DOME nuclear test reactorUnited StatesCanceledNot recorded

Not found in the sources we checked. DOE's 1 July 2025 release says Westinghouse would test the eVinci Nuclear Test Reactor in DOME and that the commercial eVinci design could serve remote communities, mining operations or data centers. Those are commercial-design uses. Neither that release nor American Nuclear Society's 2 October 2026 report names a recipient of power or heat from the DOME test. DOE conditional DOME selections

Not found in the sources we checked. DOE's 1 July 2025 release conditionally selected Westinghouse to test its eVinci test reactor in the DOME facility, which is operated by DOE's National Reactor Innovation Center. Westinghouse is the project's proposer and vendor, and the test-bed operator is the host. The release and American Nuclear Society's 2 October 2026 report name no separate engineering, fabrication or construction contractor for the eVinci experiment. DOE conditional DOME selections

Source-backed project statement American Nuclear Society's 2 October 2026 report says Westinghouse was among companies given front-end engineering and experiment design funding for DOME experiments in 2023 and received a second round of Department of Energy design funding in 2024, without amounts. DOE's 1 July 2025 release says the DOME testing campaigns themselves are self-funded by the applicants. Westinghouse later gave up its 2027 DOME slot, and no amount or disbursement status is stated. ANS: Deployable Energy next in line for testing in NRIC's DOME; DOE conditional DOME selections

Not found in the sources we checked. American Nuclear Society's 2 October 2026 report says DOME can test reactors using fuel enriched below 20 percent, and DOE's 1 July 2025 release lists fuel availability as a sequencing criterion. Those are facility conditions. Neither names a fuel supplier, allocation or delivery for the eVinci DOME experiment. ANS: Deployable Energy next in line for testing in NRIC's DOME; DOE conditional DOME selections

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. American Nuclear Society's 2 October 2026 report says NRIC conditionally selected the eVinci reactor in July 2025 for a DOME testing slot beginning in 2027, and that Westinghouse notified NRIC in September 2025 it would not use that slot. Giving up the slot ended this test rather than moving it to a later date, so the sources show a cancellation, not a schedule revision. ANS: Deployable Energy next in line for testing in NRIC's DOME

Fensfjorden Kjernekraft SMR proposal near Mongstad (Austrheim and Alver)NorwaySitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Not found in the sources we checked. The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft: Austrheim and Norsk Kjernekraft send nuclear assessment notification (1 Sep 2025); Fensfjorden Kjernekraft: notification with proposed assessment programme, September 2025; Norsk Kjernekraft: Taftøy assessment programme set by the government

Source-backed project statement The notification describes feasibility work involving Norsk Kjernekraft and DL Energy before Fensfjorden Kjernekraft was established. This is preparatory collaboration; the cited passage does not establish a construction or EPC award. Fensfjorden Kjernekraft: notification with proposed assessment programme, September 2025; Norsk Kjernekraft: locations (ten project companies); Norsk Kjernekraft: Fensfjorden Kjernekraft starts impact assessment (10 Apr 2026)

Not found in the sources we checked. The reviewed sources do not establish a project-specific financing commitment or amount. General company backing, ownership and policy support do not by themselves establish allocated or paid project funding. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Fensfjorden Kjernekraft: notification with proposed assessment programme, September 2025; Norsk Kjernekraft: Taftøy assessment programme set by the government

Not found in the sources we checked. The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Fensfjorden Kjernekraft: notification with proposed assessment programme, September 2025; Norsk Kjernekraft: Fensfjorden Kjernekraft starts impact assessment (10 Apr 2026)

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Damaged table text does not securely associate every year with its milestone; no target is inferred from it. Fensfjorden Kjernekraft: notification with proposed assessment programme, September 2025; Norsk Kjernekraft: Fensfjorden Kjernekraft starts impact assessment (10 Apr 2026); Norsk Kjernekraft: Taftøy assessment programme set by the government

Fermi Energia Estonian BWRX-300 plantEstoniaSitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.

Not found in the sources we checked. The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Fermi Energia national special plan; Government initiated the national designated spatial plan for a nuclear power plant; Riigiplaneering: national designated spatial plan for a nuclear power plant (page updated 9 September 2026); Fermi Energia: conditional Madala property agreement with Viru-Nigula (14 May 2026)

Source-backed project statement Fermi reported that Skepast&Puhkim and Steiger won the national planning consultancy tender to advise the ministry on site pre-selection, impact assessment and the first planning stage. This is preparatory work for the ministry, not a construction or EPC award by Fermi. Fermi Energia national special plan; Government initiated the national designated spatial plan for a nuclear power plant; Fermi Energia: Estonian firms won the nuclear planning consultancy tender (25 March 2026)

Not found in the sources we checked. The reviewed sources do not establish a project-specific financing commitment or amount. General company backing, ownership and policy support do not by themselves establish allocated or paid project funding. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Fermi Energia national special plan; Fermi Energia: conditional Madala property agreement with Viru-Nigula (14 May 2026); Government initiated the national designated spatial plan for a nuclear power plant

Not found in the sources we checked. The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Fermi Energia national special plan

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Government initiated the national designated spatial plan for a nuclear power plant; Fermi Energia national special plan; Riigiplaneering: national designated spatial plan for a nuclear power plant (page updated 9 September 2026); Elektriala: state ready with baseline positions for the nuclear plant plan

First American Nuclear EAGL-1 energy park in Indiana (site not disclosed)United StatesAnnouncedNot recorded

Not found in the sources we checked. First American Nuclear's 4 November 2025 announcement with the State of Indiana describes an EAGL-1 energy park but names no buyer of its power, and the company FAQ says a first project will be announced only when customer, site, commercial and disclosure requirements permit. ANS reported on 10 November 2025 that no details on locations or the partnership had been given. First American Nuclear FAQ; ANS: Indiana partners with First American Nuclear

Not found in the sources we checked. First American Nuclear's 4 November 2025 announcement and its FAQ name no engineering or construction contractor for the Indiana energy park. The FAQ says each project's scope would be delivered with unnamed qualified partners, and ANS lists a May 2026 company-level alliance with AtkinsRéalis only as a related headline, not tied to Indiana in the text read. First American Nuclear FAQ; ANS: Indiana partners with First American Nuclear

Not found in the sources we checked. First American Nuclear's FAQ says it can work with financing and development partners to structure capital project by project, and ANS reported on 10 November 2025 that no costs had been given. No funder, amount or financing is stated for the Indiana energy park. First American Nuclear FAQ; ANS: Indiana partners with First American Nuclear

Not found in the sources we checked. First American Nuclear's FAQ says EAGL-1's initial configuration is being developed around HALEU uranium-oxide fuel, with HALEU supply and fabrication still open workstreams, and the November 2025 announcement describes on-site reprocessing as the park's aim. These are design and fuel-cycle intentions. No fuel supplier, fabrication contract or delivery for the Indiana park is named. First American Nuclear FAQ; First American Nuclear announces Indiana EAGL-1 energy park plan

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. First American Nuclear's 4 November 2025 announcement and FAQ give no construction or operation date for the Indiana energy park, and ANS reported on 10 November 2025 that no timelines had been provided. With no dated target, no revision is shown. ANS: Indiana partners with First American Nuclear

First ELENA-AM thermoelectric heating pilot proposalRussiaAnnouncedNot recorded

Not found in the sources we checked. Rosatom's September 2023 newsletter article says ELENA-AM is designed as a heat source for remote regions without heat networks and that its electricity is expected to cover plant needs and nearby consumers. These are intended uses. No host community, buyer or supply agreement is named for the pilot. Rosatom: The Return of Elena

Not found in the sources we checked. Rosatom's September 2023 newsletter article says the ELENA-AM pilot is being developed by the Kurchatov Institute on commission from Rosatom, with reactor and critical-equipment design due by the end of 2024. The Kurchatov Institute is the design developer already recorded, so this is not a separate contractor appointment. No engineering or construction contractor for a pilot plant is named. Rosatom: The Return of Elena

Not found in the sources we checked. Rosatom's September 2023 newsletter article says Rosatom commissioned the Kurchatov Institute to develop ELENA-AM but states no amount or funding instrument, and Rosatom's 2024 program account lists ELENA-AM among targets for 2035 without a budget. No funding for a pilot plant is stated. Rosatom: The Return of Elena

Not found in the sources we checked. Rosatom's September 2023 newsletter article says the ELENA-AM core would hold 241 assemblies with fuel enriched to no more than 19.5 percent. That is a design description. No fuel fabricator, quantity or delivery is named for a pilot plant. Rosatom: The Return of Elena

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Rosatom's September 2023 newsletter article set the end of 2024 for completing the ELENA-AM reactor and critical-equipment design, and Rosatom's 2024 program account lists ELENA-AM among small-power projects targeted for 2035. These are different milestones, a design deliverable and a deployment target, each stated once, so they are not a revision. Rosatom: The Return of Elena; Rosatom scientific programme: Fourth Congress of Young Scientists

Floating nuclear power unit for Gazprom's Kirinskoye fields, SakhalinRussiaAnnounced
  • Project proposerRosatom
  • OperatorGazprom
  • Vendor for the linked designRosatom
  • Prospective customer / offtaker (binding offtake not established)Gazprom

Source-backed project statement Kommersant reported on 2 October 2023 that Gazprom confirmed it is considering floating nuclear units for external power supply to objects of its Sakhalin gas-production center. The article says the Kirinskoye and Yuzhno-Kirinskoye fields would need 45 megawatts by 2042, with the remaining output going to Sakhalin consumers, and that Rosatom did not answer. This is a confirmed discussion, not a supply contract. Kommersant: Gazprom confirms it is considering floating nuclear units

Not found in the sources we checked. Kommersant reported on 2 October 2023 that, according to Sakhalin's 2023-2027 electricity plan, Rosatom may build RITM-200S floating units for Gazprom's Kirinskoye and Yuzhno-Kirinskoye fields, and that Gazprom was considering the option. That describes Rosatom's possible role as supplier, which the record already holds, not an appointed construction contractor. No contract or named builder is reported. Kommersant: Gazprom confirms it is considering floating nuclear units

Not found in the sources we checked. Kommersant's 2 October 2023 article quotes analysts estimating that one floating unit could cost 45 to 50 billion rubles. That is an outside cost estimate, not financing, and the article names no funder, allocation or investment decision for a Kirinskoye unit. A 190.2 billion ruble figure in the same article is for the separate Baimskaya floating units. Kommersant: Gazprom confirms it is considering floating nuclear units

Not found in the sources we checked. Kommersant's 2 October 2023 article mentions reactor refuelling outages only as a reason for reserve capacity. It names no fuel supplier, quantity or delivery for a Kirinskoye floating unit. Kommersant: Gazprom confirms it is considering floating nuclear units

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. Kommersant's 2 October 2023 article gives a field power-demand estimate of 45 MW by 2042 and production dates for the Yuzhno-Kirinskoye gas field, which it says had slipped several times. Those dates concern gas production, not the floating unit. The article and the April 2023 Sakhalin decree card give no construction or operation date for the floating unit. Kommersant: Gazprom confirms it is considering floating nuclear units; Sakhalin Oblast Governor's Decree No. 19: electricity scheme and programme 2023-2027

Formosa commercial CAREM proposal (2010 agreement)Earlier-plan recordArgentinaSitingNot recordedNot recorded

Not found in the sources we checked. CNEA's 2015-2025 strategic plan says a 2010 framework agreement with Formosa province promotes construction of a CAREM power plant of about 120 MWe there. The province is the agreement counterparty and host. The plan names no buyer of the plant's electricity. CNEA Strategic Plan 2015–2025: commercial CAREM in Formosa

Not found in the sources we checked. CNEA's 2015-2025 strategic plan says CNEA itself carried out the macro-siting study for the Formosa CAREM plant, completed in the first half of 2013, and that micro-siting was in its final stage, under a 2010 framework agreement with the province. No engineering, siting or construction contractor is named. CNEA Strategic Plan 2015–2025: commercial CAREM in Formosa

Not found in the sources we checked. CNEA's 2015-2025 strategic plan describes the 2010 Formosa framework agreement, siting studies and engineering of 100/150 MWe CAREM modules whose installation in Formosa was being evaluated, but states no budget, funder or financing for a Formosa plant. CNEA Strategic Plan 2015–2025: commercial CAREM in Formosa

Not found in the sources we checked. CNEA's 2015-2025 strategic plan says Dioxitek's new uranium dioxide plant under construction in Formosa would supply current and future Argentine nuclear plants. That is national fuel-cycle capacity in the same province, not a fuel commitment for the CAREM plant, and no fuel supplier is named for it. CNEA Strategic Plan 2015–2025: commercial CAREM in Formosa

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. CNEA's 2015-2025 strategic plan dates the Formosa framework agreement to May 2010 and the macro-siting study to the first half of 2013, but gives no construction or operation date for a Formosa CAREM plant. With no dated target there is nothing to revise. CNEA Strategic Plan 2015–2025: commercial CAREM in Formosa

GE Hitachi PRISM plutonium-reuse proposal at Sellafield (not taken forward)United KingdomCanceledNot recorded

Not found in the sources we checked. World Nuclear News of 1 December 2011 and GE Hitachi's 4 April 2012 release describe a PRISM plant to disposition UK plutonium while generating electricity, but name no buyer of that electricity. The overseas customers mentioned own part of the plutonium stockpile, not offtake, and the UK chose immobilisation instead in January 2025. WNN: Prism proposed for UK plutonium disposal

Source-backed project statement GE Hitachi's 4 April 2012 release says it signed a memorandum of understanding with the National Nuclear Laboratory, under which the laboratory would provide expert technical input to a potential UK PRISM deployment to disposition plutonium. That was preparatory technical support, not a construction contract or license, and the UK's January 2025 choice of immobilisation meant the proposal was not taken forward. GE Hitachi and National Nuclear Laboratory MOU on the UK plutonium stockpile; WNN: UK opts for disposal of plutonium inventory

Not found in the sources we checked. World Nuclear News of 1 December 2011 says GE Hitachi expected the plant to cost about as much as a large conventional reactor, and its 4 April 2012 release calls it a multibillion-pound investment, but neither names a funder or amount. The investment in the 2025 notices is for the separate immobilisation plant. WNN: Prism proposed for UK plutonium disposal; GE Hitachi and National Nuclear Laboratory MOU on the UK plutonium stockpile

Not found in the sources we checked. World Nuclear News of 1 December 2011 says the proposed PRISM units would irradiate fuel made from Sellafield's stored plutonium mixed with depleted uranium, and GE Hitachi's 2012 release says PRISM would use practically all of it. No fabrication contract or allocation was made, and on 24 January 2025 the government chose to immobilise the stockpile, so that fuel route was not taken forward. WNN: Prism proposed for UK plutonium disposal; GE Hitachi and National Nuclear Laboratory MOU on the UK plutonium stockpile; WNN: UK opts for disposal of plutonium inventory

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. World Nuclear News of 1 December 2011 gives durations, irradiating the stockpile within five years and up to 60 years of operation, and GE Hitachi's 2012 release gives no construction date. The 24 January 2025 notices select immobilisation. No dated PRISM construction or operation target exists in these sources, so no revision is shown. WNN: Prism proposed for UK plutonium disposal; WNN: UK opts for disposal of plutonium inventory; NDA group welcomes Government decision on plutonium disposition

General Atomics GA-TES at Fort Hood (Army Janus)United StatesAnnounced
  • Vendor for the linked designGeneral Atomics

Source-backed project statement The Fort Hood Sentinel reported on 15 October 2026 that the planned GA-TES microreactor would deliver reliable power to Fort Hood as a base-load source, about 5 percent of the installation's demand, and that staff met utility privatization partners about possible grid connections. The installation, which is also the host, is the stated user of the power. No power purchase agreement or other buyer is named. Fort Hood Sentinel: community partners discuss future nuclear microreactor project plans

Not found in the sources we checked. General Atomics' 26 August 2026 release says GA-TES will advance at Fort Hood through development, testing and site-planning milestones under an Army Other Transaction Authority agreement, and the Fort Hood Sentinel's 15 October 2026 report says construction is still ahead. General Atomics Electromagnetic Systems is the project's own developer and intended operator. Neither source names an engineering or construction contractor. General Atomics microreactor selected for US Army Janus Program; Fort Hood Sentinel: community partners discuss future nuclear microreactor project plans

Source-backed project statement General Atomics' 26 August 2026 release says it will carry out its Fort Hood Janus effort through an Other Transaction Authority agreement with milestone-based funding tied to technical goals, and states no amount. The Army's program-wide figure of about $2.2 billion for all vendors is not split by installation. This is conditional Army funding with no reported payment. General Atomics microreactor selected for US Army Janus Program

Not found in the sources we checked. General Atomics' 26 August 2026 release describes uranium-zirconium hydride fuel as part of GA-TES's design heritage from TRIGA reactors. That is a design description. Neither the release nor the Fort Hood Sentinel's 15 October 2026 report names a fuel fabricator, quantity or delivery for the Fort Hood reactor. General Atomics microreactor selected for US Army Janus Program

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. General Atomics' 26 August 2026 release and the Fort Hood Sentinel's 15 October 2026 report give no construction or operation date for the Fort Hood reactor. The Army's September 2028 target is for a first reactor on any installation. With no dated Fort Hood target, there is no revision. General Atomics microreactor selected for US Army Janus Program

Global First Power Chalk River MMR (paused)CanadaSuspendedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Not found in the sources we checked. The page identifies the Chalk River Laboratories site as the proposed location. A site name is not a customer. No buyer, quantity, or power agreement is stated. CNSC Global First Power project status

Not found in the sources we checked. The page says Global First Power was seeking a license to prepare a site. A site-preparation application is not a construction license or an EPC award, and the page does not say it was granted. No engineering firm is named. Ultra Safe Nuclear Corporation is described as the parent, not a construction contractor. CNSC Global First Power project status

Not found in the sources we checked. The page links to participant funding for review of a draft environmental impact statement and states no amount, recipient award, or disbursement in the text read. The October 2024 Chapter 11 filing is the parent's court proceeding, not a project allocation. No capital figure is disclosed. CNSC Global First Power project status

Not found in the sources we checked. The facility table states the reactor type and an upper bound of 45 megawatts thermal. The page does not name a fuel supplier, enrichment, or delivery for this project. CNSC Global First Power project status

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. August 2024 is the pause date. The 15 January 2026 modification date confirms the same paused status. It does not replace a construction or operation date. There are not two dated statements of the same milestone. The older 15 megawatt-thermal and 5 megawatt-electric description remains a different configuration, as the summary already says. CNSC Global First Power project status

Grenland Kjernekraft SMR proposal at Herre, BambleNorwaySitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Not found in the sources we checked. The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft: Grenland assessment proposal sent to the Energy Ministry (27 Aug 2025); Grenland Kjernekraft: notification and proposed assessment programme (PDF); Norsk Kjernekraft: locations (ten project companies); Norsk Kjernekraft: Taftøy assessment programme set by the government

Not found in the sources we checked. The reviewed sources do not establish an additional project-specific engineering, preparatory-work or construction assignment. A supplier’s general capabilities or an industry-wide agreement do not establish a contract for this site. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft: Grenland Kjernekraft starts assessment work (24 Apr 2026); Norsk Kjernekraft: Grenland assessment proposal sent to the Energy Ministry (27 Aug 2025)

Not found in the sources we checked. The reviewed sources do not establish a project-specific financing commitment or amount. General company backing, ownership and policy support do not by themselves establish allocated or paid project funding. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft: Grenland assessment proposal sent to the Energy Ministry (27 Aug 2025); Norsk Kjernekraft: Grenland Kjernekraft starts assessment work (24 Apr 2026); Grenland Kjernekraft: notification and proposed assessment programme (PDF); Norsk Kjernekraft: Taftøy assessment programme set by the government

Not found in the sources we checked. The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Grenland Kjernekraft: notification and proposed assessment programme (PDF)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Damaged table text does not securely associate every year with its milestone; no target is inferred from it. Grenland Kjernekraft: notification and proposed assessment programme (PDF); Norsk Kjernekraft: Grenland Kjernekraft starts assessment work (24 Apr 2026); Norsk Kjernekraft: Taftøy assessment programme set by the government; Norsk Kjernekraft: locations (ten project companies)

GS Energy NuScale SMR proposal at Uljin nuclear hydrogen complexSouth KoreaAnnouncedNot recordedNot recordedNot recorded

Not found in the sources we checked. GS Energy's green-power page says it is pursuing SMR construction within the Uljin Nuclear Hydrogen National Industrial Complex and lists hydrogen production, district heating and industrial heat as SMR uses in general. It names no buyer or agreement for power, heat or hydrogen from a Uljin SMR. GS Energy green power portfolio: Uljin SMR proposal

Not found in the sources we checked. GS Energy's green-power page says it signed a memorandum with Uljin county in May 2023 to assess the feasibility of NuScale SMRs in the Uljin complex, and a separate April 2022 memorandum with NuScale, Doosan Enerbility and Samsung C&T for SMR projects worldwide. The county is the host and the 2022 memorandum is not specific to Uljin, so neither is a contractor appointment for this project. GS Energy green power portfolio: Uljin SMR proposal

Not found in the sources we checked. GS Energy's green-power page says GS Energy invested in NuScale Power in June 2021 to secure exclusive business rights in Korea. That is a corporate investment in the vendor, not funding for the Uljin project, and the page states no project funder or amount. GS Energy green power portfolio: Uljin SMR proposal

Not found in the sources we checked. GS Energy's green-power page illustrates a generic 77 MW NuScale module and names no fuel supplier, quantity or delivery for a Uljin SMR. GS Energy green power portfolio: Uljin SMR proposal

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. GS Energy's green-power page dates its Uljin feasibility memorandum to May 2023 but gives no construction or operation date for a Uljin SMR. With no dated target there is nothing to revise. GS Energy green power portfolio: Uljin SMR proposal

Halden Kjernekraft SMR proposal at FemsjøenNorwaySitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Not found in the sources we checked. The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Halden Kjernekraft: melding med forslag til utredningsprogram; Halden Kjernekraft news (melding til Energidepartementet); Norsk Kjernekraft: locations (ten project companies); Norsk Kjernekraft: Taftøy assessment programme set by the government

Source-backed project statement Halden Kjernekraft reported on 15 August 2024 that it selected Multiconsult and Jacobs for supplier-industry mapping and preparation of an impact-assessment plan and other study milestones. Its June 2025 notification also identifies a commissioned Menon Economics impact analysis. These are preparatory assignments, not construction or EPC awards. Halden Kjernekraft: Multiconsult and Jacobs to assess the Norwegian nuclear supplier industry; Halden Kjernekraft: melding med forslag til utredningsprogram

Not found in the sources we checked. The reviewed sources do not establish a project-specific financing commitment or amount. General company backing, ownership and policy support do not by themselves establish allocated or paid project funding. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Halden Kjernekraft: melding med forslag til utredningsprogram; Norsk Kjernekraft: Taftøy assessment programme set by the government

Not found in the sources we checked. The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Halden Kjernekraft: melding med forslag til utredningsprogram

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Halden Kjernekraft: melding med forslag til utredningsprogram; Halden Kjernekraft news (melding til Energidepartementet); Norsk Kjernekraft: Taftøy assessment programme set by the government

HAPPY200 nuclear heating project at Baishan, JilinChinaAnnounced
  • Project proposerSPIC
  • OperatorSPIC

Not found in the sources we checked. Nuclear Engineering International's 14 March 2019 report says SPIC signed a cooperation agreement with the Baishan municipal government for the heating demonstration, and China Energy News on 9 December 2019 says the project could meet Baishan city's winter heating demand. The city is the host and cooperation partner, and neither article names a heat utility, network operator or other buyer for the heat. Nuclear Engineering International: China signs agreement for the Baishan nuclear heating demonstration; 中国能源报: 东北两核能供热项目加快推进

Source-backed project statement China Energy News reported on 9 December 2019 that State Nuclear Power Technology (国家核电) and the Shanghai Nuclear Engineering Research and Design Institute had signed, with SPIC's Jilin nuclear company and its Heilongjiang branch, a general-contracting framework agreement for the Jilin Baishan nuclear heating project and a separate one for Jiamusi. A framework agreement is preparatory. It is not an engineering, procurement and construction contract or a construction approval, and the article does not isolate which contractor signed the Baishan agreement. 中国能源报: 东北两核能供热项目加快推进

Not found in the sources we checked. China Energy News' 9 December 2019 article on the Baishan general-contracting framework and Nuclear Engineering International's 14 March 2019 report on the SPIC-Baishan cooperation agreement state no investment amount, funder or financing instrument for the Baishan heating project. 中国能源报: 东北两核能供热项目加快推进

Not found in the sources we checked. China Energy News' 9 December 2019 article says the Baishan project will use SPIC's HAPPY200 heating reactor in a two-reactor layout and describes its low-pressure passive design. That is a design description. The article and Nuclear Engineering International's 14 March 2019 report name no fuel fabricator, quantity or delivery for Baishan. 中国能源报: 东北两核能供热项目加快推进

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. China Energy News on 9 December 2019 says the Baishan site-survey report passed review in September 2018 and the preliminary feasibility study passed review in April 2019. Nuclear Engineering International's 14 March 2019 report gives a 2022 first-commissioning estimate in a paragraph about the HAPPY200 design generally, without naming Baishan. These are different milestones and scopes, not two dates for the same Baishan milestone. 中国能源报: 东北两核能供热项目加快推进; Nuclear Engineering International: China signs agreement for the Baishan nuclear heating demonstration

Helen nuclear energy program plant in HelsinkiFinlandSiting
  • Project proposerHelen
  • OperatorHelen
Not recorded

Source-backed project statement World Nuclear News of 9 September 2024 says Helen's program aims to build a small nuclear plant producing heat for Helsinki, and the City of Helsinki's 6 November 2025 release says the options are heat-only or combined heat and power plants inside the district-heating network area. The heat would serve Helen's own Helsinki district-heating system. No external buyer, quantity or electricity offtake is named, and the plant type is not yet chosen. WNN: Finnish energy firm Helen launches nuclear programme; Helen: three alternative plant sites studied in Helsinki

Source-backed project statement World Nuclear News reported on 9 September 2024 that Helen signed a letter of intent with Steady Energy in October 2023, valid until 2027, covering work towards a siting license and technology permit and fixing a contract price for a district-heating plant, and allowing Helen to procure up to ten 50 MW units. The same article says Helen will still evaluate plant suppliers, so this is a preparatory agreement, not a supplier selection or construction contract. Helen has since set up Helen ydinvoima Oy as its license-holder company. WNN: Finnish energy firm Helen launches nuclear programme; Keskustelumuistio Helenin pienydinvoimalahankkeen asukastilaisuudesta Vuosaaressa 25.3.2026

Not found in the sources we checked. The 9 September 2024 World Nuclear News article, the 6 November 2025 City of Helsinki release and Helen's 25 March 2026 Vuosaari meeting memo name no funder, amount or financing for the Helsinki plant. The memo describes the price tag only as a few billion, a cost scale rather than funding, and the article says Helen would negotiate with unnamed potential partner shareholders. Keskustelumuistio Helenin pienydinvoimalahankkeen asukastilaisuudesta Vuosaaressa 25.3.2026; WNN: Finnish energy firm Helen launches nuclear programme

Not found in the sources we checked. Helen's 25 March 2026 Vuosaari meeting memo says a nuclear plant would be refuelled only about once a year, and World Nuclear News of 9 September 2024 describes the LDR-50 design. Neither names a fuel supplier, fabrication or delivery for the Helsinki plant, whose technology is not yet chosen. Keskustelumuistio Helenin pienydinvoimalahankkeen asukastilaisuudesta Vuosaaressa 25.3.2026; WNN: Finnish energy firm Helen launches nuclear programme

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. World Nuclear News of 9 September 2024 says the program's first phase was due to finish in 2026 and quotes Helen's chief executive aiming for the first SMR to provide heat no later than the early 2030s if everything falls into place. The 6 November 2025 release and the 25 March 2026 memo do not restate either date. Each target is stated once, so no revision is shown. Helen's November 2026 project description gives a goal of starting production during the 2030s, against the chief executive's 2024 aim of heat no later than the early 2030s. Helen does not describe this as a delay. WNN: Finnish energy firm Helen launches nuclear programme; Helen: three alternative plant sites studied in Helsinki; Keskustelumuistio Helenin pienydinvoimalahankkeen asukastilaisuudesta Vuosaaressa 25.3.2026; Helen Nuclear Ltd: description of the nuclear energy project (EIA)

Hexana first SMR in the Gard rhodanien areaFranceAnnouncedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded
  • Vendor for the linked designHEXANA

Not found in the sources we checked. Sfen's 14 April 2026 article says the Bagnols-sur-Cèze area hosts several energy-intensive, heat-consuming industries that represent potential customers for Hexana, and that the reactor could be coupled to the grid and to hydrogen production. Those are unnamed classes of possible users. The article and the ASNR SMR project page name no buyer or agreement for the Gard unit. Sfen RGN: Otrera and Hexana settle in historic French nuclear territories

Not found in the sources we checked. Sfen's 14 April 2026 article says Hexana launched siting studies for its first SMR in the Gard rhodanien agglomeration and that local actors help with its siting strategy, and it mentions CEA Marcoule, Cyclium and Le Collectif as the local nuclear ecosystem. It assigns none of them a study, engineering or construction contract. ASNR's SMR page records Hexana's 30 September 2026 request for an opinion on a safety option, which is a regulatory step. Sfen RGN: Otrera and Hexana settle in historic French nuclear territories; ASNR, PRM projects and their fuel-fabrication plants

Not found in the sources we checked. Sfen's 14 April 2026 article quotes Hexana's president saying that, after winning a France 2030 call, Hexana is pursuing its commercial development mainly through private financing. That describes company financing, not money committed to the Gard unit, and no amount or funder is given. The 50 million euro figure in the same article is Otrera's factory estimate. Sfen RGN: Otrera and Hexana settle in historic French nuclear territories

Not found in the sources we checked. Sfen's 14 April 2026 article says Hexana will contribute to the fuel-cycle-closure program announced in March 2026 and places it in France's sodium fast-reactor framework. That is a program and technology description. The article and the ASNR SMR page name no fuel supplier, quantity or delivery for the Gard unit. Sfen RGN: Otrera and Hexana settle in historic French nuclear territories

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Sfen's 14 April 2026 article says Hexana plans to start building its first unit in 2031 for operation from 2035, with industrialisation beginning in the second half of 2026. Each target is stated once. ASNR's page records a 30 September 2026 request for an opinion on a safety option, which is a regulatory step, not a new date for those milestones. Sfen RGN: Otrera and Hexana settle in historic French nuclear territories; ASNR, PRM projects and their fuel-fabrication plants

Holtec / EDF SMR-300 proposal at CottamUnited KingdomAnnounced
  • Project proposerHoltec International
  • Project proposerEDF
Not recorded

Not found in the sources we checked. The UK government's 4 February 2026 notice and World Nuclear News of 24 June 2026 say the Cottam reactors would power new data centers on the site, but neither names a data-center operator, buyer, quantity or power purchase agreement. The 1 GW figure is the data-center project's target, and Tritax is described as a real-estate partner, not a buyer. WNN: Holtec and EDF submit UK SMR project proposal; Government to unlock advanced nuclear to grow economy

Not found in the sources we checked. World Nuclear News of 24 June 2026 and the UK government's 4 February 2026 notice name no engineering or construction contractor for Cottam. The report says the two proposers, Holtec and EDF, submitted a joint proposal for up to four SMR-300 units and signed heads of terms to form a joint venture, and Tritax is named as a real-estate partner. The SMR-300's completed Generic Design Assessment step 2 is not a site license. WNN: Holtec and EDF submit UK SMR project proposal

Not found in the sources we checked. World Nuclear News of 24 June 2026 says the Cottam project would enable foreign direct investment, including in Framatome fuel fabrication and Arabelle Solutions turbine manufacture, but states no amount, investor commitment or award for Cottam. The UK government's 4 February 2026 notice states no Cottam sum. WNN: Holtec and EDF submit UK SMR project proposal; Government to unlock advanced nuclear to grow economy

Not found in the sources we checked. World Nuclear News of 24 June 2026 names Framatome fuel fabrication and services only as investment the Cottam project would enable. It does not describe a supply, fabrication or delivery contract for the Cottam units, and the UK government's 4 February 2026 notice names no fuel supplier. WNN: Holtec and EDF submit UK SMR project proposal; Government to unlock advanced nuclear to grow economy

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. World Nuclear News of 24 June 2026 gives one target, the SMR element becoming operational in the 2030s, alongside an end-of-decade target for the separate 1 GW data-center project. The UK government's 4 February 2026 notice gives no date. No source read restates the Cottam operation target, so no revision is shown. WNN: Holtec and EDF submit UK SMR project proposal; Government to unlock advanced nuclear to grow economy

Holtec Green River / Blue Castle, Utah proposalUnited StatesAnnouncedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Not found in the sources we checked. Both opened pages quote Blue Castle on potential on-site, behind-the-meter opportunities for advanced technology applications and on serving energy demand across Utah and the surrounding region. Neither page names a customer, a quantity, or an agreement. Jobs and local economic impact are not an offtake. Holtec Green River / Blue Castle partnership

Source-backed project statement The 28 May 2026 post says Fulcrum Point is stepping in as a development partner for licensing, deployment planning, and eventual construction, and that Hyundai E&C will join after key development milestones and funding arrangements. This does not establish an EPC award, a notice to proceed or Hyundai's appointment as the current construction contractor. Holtec Green River / Blue Castle partnership

Not found in the sources we checked. The checked Holtec release makes later Hyundai participation conditional on project milestones and funding arrangements. It does not identify a completed financing arrangement, a named project funder or an amount. Holtec Green River / Blue Castle partnership

Not found in the sources we checked. The post says Holtec will supply the SMR-300 plant under an exclusive arrangement. That is a plant-supply arrangement, not a fuel contract. The page navigation lists Holtec fuel-storage products and is not a commitment to fuel these units. Neither opened page names a fuel supplier or a delivery. Holtec Green River / Blue Castle partnership

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. ANS says the project is in a preliminary phase and that timeline details will follow. That is one undated statement, not a revision. ANS also says an earlier combined-license target, later switched to an early site permit, moved several times for the former two-AP1000 plan. That is a different reactor and a different application, so it is not an SMR-300 milestone revision. ANS: Blue Castle project to be revived as SMR facility

Holtec Oyster Creek SMR proposalUnited StatesAnnouncedNot recorded

Not found in the sources we checked. Holtec's 30 July 2026 post says the planned four SMR-300 units at Oyster Creek may bring benefits including the potential integration of AI data centers. It names no data-center operator, utility or other buyer, and no power purchase agreement. Holtec Oyster Creek proposal

Not found in the sources we checked. Holtec's 30 July 2026 post says Holtec has focused on development activities at Oyster Creek and that the site is planned to feature four SMR-300 units. It names no engineering or construction contractor. The NRC approval it reports is the old station's license termination plan, not an SMR permit. Holtec Oyster Creek proposal

Not found in the sources we checked. Holtec's 30 July 2026 post describes expected jobs, tax revenue and infrastructure investment from the planned Oyster Creek units but states no amount, funder or financing instrument for them. Holtec Oyster Creek proposal

Not found in the sources we checked. Holtec's 30 July 2026 post on the planned Oyster Creek SMR-300 units names no fuel supplier, fuel contract or delivery for them. Holtec Oyster Creek proposal

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. Holtec's 30 July 2026 post gives no construction or operation date for the Oyster Creek SMR-300 units, and its date refers to the old station's license termination plan approval. With no dated target, there is nothing to revise. Holtec Oyster Creek proposal

Holtec Pioneer Units 1 and 2 (SMR-300 at Palisades)United StatesLicensing

Source-backed project statement Holtec states that the power purchase agreements for the Palisades restart contain an option for Wolverine and Hoosier to buy power from additional SMR units at the site; no agreement to buy Pioneer 1 and 2 output is recorded. Holtec's release of 12 September 2023 says its power purchase agreement with Wolverine Power Cooperative (Hoosier Energy to purchase the balance of Palisades output) "also contains a contract expansion provision to include up to two small modular reactors (SMRs rated at 300 MWe each)" that Holtec intends to build and commission at the site. The applicant's December 2025 Environmental Report restates this as an option for Wolverine and Hoosier to purchase power from the additional SMRs, citing that 2023 release, describes Palisades SMR as a merchant generator, and says Holtec anticipates that Wolverine and/or Hoosier would engage in good faith negotiations to establish long-term power purchase agreements for Pioneer Units 1 and 2. DOE's 2 December 2025 release describes Holtec as pursuing the role of electricity merchant selling the power to near-by utilities and end-users. These are Holtec's statements of an option and an expectation, not a signed agreement to buy Pioneer 1 and 2 power. The restart agreements' own text was not reviewed, and no executed agreement, price, volume or term for the new units, and no exercise of the option, was found in the application, the Environmental Report, Holtec's 2023 release or DOE's release. This replaces the earlier not-disclosed note, which rested on the general and financial volume alone. Holtec and Wolverine Ink Historic Power Purchase Agreement for the Palisades Power Plant (12 Sep 2023); Pioneer Units 1 and 2 application, Enclosure III, Environmental Report (ML25365A988); DOE selects TVA and Holtec to advance deployment of US SMRs (2 Dec 2025)

Source-backed project statement SMR, LLC's December 2025 construction-permit filing says Holtec has teamed with Hyundai Engineering & Construction to support site-specific engineering and balance-of-plant design and to serve, through Hyundai America, as general construction contractor for Pioneer 1 and 2; the Environmental Report adds that Hyundai Engineering & Construction "has been selected as the engineering and construction partner". DOE's December 2025 release describes Holtec as constructor "in partnership with Hyundai Engineering & Construction", and ANS (2 April 2026) reports the units are planned "in collaboration with" Hyundai Engineering & Construction and Mitsubishi Electric. The 30 September 2026 Part 2 transmittal says the Part 1 general and financial information is incorporated by reference. This is a planned appointment: no executed construction contract was found, and no construction permit or limited work authorization has been issued. The filing also names Framatome for fuel design and supply and Mitsubishi Electric for instrumentation and control platform integration as supply-chain vendors, and cites Sargent & Lundy analysis for transmission cost estimates. Pioneer Units 1 and 2 application, General and Financial Information (ML25365A986); Pioneer Units 1 and 2 application, Enclosure III, Environmental Report (ML25365A988); DOE selects TVA and Holtec to advance deployment of US SMRs (2 Dec 2025); Holtec hits milestones in Palisades restart, new reactor projects -- ANS / Nuclear Newswire; Holtec transmittal 300-USNRC-26018 of Part 2 of the Pioneer construction permit application (ML26273A417)

Source-backed project statement DOE announced on 2 December 2025 that it selected Holtec Government Services, LLC for up to $400 million of cost-shared funding (Holtec: 'valued at $400 million') for the two SMR-300 units; Holtec describes it as milestone-based support intended to advance licensing, pre-construction and supply-chain mobilization. The December 2025 permit application says the award is subject to finalization of the award agreement and is expected to reflect 50/50 cost sharing, with Holtec funding the $400 million private portion, and that Palisades SMR plans to finance up to 80 percent of construction through a loan, with a DOE Title XVII loan guarantee as the currently expected path (the part I application is complete and part II is being prepared). ANS reported on 2 April 2026 that, according to Holtec, the grant will become effective after conditions are met, including negotiation and execution of a funding agreement. The applicant also proposed a license condition that funding documentation be available for NRC inspection before limited and full construction begin, and asked for an exemption from identifying specific funding sources at this stage. The Michigan Strategic Fund's 30 September 2025 report concerns the Palisades restart: it says the state's $300 million incentive was allocated to that project and disbursed to Holtec Palisades, LLC, and it does not mention the SMR units; state funding for Pioneer 1 and 2 was not researched. No executed DOE agreement, loan-guarantee commitment or disbursement for Pioneer 1 and 2 is established. Holtec's earlier $148 million advanced reactor award supported SMR-300 design development. DOE selects TVA and Holtec to advance deployment of US SMRs (2 Dec 2025); Pioneer Units 1 and 2 application, General and Financial Information (ML25365A986); Holtec release: Tier 1 First Mover Award from the USDOE for the dual-unit SMR-300 plant at Palisades (2 Dec 2025); Holtec hits milestones in Palisades restart, new reactor projects -- ANS / Nuclear Newswire; Pioneer Units 1 and 2 application, Enclosure V, Proposed License Conditions (ML25365A990); Michigan Strategic Fund, FY25 targeted energy investment status report (30 Sep 2025)

  • Fuel supplier named for this projectFramatome

Source-backed project statement SMR, LLC's December 2025 construction-permit filing names Framatome as the project's vendor for fuel design and supply and says fuel costs were validated through a Framatome quotation. The Environmental Report describes a reactor core of 69 Framatome-trademarked GAIA fuel assemblies and, for its transport analysis, assumes fresh fuel is shipped by truck from Framatome's Richland, Washington facility. These are a design basis, a cost quotation and an analytical assumption. No fuel supply contract signature, quantity or delivery schedule for Pioneer 1 and 2 is stated. Pioneer Units 1 and 2 application, General and Financial Information (ML25365A986); Pioneer Units 1 and 2 application, Enclosure III, Environmental Report (ML25365A988)

Comparable schedule revision not established. World Nuclear News reported on 5 December 2023 that Holtec said it would commission its first two SMR-300 units at Palisades by 2030, with the first SMR-300 plant targeted for mid-2030, subject to regulatory reviews and oversight. Holtec's own release of 2 December 2025 says its "Mission 2030" contemplates the Pioneer reactors being brought online in the first years of the 2030s, and ANS reported on 2 April 2026 that Holtec has targeted the early 2030s for commissioning the two reactors. The applicant's December 2025 Environmental Report (Table 1.4-1, "estimated dates, subject to change") gives quarter-level dates for differently named milestones: Pioneer Unit 1 full power operation in the fourth quarter of 2031 and full commercial operation in the fourth quarter of 2031 or first quarter of 2032; Pioneer Unit 2 full power operation in the second quarter of 2032 and full commercial operation in the second or third quarter of 2032. No source states that the earlier target was changed, and the 2023 report does not define "commission" or say whether "first plant" means one unit or both, so it is not equated with any table milestone or unit: this note records no same-milestone schedule revision and no delay. The 2023 figure is trade-press reporting of a company statement; Holtec's own December 2023 release was not captured. The permit filing's construction-completion target (end of 2031) is a separate milestone. These are company targets, not NRC decisions or completed milestones. Palisades SMR programme is under way: Holtec - World Nuclear News; Holtec release: Tier 1 First Mover Award from the USDOE for the dual-unit SMR-300 plant at Palisades (2 Dec 2025); Pioneer Units 1 and 2 application, Enclosure III, Environmental Report (ML25365A988); Holtec hits milestones in Palisades restart, new reactor projects -- ANS / Nuclear Newswire

Holtec SMR-160 proposal at Savannah River Site (2012)Earlier-plan recordUnited StatesAnnouncedNot recorded

Not found in the sources we checked. The Department of Energy's 2 March 2012 notice and SMR, LLC's 2012 press-release index name no buyer of power from an SMR-160 at Savannah River. A June 2012 press conference listing state officials and SCE&G and AREVA executives as speakers does not say anyone agreed to buy power, and the site itself is not stated as an offtaker. SMR, LLC (Holtec): MOA to situate first SMR-160 at Savannah River Site

Not found in the sources we checked. The Department of Energy's 2 March 2012 notice and SMR, LLC's 5 March 2012 item describe a memorandum of agreement between Holtec's SMR, LLC and the site host, DOE-Savannah River with Savannah River National Laboratory, to provide siting information and a framework for later land-use and site-services agreements. No engineering, licensing or construction contractor is named, and the item headline's 'protocol to build' is not a construction contract. DOE: Energy Department announces small modular reactor technology partnerships at Savannah River; SMR, LLC (Holtec): MOA to situate first SMR-160 at Savannah River Site

Not found in the sources we checked. SMR, LLC's 2012 press index says the company partnered with NuHub in May 2012 to compete for a DOE grant for SMR-160 deployment in South Carolina and applied to the DOE small modular reactor funding announcement, which sought to award $452 million in total to two companies. Its 21 November 2012 item says DOE made only one award at that time. No award or payment to this proposal is stated, and DOE's 2 March 2012 notice says the siting memorandums were not a federal funding commitment. SMR, LLC (Holtec): MOA to situate first SMR-160 at Savannah River Site; DOE: Energy Department announces small modular reactor technology partnerships at Savannah River

Not found in the sources we checked. SMR, LLC's 12 July 2012 item says Holtec extended the SMR-160 core's cycle between refuellings to nearly four years, which is a design change. Neither it nor the Department of Energy's 2 March 2012 notice names a fuel manufacturer, allocation or delivery for a Savannah River SMR-160. SMR, LLC (Holtec): MOA to situate first SMR-160 at Savannah River Site

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The Department of Energy's 2 March 2012 notice and SMR, LLC's 2012 press index date the siting memorandum and later grant, design and award items, but none states a construction or operation date for a Savannah River SMR-160. With no dated target, no schedule revision is shown. DOE: Energy Department announces small modular reactor technology partnerships at Savannah River; SMR, LLC (Holtec): MOA to situate first SMR-160 at Savannah River Site

Holtec SMR-300 proposal in Brigham City, UtahUnited StatesAnnouncedNot recorded

Not found in the sources we checked. The American Public Power Association's 18 November 2025 report, ANS Nuclear Newswire of 19 November 2025 and the Utah Office of Energy Development's 19 November 2025 slide name no buyer, quantity or power purchase agreement for Brigham City SMR output. Brigham City's membership of Utah Associated Municipal Power Systems is not an offtake, and the city and state appear as hosts and announcers. APPA: Utah and industry leaders announce nuclear partnership in Brigham City; Utah OED: Nuclear Consortium presentation to PUET Committee, 19 November 2025

Not found in the sources we checked. The 18 November 2025 American Public Power Association report and the Utah Office of Energy Development's 19 November 2025 slide describe a partnership between Hi Tech Solutions and Holtec to develop a manufacturing facility, a training center and eventually SMR generation in Brigham City. No engineering, licensing or construction contractor for the reactors is named. The universities ANS lists are partners in a workforce-training network, not reactor contractors. APPA: Utah and industry leaders announce nuclear partnership in Brigham City; Utah OED: Nuclear Consortium presentation to PUET Committee, 19 November 2025; ANS Nuclear Newswire: Operation Gigawatt looks to Brigham City, Holtec and Hi Tech Solutions

Source-backed project statement The Utah Office of Energy Development's 19 November 2025 slide lists an intended investment of $750 million for Hi Tech Solutions and Holtec's Brigham City plans, which cover manufacturing, training and eventual SMR generation. The American Public Power Association and ANS reports describe the sum as private investment backing Phase 1 or already raised, but no investor, instrument or disbursement is named and no amount is separated for the reactors. Utah OED: Nuclear Consortium presentation to PUET Committee, 19 November 2025; APPA: Utah and industry leaders announce nuclear partnership in Brigham City; ANS Nuclear Newswire: Operation Gigawatt looks to Brigham City, Holtec and Hi Tech Solutions

Not found in the sources we checked. The Utah Office of Energy Development's 19 November 2025 slide and the 18 and 19 November 2025 press reports name no fuel supplier, fabrication or delivery for Brigham City reactors. The slide's TRISO fuel manufacturing belongs to Valar Atomics' separate project at the Utah San Rafael Energy Lab. Utah OED: Nuclear Consortium presentation to PUET Committee, 19 November 2025

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The Utah Office of Energy Development's 19 November 2025 slide says groundbreaking on training and manufacturing facilities could start in 2027 and that SMRs are potential in the early 2030s. ANS notes a May 2025 aim for a Utah training facility by 2028 that the new announcement did not repeat. These concern training facilities and a state-wide fleet agreement, not a revised date for the Brigham City reactors. Utah OED: Nuclear Consortium presentation to PUET Committee, 19 November 2025; ANS Nuclear Newswire: Operation Gigawatt looks to Brigham City, Holtec and Hi Tech Solutions

HTGR-POLA research reactor (NCBJ)PolandAnnounced

Source-backed project statement NCBJ's 23 September 2024 page says the HTGR-POLA concept would supply industrial heat for a test chemical installation assumed in the project, and electricity and office heating for NCBJ's own Świerk campus. The stated user is therefore NCBJ itself and a project test installation. No outside buyer, contract or quantity is named. NCBJ: HTGR-POLA research reactor designed

Not found in the sources we checked. NCBJ's 23 September 2024 and 13 October 2025 pages describe NCBJ's own design work, a 2021-2024 design project agreed with the science ministry, cooperation with the Japan Atomic Energy Agency since November 2022 and technical meetings with the Polish Atomic Energy Agency concluded on 25 September 2025. They name no engineering or construction contractor for HTGR-POLA. JAEA cooperation is a research agreement, not an appointment. NCBJ: HTGR-POLA research reactor designed; NCBJ concluded technical dialogue with PAA on HTGR-POLA

Source-backed project statement NCBJ's 13 October 2025 page says the science ministry approved on 20 May 2025 the final report of the HTGR-POLA technical-description project under Agreement No. 1/HTGR/2021/14 of 12 May 2021, for PLN 60 million. NCBJ's 23 September 2024 page describes that agreement with the ministry for the 2021-2024 design project. This is government funding for design work, not construction funding, and the pages do not state how much was disbursed. NCBJ concluded technical dialogue with PAA on HTGR-POLA

Not found in the sources we checked. NCBJ's 23 September 2024 page says high-temperature reactors like HTGR-POLA use uranium dioxide enriched from a few to a dozen or so percent in TRISO fuel. That is a design description. Neither that page nor the 13 October 2025 page names a fuel manufacturer, quantity or delivery for HTGR-POLA. NCBJ: HTGR-POLA research reactor designed

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. NCBJ's 23 September 2024 page expected the basic design and preliminary safety report in autumn 2024 and gives only durations for later phases, and its 13 October 2025 page reports the design submission in December 2024 and the end of regulator meetings on 25 September 2025. These are different acts, and neither page gives a construction or operation date for HTGR-POLA that could be revised. NCBJ: HTGR-POLA research reactor designed; NCBJ concluded technical dialogue with PAA on HTGR-POLA

HTR-10 high-temperature gas-cooled test reactor, Tsinghua INETChinaOperatingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.

Source-backed project statement The NNSA's February 2014 introduction to HTR-10 says that during trial operation the reactor supplied heating to the INET site from December 2003 to April 2004 and ran heating and combined heat and power operation in later winters to 2007. The recorded recipient of its heat was INET's own site. No outside buyer of heat or electricity is named. NNSA: letter on the HTR-10 operating licence (Guohe Anhan [2014] No. 25)

Source-backed project statement IAEA-TECDOC-1382 assigns INET overall design, construction and operating responsibility for HTR-10. This supports the recorded owner-built construction role, not a separate EPC award. The document does not name the system subcontractors. IAEA-TECDOC-1382, chapter 4: HTR-10 general information

Source-backed project statement IAEA-TECDOC-1382 says HTR-10 was part of China's High Technology R&D Programme and approved by the State Council in March 1992, and that its basic design and budget estimate were approved by the State Education Commission and the State Science and Technology Commission in 1994. This shows a state-approved budget under a national program. No amount or disbursement is given. IAEA-TECDOC-1382, chapter 4: HTR-10 general information

Source-backed project statement IAEA's December 2012 report identifies INET's laboratory-scale HTR-10 fuel-production line and describes fabrication of HTR-10's first-core fuel in 2000–2001. This establishes historical first-core fabrication, not a current supply contract, later delivery or today's supplier. IAEA-TECDOC-1674: Advances in High Temperature Gas Cooled Reactor Fuel Technology

Not recorded

Source-backed project statement HTR-10's historical first-criticality expectations changed from the beginning of 1999 to the end of 2000. An INET-authored paper published in August 1996 gave the earlier target. A July 2000 paper by IAEA staff summarized INET's status with the later target. These concern the same 10 MWth test reactor; the later account is a secondary summary, not an INET-issued forecast. The papers are associated with conferences in 1995 and June 2000, but those conference dates do not establish when the quoted words were stated. This is a partial history, retaining the sources' part-of-year wording without calculating months of delay. The achieved December 2000 criticality in the record remains a separate event. IAEA-TECDOC-1382, chapter 4: HTR-10 general information; Progress of the HTR-10 project; Global trends in advanced reactor developments, and the role of the IAEA; Progress of the HTR-10 project (Conference) | ETDEWEB; Global trends in advanced reactor developments, and the role of the IAEA (Conference) | ETDEWEB

HTR-PM Shidaowan demonstrationChinaOperatingNot recorded

Not found in the sources we checked. The 20 August 2021 operating license names Huaneng Shandong Shidao Bay Nuclear Power Company as holder and operating organization of the high-temperature demonstration and names no electricity or heat buyer. The IAEA HTR-PM status report published on 11 October 2024 says this demonstration plant is currently designed for power generation. The IAEA PRIS row for Shidao Bay-1 names that company as operator and China Huaneng Group as owner, which is not an offtake. NNSA operating licence for the Shidaowan high-temperature gas-cooled demonstration (Guohe Anzheng Zi No. 2119); IAEA ARIS status report: HTR-PM (China); IAEA PRIS statistics: reactors by country code (China), captured 9 October 2026

Source-backed project statement The IAEA HTR-PM status report published on 11 October 2024 says Chinergy Company was designated the main contractor of the HTR-PM nuclear island, and that the owner company was founded in January 2007. The same report's milestone list says the owner was established in 2006 by China Huaneng Group, China Nuclear Engineering Group and Tsinghua University. The designation states no contract price and no conventional-island contractor. IAEA ARIS status report: HTR-PM (China)

Source-backed project statement The IAEA HTR-PM status report published on 11 October 2024 says a preliminary investment agreement was signed in December 2004 by China Huaneng Group, China Nuclear Engineering Corporation and Tsinghua Holding Corporation. It says the State Council approved the implementation plan and the budget for the HTR-PM project in February 2008. It also says the Chinese government will support the demonstration so the owner can maintain operation and recover the investment, and it states no amount paid. IAEA ARIS status report: HTR-PM (China)

Source-backed project statement On 16 September 2014 Tsinghua University reported that equipment installation was basically complete on the demonstration fuel-element line, that CNNC North Nuclear Fuel Element Company undertakes its construction and operation, and that the line would supply about 300,000 spherical elements a year to the Shidaowan demonstration after completion. The report says the university would provide technical services for the first core, which is not a delivery record. The 20 August 2021 operating license says first fuel loading is the start of operation and does not name a supplier. Tsinghua University News: HTR-PM fuel-element production line; NNSA operating licence for the Shidaowan high-temperature gas-cooled demonstration (Guohe Anzheng Zi No. 2119)

Not recorded

Comparable schedule revision not established. The IAEA HTR-PM status report published on 11 October 2024 says construction of the plant is scheduled to be completed by the end of 2013. The report does not pair that sentence with a second dated forecast of construction completion. IAEA PRIS records commercial operation of Shidao Bay-1 on 6 December 2023 as an achieved date, and that commercial-operation date is a different milestone. IAEA ARIS status report: HTR-PM (China); IAEA PRIS statistics: reactors by country code (China), captured 9 October 2026

HTTR test reactor with planned hydrogen coupling, OaraiJapanOperatingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.

Not found in the sources we checked. JAEA says it aims to produce hydrogen with HTTR heat by 2030 and to show that a high-temperature reactor can supply hydrogen for hard-to-abate industry. The August 2026 slides say the agency, JAEA and Mitsubishi Heavy Industries are exchanging views with steel, chemical and wholesale companies about future needs. No company is named as a buyer of HTTR hydrogen. JAEA: HTTR hydrogen production facility (press release); JAEA: HTTR hydrogen-coupling status and schedule (symposium slides, 7 August 2026)

Not found in the sources we checked. The notices say JAEA applied to connect a hydrogen facility to HTTR. They do not name a construction contractor. A statement that Mitsubishi Heavy Industries is carrying out basic design appears under the separate demonstration-reactor section of the August 2026 slides, not as an HTTR construction award. JAEA: HTTR hydrogen production facility (press release); JAEA: HTTR hydrogen-coupling status and schedule (symposium slides, 7 August 2026)

Source-backed project statement JAEA's 27 March 2025 notice says the work to install and connect a hydrogen facility to HTTR is in a project commissioned by the Agency for Natural Resources and Energy. No amount is stated, and the notice does not say construction costs have been paid. JAEA: HTTR hydrogen production facility (press release)

Source-backed project statement The 7 August 2026 slides say the second HTTR fuel charge, delivered in March 2005, was the last fuel manufactured for HTTR, and that transfer of domestic fuel-manufacturing technology to JAEA has been agreed. No current fabrication contract or new delivery is stated. JAEA: HTTR hydrogen-coupling status and schedule (symposium slides, 7 August 2026)

Comparable schedule revision not established. The September 2025 notice aims to make hydrogen with HTTR heat by 2030. The August 2026 slides say the HTTR hydrogen demonstration is planned for 2028 or later. Those statements describe the hydrogen test, not two forecasts of the reactor's operating date. A demonstration reactor aimed at the 2030s is a different plant. JAEA: amendment to HTTR licence application for hydrogen plant connection; JAEA: HTTR hydrogen-coupling status and schedule (symposium slides, 7 August 2026)

Huakun One floating reactor platform demonstration at the Taipingling siteChinaSitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.

Not found in the sources we checked. CGN Ocean Energy's November 2025 siting-stage environmental report for Huakun One, accepted by the Ministry of Ecology and Environment on 2 December 2025, says the moored reactor platform would generate electricity and send it to the local grid over 35 kV cables. It names no buyer or power purchase agreement. MEE: siting-stage environmental impact report (November 2025), Huakun One science and technology demonstration project

Source-backed project statement CGN Ocean Energy's November 2025 siting-stage environmental report for Huakun One says the owner commissioned the Pearl River Water Resources Protection Institute to study the marine environmental impact of the harbour works, the Nanjing Hydraulic Research Institute to model suspended sediment, and Suzhou Nuclear Power Research Institute to monitor baseline noise in June 2025. These are completed preparatory study contracts. The report names no construction contractor and leaves the start date open. MEE: siting-stage environmental impact report (November 2025), Huakun One science and technology demonstration project

Source-backed project statement CGN Ocean Energy's November 2025 siting-stage environmental report for Huakun One says the funds needed for the project's investment will be raised and provided by the owner, CGN Ocean Energy. No amount is stated, and the report leaves the construction start to be set later. MEE: siting-stage environmental impact report (November 2025), Huakun One science and technology demonstration project

Not found in the sources we checked. CGN Ocean Energy's November 2025 siting-stage environmental report for Huakun One says new fuel could reach the site by rail or road in licensed containers and that spent fuel would be stored long-term at the Taipingling base. It names no fuel fabricator, quantity or delivery date. MEE: siting-stage environmental impact report (November 2025), Huakun One science and technology demonstration project

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. CGN Ocean Energy's November 2025 siting-stage environmental report says the specific construction start for Huakun One will be set at an appropriate time, considering all factors, and gives no construction or operation date. With no dated target there is nothing to revise. MEE: siting-stage environmental impact report (November 2025), Huakun One science and technology demonstration project

Huaneng Xiapu 600 MW HTGR unit (site plan)ChinaAnnouncedNot recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.Not recorded

Not found in the sources we checked. Ningde's 7 June 2023 notice and China Energy News' 2017 report, republished by the China Atomic Energy Authority, name Huaneng Xiapu Nuclear Power as the company for the planned 600 MW high-temperature unit. Neither names a buyer of the unit's power or heat. Ningde notice on the Xiapu nuclear site

Not found in the sources we checked. China Energy News reported in June 2017 that Huaneng Xiapu Nuclear Power, the project company, would invest in, build and operate the 600 MW high-temperature unit, and that Tsinghua University, as the technology developer, published a 600 MW scheme in December 2016. These are the owner and design developer, not a contractor appointment. Neither that report nor Ningde's 7 June 2023 notice names an engineering or construction contractor for the unit. CAEA: Huaneng Xiapu nuclear project

Source-backed project statement China Energy News reported in June 2017, in a report republished by the China Atomic Energy Authority, that Huaneng Xiapu Nuclear Power would invest in and build the planned 600 MW high-temperature unit, and listed the joint venture's shareholders: Funeng 10 percent, Huaneng Nuclear Development 30 percent, Huaneng International Power Development 22.5 percent, Huaneng Power International 22.5 percent, CNNC's China National Nuclear Power 10 percent and Ningde state assets 5 percent. This is a planned owner investment with no amount, and no approval for the unit is reported. CAEA: Huaneng Xiapu nuclear project

Not found in the sources we checked. Ningde's 7 June 2023 notice and China Energy News' 2017 report describe the planned 600 MW high-temperature unit and Tsinghua's design scheme but name no fuel manufacturer, quantity or delivery for it. A closed-fuel-cycle sentence in the 2017 report concerns the separate fast-reactor demonstration. CAEA: Huaneng Xiapu nuclear project

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Ningde's 7 June 2023 notice says the National Energy Administration included the Xiapu site in the national plan in May 2015 for one 600 MW high-temperature unit and four large pressurised-water units, and gives later dates only for pressurised-water preparatory steps. China Energy News' 2017 report gives targets for the separate fast reactor. No construction or operation date for the high-temperature unit is stated, so there is nothing to revise. Ningde notice on the Xiapu nuclear site; CAEA: Huaneng Xiapu nuclear project

Huizhou HuaPeng-1 heating demonstration proposalChinaSitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Not found in the sources we checked. Tsinghua University Asset Management's page describes preparatory work for the HuaPeng-1 Huizhou low-temperature heating demonstration, and the Shenzhen nuclear expo's 8 January 2026 account of HuaPeng Technology's presentation says HuaPeng-1 is to be coupled with petrochemical-industry decarbonisation. Neither names a heat or steam buyer, quantity or agreement. Tsinghua University Asset Management: regional economic and social development projects; HuaPeng Technology technical manager: small reactors coupled to petrochemical decarbonisation

Not found in the sources we checked. The Shenzhen nuclear expo's 8 January 2026 account says HuaPeng Technology Energy, a wholly owned CGN subsidiary, is fully responsible for developing, building and operating CGN's onshore small reactors, and that the HuaPeng-1 reactor type was designed by Shanghai Clean Energy, a CGN-Tsinghua joint venture. That is the design organization for the reactor type, not a contract for the Huizhou demonstration. No engineering or construction contractor and no site are named. HuaPeng Technology technical manager: small reactors coupled to petrochemical decarbonisation

Not found in the sources we checked. Tsinghua University Asset Management's page and the 8 January 2026 Shenzhen nuclear expo account describe preparatory work and the reactor design but state no investment, budget or funder for the Huizhou HuaPeng-1 demonstration. Tsinghua University Asset Management: regional economic and social development projects

Not found in the sources we checked. The 8 January 2026 Shenzhen nuclear expo account describes HuaPeng-1's NHR200-II-based design features, such as natural circulation and clean-water cooling, but neither it nor Tsinghua University Asset Management's page mentions fuel supply, fabrication or delivery for the Huizhou demonstration. HuaPeng Technology technical manager: small reactors coupled to petrochemical decarbonisation

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. Tsinghua University Asset Management's undated page and the 8 January 2026 Shenzhen nuclear expo account give no construction or operation date for the Huizhou HuaPeng-1 demonstration. The 2035 date in the presentation refers to fusion demonstrations generally. No revision is shown. HuaPeng Technology technical manager: small reactors coupled to petrochemical decarbonisation

Hyperion / Gen4 Module proposal at Savannah River Site (2012)Earlier-plan recordUnited StatesAnnouncedNot recorded
  • Vendor for the linked designGen4 Energy Inc.

Not found in the sources we checked. Gen4 Energy's 5 March 2012 page and the Department of Energy's 2 March 2012 notice name no buyer of power from the first Hyperion reactor at Savannah River. The page lists classes of possible users, such as remote mines, oil and gas operations, government complexes and islands, which is design marketing, not an offtake, and the site is the deployment location rather than a stated buyer. Gen4 Energy (formerly Hyperion): plans to deploy an advanced reactor at Savannah River

Not found in the sources we checked. The Department of Energy's 2 March 2012 notice and Gen4 Energy's 5 March 2012 page describe a memorandum of agreement between Hyperion and the site host, DOE-Savannah River with Savannah River National Laboratory, setting next steps towards land-use, site-services and technical-assistance agreements and NRC licensing. No such agreement, engineering contractor or construction contractor is named. Los Alamos National Laboratory is described as Hyperion's design collaborator generally, not for this site. DOE: Energy Department announces small modular reactor technology partnerships at Savannah River; Gen4 Energy (formerly Hyperion): plans to deploy an advanced reactor at Savannah River

Not found in the sources we checked. Gen4 Energy's 5 March 2012 page describes the first Savannah River Hyperion reactor as privately funded, and the Department of Energy's 2 March 2012 notice says the siting memorandums are not a federal funding commitment. Neither names a funder, investor or amount for this reactor, and the notice's other sums concern Vogtle, AP1000 licensing and university grants. Gen4 Energy (formerly Hyperion): plans to deploy an advanced reactor at Savannah River; DOE: Energy Department announces small modular reactor technology partnerships at Savannah River

Not found in the sources we checked. Gen4 Energy's 5 March 2012 page says the Hyperion Power Module's design intent is uranium nitride fuel with a ten-year core life and no on-site refuelling. That is a design specification. Neither it nor the Department of Energy's 2 March 2012 notice names a fuel manufacturer, quantity or delivery for the Savannah River reactor. Gen4 Energy (formerly Hyperion): plans to deploy an advanced reactor at Savannah River

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The Department of Energy's 2 March 2012 notice and Gen4 Energy's 5 March 2012 page describe the same memorandum and say the parties would work towards target dates for later agreements, but print no construction or operation date. With no dated target, no schedule revision is shown. DOE: Energy Department announces small modular reactor technology partnerships at Savannah River; Gen4 Energy (formerly Hyperion): plans to deploy an advanced reactor at Savannah River

Idaho State University / NuCube Advanced Research and Test ReactorUnited StatesSiting
  • Vendor named for this project (no design profile is linked)NuCube Energy

Not found in the sources we checked. Idaho State University's project FAQ says the reactor is designed to produce heat for education, research and testing and is not intended to generate electricity for the grid, and lists research topics such as process heat and hydrogen production. The university's April and September 2026 announcements name no outside buyer of heat or power. Idaho State University: Advanced Research and Test Reactor project FAQ; ISU: site revealed for Advanced Research and Test Reactor

Not found in the sources we checked. Idaho State University's 29 April 2026 release says NuCube designed the reactor and the university requested authorization to host it, and its 16 September 2026 release says the university, in partnership with NuCube, plans to design and commission it at its Business and Research Park. These are the project's proposers. Neither release nor the FAQ names an engineering or construction contractor. ISU and NuCube selected for DOE Launch Pad; ISU: site revealed for Advanced Research and Test Reactor; Idaho State University: Advanced Research and Test Reactor project FAQ

Not found in the sources we checked. Idaho State University's 29 April 2026 release says selection for DOE's Launch Pad USA program gives the university and NuCube access to federal infrastructure, technical expertise and regulatory support. That is program participation, not money, and the release, the September 2026 release and the FAQ state no amount or funder for the reactor. ISU and NuCube selected for DOE Launch Pad

Not found in the sources we checked. Idaho State University's 29 April 2026 release and FAQ say the reactor is designed to use TRISO fuel, and the FAQ says used-fuel removal arrangements are being evaluated and not yet final. That is a design fuel and a back-end question. No fresh-fuel supplier, quantity or delivery is named. ISU and NuCube selected for DOE Launch Pad; Idaho State University: Advanced Research and Test Reactor project FAQ

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Idaho State University's FAQ says the construction schedule will depend on design, regulatory review, licensing and approvals and gives no year, and its April and September 2026 releases date only the selection and the site announcement. The record's 2029-2030 criticality target came from an East Idaho News article that could not be read here. No earlier and later dates for the same milestone were read. ISU and NuCube selected for DOE Launch Pad; ISU: site revealed for Advanced Research and Test Reactor; Idaho State University: Advanced Research and Test Reactor project FAQ; East Idaho News: site chosen for ISU's Advanced Research and Test Reactor

Jimmy Cristanol Bazancourt heat microreactor proposalFranceLicensing
  • Application filing entityJimmy
  • OperatorJimmy
  • Vendor for the linked designJimmy

Source-backed project statement On 29 April 2024 Jimmy said a thermal generator could be installed at the Cristanol site in Bazancourt and could supply 10 MW, and that the proposal is one of the options Cristal Union is studying. The nuclear safety authority's project page, updated 14 October 2026, says the Fermi reactor is intended to supply industrial heat to a Cristal Union factory. No heat-supply contract or price is stated. Jimmy deployment announcement; ASNR, PRM projects and their fuel-fabrication plants

Not found in the sources we checked. Jimmy's 29 April 2024 release says its generators are assembled at Le Creusot, which the safety authority lists as a separate fuel-assembly installation, not the Bazancourt reactor. Neither that release, the 11 October 2024 fuel release, nor the authority's Fermi entry names an engineering or construction firm for the Bazancourt installation. Jimmy deployment announcement; ASNR, PRM projects and their fuel-fabrication plants

Not found in the sources we checked. Jimmy's 29 April 2024 release says the company received a 32 million euro subsidy under France 2030. The release does not say that subsidy is money for the Bazancourt installation. The safety-authority page reviewed states no project funding. Jimmy deployment announcement; ASNR, PRM projects and their fuel-fabrication plants

  • Fuel supplier named for this projectUrenco

Source-backed project statement On 11 October 2024 Urenco said it signed a contract to supply low-enriched uranium plus, enriched up to 10 percent, for Jimmy's first high-temperature gas-cooled microreactor, with first delivery to be made in 2026 from Eunice, New Mexico. The same release ties Jimmy's first project to an industrial customer in the Marne, the area where Bazancourt lies, though it does not name the site, and it describes a later shift to higher-assay uranium as a prospect, not a second contract. Delivery in 2026 is stated as planned, not as a completed shipment or loading. Urenco signs advanced fuels contract with technology developer Jimmy (Jimmy newsroom copy)

Not recorded

Comparable schedule revision not established. The pages reviewed give no two dated forecasts for operation or heat supply at Bazancourt. The 29 April 2024 and 27 May 2024 dates are different statements of when the creation-authorization application was filed, not two forecasts of the same construction milestone. The planned 2026 fuel delivery is a supply date, not a reactor-operation date. Jimmy deployment announcement; ASNR, PRM projects and their fuel-fabrication plants; Urenco signs advanced fuels contract with technology developer Jimmy (Jimmy newsroom copy)

Kairos commercial proposal at Texas A&M-RELLISUnited StatesSitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded
  • Vendor for the linked designKairos Power

Not found in the sources we checked. The 4 February 2025 Texas A&M System announcement says Kairos could bring one or more commercial deployments to RELLIS and that proving-ground power could supply the ERCOT grid, but it names no buyer, quantity or agreement. The NRC's campus pre-application page, last reviewed 15 September 2026, and its Hermes page for the separate Oak Ridge test reactor name no customer either. Texas A&M System Goes Nuclear

Not found in the sources we checked. The 4 February 2025 Texas A&M System announcement and the NRC's campus pre-application page name no engineering, licensing or construction contractor for a Kairos deployment at RELLIS. The announcement says Kairos agreed to work with the System, the site host, and the System began a campus early-site-permit process. The NRC's December 2023 Hermes construction permit is for a separate test reactor at Oak Ridge, Tennessee. Texas A&M System Goes Nuclear; NRC Kairos Hermes construction permit materials

Not found in the sources we checked. The 4 February 2025 Texas A&M System announcement and the NRC's campus pre-application page, last reviewed 15 September 2026, state no amount, grant, loan or investment for Kairos at RELLIS. The campus early-site-permit process is regulatory, and the Hermes construction permit at Oak Ridge is neither funding nor this site. Texas A&M System Goes Nuclear

Not found in the sources we checked. The NRC's Hermes page describes TRISO pebble fuel with HALEU for the separate Oak Ridge test reactor, which is not a RELLIS fuel arrangement. The 4 February 2025 Texas A&M System announcement and the NRC campus pre-application page name no fuel supplier, fabrication or delivery for Kairos at RELLIS. NRC Kairos Hermes construction permit materials

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The 4 February 2025 Texas A&M System announcement says the first RELLIS reactors could be built within five years, and the NRC's campus page still shows an early-site-permit submittal planned for the fourth quarter of 2025. The Hermes dates belong to the Oak Ridge test reactor. No source read gives two dates for the same Kairos milestone at RELLIS. NRC pre-application activities: Texas A&M University System; Texas A&M System Goes Nuclear; NRC Kairos Hermes construction permit materials

Kairos Hermes 1United StatesConstructionNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
  • Intended operatorKairos Power
  • Intended licensed ownerKairos Power
  • Vendor for the linked designKairos Power

Not found in the sources we checked. The Nuclear Regulatory Commission Hermes page, last reviewed on 15 September 2026, describes Hermes 1 as a low-power test reactor supporting Kairos Power’s own KP-FHR development and states that it will not produce electricity. Kairos Power’s 20 January 2026 release says the reactor provides learning for Kairos’s future fleet, and its 17 April 2026 release names the Tennessee Valley Authority and Google only for Hermes 2 power. Those pages and World Nuclear News on 22 April 2026 do not name a research user, test beneficiary, or service customer for Hermes 1. The developer, the Department of Energy as funder, and the regulator are not treated as customers. NRC Kairos Hermes construction permit materials; Kairos Power: U.S. Department of Energy to provide HALEU for Hermes demonstration reactor; Kairos Power: Kairos Power Breaks Ground on Hermes 2 Demonstration Plant (17 April 2026); World Nuclear News: Regulator extends Hermes 1 reactor construction deadline

Source-backed project statement Kairos Power's 17 April 2026 Hermes 2 groundbreaking release says Barnard Construction Company is serving as the general contractor for both Hermes reactor projects. Hermes 1 safety-related construction has been under way since May 2025, so Barnard is the working general contractor for this unit. No contract value is stated. Kairos Power: Kairos Power Breaks Ground on Hermes 2 Demonstration Plant (17 April 2026)

Source-backed project statement DOE announced on 16 December 2020 an Advanced Reactor Demonstration Program risk-reduction award for Kairos's Hermes reduced-scale test reactor, with a DOE share of 303 million dollars of a 629 million dollar cost-shared total over seven years. Kairos said on 20 January 2026 that DOE is investing up to 303 million dollars in the project under a performance-based milestone contract. The amount disbursed is not stated. DOE: Advanced Reactor Demonstration Program awards $30 million in initial funding for risk reduction projects; Kairos Power: U.S. Department of Energy to provide HALEU for Hermes demonstration reactor

Source-backed project statement Kairos Power said on 20 January 2026 that it had finalized a contract with DOE to receive HALEU from DOE material for Hermes 1's startup and operation, and that it will use the material to produce TRISO fuel pebbles in partnership with Los Alamos National Laboratory. The supply contract is signed. Fabrication and delivery to the reactor are not yet reported. Kairos Power: U.S. Department of Energy to provide HALEU for Hermes demonstration reactor

Not recorded

Source-backed project statement Kairos Power's 16 July 2021 release scheduled Hermes to be 'operational' in 2026; its 30 July 2024 release targeted 'operational' in 2027. This is a change in the company's own forecast wording for the same Oak Ridge demonstration reactor. Neither release defines operational as a specific startup milestone, so the dates are not converted into first criticality, electricity generation or commercial operation. The later reported 2028 construction estimate means the historical 2027 forecast is not presented as current; it does not establish a replacement operation date. The separate permit-completion deadline extension from 31 December 2026 to 30 April 2029 is a legal deadline change, not this company forecast revision. World Nuclear News: Regulator extends Hermes 1 reactor construction deadline; Governor Lee, Commissioner Rolfe Announce Kairos Power to Establish Low-Power Demonstration Reactor in Oak Ridge | Kairos Power; Kairos Power Begins Construction on Hermes Low-Power Demonstration Reactor | Kairos Power

Kairos Hermes 2United StatesConstructionNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
  • Intended operatorKairos Power
  • Intended licensed ownerKairos Power
  • Vendor for the linked designKairos Power

Source-backed project statement Kairos Power announced a signed power purchase agreement with TVA on 18 August 2025 for up to 50 MW from Hermes 2, with Google receiving the clean-energy attributes. Its 28 May 2026 newsletter characterizes the PPA as binding. That is the company's characterization; the contract text, price, term and conditions were not reviewed. It establishes an announced electricity-purchase arrangement, not delivered power or completion of the plant. The company's single-reactor description remains distinct from the NRC's two-reactor permits. Kairos Power: Google, Kairos Power, TVA Collaborate to Meet America’s Growing Energy Needs (18 August 2025); Kairos Power: The Time is Now (28 May 2026 newsletter); NRC: Hermes 2 – Kairos Application (page updated 15 September 2026)

Source-backed project statement On 17 April 2026 Kairos Power said it will fabricate Hermes 2 reactor equipment modules in Albuquerque and ship them to Oak Ridge for assembly. That is the company's own fabrication plan, and the page names no outside construction contractor. Hermes 1 nuclear construction at the same campus is a different reactor. Kairos Power: Kairos Power Breaks Ground on Hermes 2 Demonstration Plant (17 April 2026)

Source-backed project statement World Nuclear News reported a binding term sheet for Samsung C&T to invest up to USD 100 million in Kairos Power through direct investment and in-kind engineering services, subject to regulatory approvals, to enable Hermes 2. This is company-level investment linked to the project; closing, disbursement and a project financing allocation are not established. WNN: Samsung C&T invests in Kairos Power

Not found in the sources we checked. Kairos and BWXT's 3 September 2025 collaboration explores commercial TRISO manufacture, possible fuel supply for Hermes 2 and subsequent reactors, and a possible jointly developed fabrication facility. Kairos's 28 May 2026 newsletter describes continuing manufacturing-development collaboration. These sources establish exploratory fuel-development work, not a firm Hermes 2 supply commitment, completed fabrication or delivery. The NRC page's fuel-form description is not a supply arrangement. No supplier role is inferred from the collaboration. Kairos Power and BWXT: commercial TRISO manufacturing collaboration; Kairos Power: The Time is Now (28 May 2026 newsletter)

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. On 18 August 2025 Kairos said the single-reactor Hermes 2 description was scheduled to begin operations in 2030. That operations date is stated once. NRC construction-permit issuance on 21 November 2024 is a completed and different milestone, and the pages do not give two forecasts of the 2030 operations date. The NRC's August 2024 final environmental assessment reports the applicant's earliest projected completion of mid-2027 for Unit 1 and mid-2028 for Unit 2. Those are approximate completion dates for the two-reactor configuration, so they are not paired with the 2030 operations date as a revision. Kairos Power: Google, Kairos Power, TVA Collaborate to Meet America’s Growing Energy Needs (18 August 2025); NRC: Hermes 2 – Kairos Application (page updated 15 September 2026); NRC: Environmental Assessment and Finding of No Significant Impact for the Construction Permits and Environmental Review Exemptions for the Kairos Hermes 2 Test Reactors, Final Report (ML24240A034)

Kaliningrad floating small nuclear plants proposalRussiaAnnounced
  • Project proposerRosatom
Not recordedNot recorded

Not found in the sources we checked. Strana Rosatom's 1 October 2026 account of the 28 September 2026 Kremlin meeting says only that small floating nuclear plants will appear, in particular, in Kaliningrad region, as part of Rosatom's energy fleet. It names no power or heat buyer, quantity or supply agreement for Kaliningrad. Rosatom director-general’s presidential meeting: Kaliningrad floating small plants

Not found in the sources we checked. Strana Rosatom's 1 October 2026 account of the 28 September 2026 Kremlin meeting says only that small floating nuclear plants will appear, in particular, in Kaliningrad region, as part of Rosatom's energy fleet. It names no shipyard, engineering or construction contractor for the Kaliningrad plants. The RITM-200 order book it describes is Rosatom's own manufacturing program across icebreakers and small plants, not a Kaliningrad contract. Rosatom director-general’s presidential meeting: Kaliningrad floating small plants

Not found in the sources we checked. Strana Rosatom's 1 October 2026 account of the 28 September 2026 Kremlin meeting says only that small floating nuclear plants will appear, in particular, in Kaliningrad region, as part of Rosatom's energy fleet. It states no amount, budget or funder for the Kaliningrad plants. Rosatom director-general’s presidential meeting: Kaliningrad floating small plants

Not found in the sources we checked. Strana Rosatom's 1 October 2026 account of the 28 September 2026 Kremlin meeting says only that small floating nuclear plants will appear, in particular, in Kaliningrad region, as part of Rosatom's energy fleet. It names no fuel supply, fabrication or delivery for the Kaliningrad plants. Rosatom director-general’s presidential meeting: Kaliningrad floating small plants

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. Strana Rosatom's 1 October 2026 account of the 28 September 2026 Kremlin meeting says only that small floating nuclear plants will appear, in particular, in Kaliningrad region, as part of Rosatom's energy fleet. It gives no date for the Kaliningrad plants, so no schedule revision is shown. Rosatom director-general’s presidential meeting: Kaliningrad floating small plants

Kärnfull Next SMR park at Målma, ValdemarsvikSwedenLicensing
  • Application filing entityReFirm Målma AB
  • Project proposerKärnfull Next
  • Parent companyStudsvik

Not found in the sources we checked. GE Vernova's 3 September 2026 release on the Studsvik, GE Vernova Hitachi and Samsung C&T agreement describes an initial four-unit BWRX-300 project of 1.2 GW at Nyköping or Valdemarsvik, with the first unit in operation in the mid-2030s. It names no buyer of the power, and the Swedish government's June 2026 note on Studsvik's state-support application names none either. Studsvik, GE Vernova Hitachi and Samsung C&T commit to advancing nuclear project

Source-backed project statement GE Vernova's 3 September 2026 release says GE Vernova Hitachi leads reactor engineering, licensing support and cost estimation, and together with Samsung C&T acts as the execution team with single-point responsibility for construction and execution of an initial four-unit BWRX-300 project planned for either Nyköping or Valdemarsvik. This is an exclusive, time-limited development agreement. The site is not chosen and there is no investment decision or construction permission. Studsvik, GE Vernova Hitachi and Samsung C&T commit to advancing nuclear project

Source-backed project statement GE Vernova's 3 September 2026 release says DS Investment Partners, a South Korean investment firm, will lead the investment during the exclusivity period, with GE Vernova's Financial Services business advising on financial structuring. The Swedish government said on 12 June 2026 that it had received Studsvik's application for state support covering four to six reactors at Valdemarsvik. No amount is committed and the state-support application is undecided. Studsvik, GE Vernova Hitachi and Samsung C&T commit to advancing nuclear project; Government of Sweden: Studsvik applies for state support (Nyköping and Valdemarsvik)

Not found in the sources we checked. GE Vernova's 3 September 2026 release describes GE Vernova's fuel business, Global Nuclear Fuel, in its company background, but does not say it will supply fuel to the Målma or Nyköping units. No fuel supplier or delivery for the project is named. Studsvik, GE Vernova Hitachi and Samsung C&T commit to advancing nuclear project

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. GE Vernova's 3 September 2026 release expects the first unit of the initial four-unit project to enter operation in the mid-2030s, at a site not yet chosen. That target is stated once in the sources read, and the record's events hold no revision pair. Studsvik, GE Vernova Hitachi and Samsung C&T commit to advancing nuclear project

Keravan Energia / Steady Energy nuclear district-heating plantFinlandAnnouncedNot recorded
  • Vendor for the linked designSteady Energy

Source-backed project statement Keravan Energia's article on its agreement with Steady Energy says Keravan Energia is planning small nuclear power for district-heat production and has an extensive district-heating network. The stated recipient of the heat is Keravan Energia's own Kerava district-heating system. No separate heat buyer or heat contract is named. Keravan Energia and Steady Energy agreement

Not found in the sources we checked. Keravan Energia's article says it and Steady Energy signed an agreement aimed at building a nuclear heating plant and will next study a site, licensing, zoning and technical and economic suitability. Steady Energy is the reactor vendor, so this is a vendor agreement, not a contractor appointment. Neither the article nor Steady Energy's 19 May 2026 page names an engineering, study or construction contractor for Kerava. Keravan Energia and Steady Energy agreement; Steady Energy: fourth Finnish city to explore nuclear district heating

Not found in the sources we checked. Keravan Energia's article says construction could start around 2029 if an investment is decided, and quotes Steady Energy's chief executive giving a reactor price of about 100 million euros to investors. That is a vendor price, not a Kerava financing decision. Neither the article nor Steady Energy's 19 May 2026 page names a funder or amount for the Kerava plant. Keravan Energia and Steady Energy agreement

Not found in the sources we checked. Steady Energy's 19 May 2026 page says the LDR-50 uses light-water technology and is refuelled every two to three years. That is a design description. Neither it nor Keravan Energia's article names a fuel supplier, quantity or delivery for the Kerava plant. Steady Energy: fourth Finnish city to explore nuclear district heating; Keravan Energia and Steady Energy agreement

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Keravan Energia's article says that, if an investment is decided, construction could begin around 2029 and district-heat production in 2032. Each target is stated once, and Steady Energy's 19 May 2026 page lists Kerava as under way without a new date. The STUK pages on the project record could not be re-read here. Keravan Energia and Steady Energy agreement; Steady Energy: fourth Finnish city to explore nuclear district heating

KHNP SMR at the Gijang-gun candidate site (11th Basic Plan)South KoreaSitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Not found in the sources we checked. KHNP's 17 June 2026 release and Asia Economy's 18 June 2026 report name Gijang-gun as the candidate host and KHNP as the company pursuing the SMR, and say the county promoted idle KHNP land at the Kori plant. They name no buyer of the reactor's power or heat, and the July and August 2026 reports read also name none. Asia Economy: Gijang SMR site and i-SMR plan (18 June 2026)

Not found in the sources we checked. Asia Economy reported on 28 August 2026 that the i-SMR technology development group, KHNP and the Korea Atomic Energy Research Institute applied on 27 February 2026 for i-SMR standard design approval. That application is for the reactor design, not a Gijang engineering or construction appointment. KHNP's 17 June 2026 release and the June and July 2026 reports read name no engineering, procurement or construction contractor for the Gijang plant. Asia Economy: NSSC receives KINS review plan for the i-SMR standard design approval (28 August 2026); KHNP: candidate sites for new nuclear plants selected; Asia Economy: Gijang SMR site and i-SMR plan (18 June 2026)

Not found in the sources we checked. World Nuclear News reported on 18 June 2026 that the science ministry plans to invest KRW 1,200 billion by 2030 in core designs for three domestic SMR types, which is national technology funding, not money for the Gijang plant. Kookje Shinmun's 14 July 2026 report says the government can support funds and sites for SMR demonstration under the new SMR act, without an amount for Gijang. No source read states a Gijang funder or amount. WNN: Sites selected for Korean nuclear new build; Government growth strategy report naming i-SMR for Gijang (14 July 2026, via Daum)

Not found in the sources we checked. The reports read describe i-SMR as a 170 MW-class integral pressurised water reactor and discuss its standard design approval. Neither they, KHNP's 17 June 2026 release nor World Nuclear News' 18 June 2026 report name a fuel supplier, quantity or delivery for the Gijang reactor. WNN: Sites selected for Korean nuclear new build; Government growth strategy report naming i-SMR for Gijang (14 July 2026, via Daum)

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. Asia Economy reported on 18 June 2026 that the Gijang i-SMR targets standard design approval by 2028, construction in 2030 and commercial operation in 2035, and Kookje Shinmun's 14 July 2026 report repeats 2035 for commercialisation. Asia Economy's 28 August 2026 report says the 2028 and 2035 plan may slip and that 2035 operation would need a 2029 permit application and an early-2030s start. A warned possible slip is not a revised target, and no later date replaces 2035. Asia Economy: Gijang SMR site and i-SMR plan (18 June 2026); Government growth strategy report naming i-SMR for Gijang (14 July 2026, via Daum); Asia Economy: NSSC receives KINS review plan for the i-SMR standard design approval (28 August 2026)

Kuopion Energia small nuclear district-heating plantFinlandSitingNot recordedNot recorded

Source-backed project statement The City of Kuopio's 11 June 2026 statement on the environmental assessment program says heat from the small nuclear plant would be carried by a new transmission link into Kuopion Energia's own district-heating network, and the ministry's 15 April 2026 notice describes the plant as built for district-heat production. The recipient is the proponent's own network. No external heat buyer or electricity offtake is named. City of Kuopio environment and building board: statement on Kuopion Energia's small nuclear plant EIA programme (11 June 2026); Ministry of Economic Affairs and Employment: public notice of Kuopion Energia's district-heating small nuclear plant EIA programme (15 April 2026), municipal copy; Steady Energy and Kuopion Energia sign pre-planning agreement

Source-backed project statement Steady Energy's 28 August 2024 release says Kuopion Energia and Steady Energy signed a one-year pre-planning agreement starting practical work towards an investment decision on an LDR-50 heating plant, with Kuopion Energia making that decision and starting the environmental assessment. This is a preparatory agreement with a prospective supplier, not a construction contract. The 2026 assessment documents name no vendor, and no renewal of the one-year agreement was read. Steady Energy and Kuopion Energia sign pre-planning agreement; Ministry of Economic Affairs and Employment: public notice of Kuopion Energia's district-heating small nuclear plant EIA programme (15 April 2026), municipal copy

Not found in the sources we checked. Steady Energy's 28 August 2024 release says Kuopion Energia is taking steps towards a final investment decision, and Kuopion Energia's 16 September 2025 resident slides describe Steady Energy's own investors. Neither, nor the 2026 assessment documents, states an amount, investment decision or financing for the Kuopio plant. Steady Energy and Kuopion Energia sign pre-planning agreement; Kuopion Energia: small nuclear power resident evening presentation (16 September 2025)

Not found in the sources we checked. The ministry's 15 April 2026 notice covers handling and interim storage of spent fuel at the site, and Kuopion Energia's 16 September 2025 slides give the LDR-50's two-to-three-year refuelling interval. Neither is a supply arrangement, and no source read names a fuel supplier, fabrication or delivery for the Kuopio plant. Ministry of Economic Affairs and Employment: public notice of Kuopion Energia's district-heating small nuclear plant EIA programme (15 April 2026), municipal copy; Kuopion Energia: small nuclear power resident evening presentation (16 September 2025)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Steady Energy's 28 August 2024 release gives one target, starting construction in the early 2030s, with an estimated 3.5-year build. The 2026 ministry notice and city statement are assessment steps, and the slides' 2035 date is when the existing Haapaniemi 2 unit's heat must be replaced. No source read restates the construction target, so no revision is shown. Steady Energy and Kuopion Energia sign pre-planning agreement; City of Kuopio environment and building board: statement on Kuopion Energia's small nuclear plant EIA programme (11 June 2026); Kuopion Energia: small nuclear power resident evening presentation (16 September 2025)

Last Energy first commercial PWR-20 site, Caldwell CountyUnited StatesLicensing
  • Project proposerLast Energy
  • OperatorLast Energy
  • Vendor for the linked designLast Energy
Not recorded

No separate question review is recorded.

Not recorded

No separate question review is recorded.

Not recorded

No separate question review is recorded.

Not recordedNo project-specific fuel supply arrangement is recorded as a structured fact.

No separate question review is recorded.

Not recorded

Comparable schedule revision not established. Last Energy's July 2026 plan dated the Caldwell limited work authorization application to September 2026; the NRC's notice records the filing on 20 October 2026. That compares a target with an achieved date, which is performance against a target, not a forecast revision, and no second forecast for this milestone is recorded. The February 2025 plan's early site permit target concerned a different kind of application for an unnamed site. The transmittal's record of change shows version 1.0 sent to the NRC for review on 21 September and formal issue on 20 October; its letter body still carries 21 September, and the NRC's filing date controls. Last Energy Regulatory Engagement Plan, Revision 1.0 (US000-NLC-REP-0001); Federal Register 91 FR 69895 (5 Nov 2026): Last Energy phased construction permit application with limited work authorization request, Caldwell site (notice of receipt); Last Energy transmittal: Caldwell Site, Part One of a construction permit application (ML26294A375); Last Energy Regulatory Engagement Plan, February 2025 (ML25038A060)

Last Energy first KSSE plant proposalPolandAnnounced
  • Project proposerLast Energy
Not recorded
  • Vendor named for this project (no design profile is linked)Last Energy

Source-backed project statement World Nuclear News reported on 23 March 2023 that Last Energy had announced purchase agreements covering 10 plants at the Katowice Special Economic Zone, representing more than 4.3 billion dollars in electricity sales, without naming the individual buyers. The company's zone page says the power will be sold under a purchase agreement to customers in the zone. This is an announced zone arrangement, not a set of named executed offtake contracts. Industrial users eye small reactors for power supply; Last Energy agrees to develop 10 of its 20 MWe micro nuclear power plants in KSSE

Not found in the sources we checked. Last Energy's KSSE case study says Last Energy itself provides full-cycle project development, including design, construction, financing and plant operations, for its ten planned plants in the Katowice Special Economic Zone, and World Nuclear News of 23 March 2023 names no other firm. No separate engineering or construction contractor is named for the first plant. Last Energy agrees to develop 10 of its 20 MWe micro nuclear power plants in KSSE

Not found in the sources we checked. Last Energy's KSSE case study describes the ten-plant program as representing US$1 billion in clean energy and infrastructure and lists financing among Last Energy's general services, and World Nuclear News of 23 March 2023 reports the same US$1 billion as expected inward investment. Neither states a funder, financing commitment or amount for the first plant. Last Energy agrees to develop 10 of its 20 MWe micro nuclear power plants in KSSE; Industrial users eye small reactors for power supply

Not found in the sources we checked. World Nuclear News of 23 March 2023 describes Last Energy's 20 MWe pressurised-water design, and the KSSE case study describes the plants and power sales, but neither names a fuel supplier, fabrication or delivery for the first KSSE plant. Industrial users eye small reactors for power supply

No project-specific fuel supply arrangement is recorded as a structured fact.

Not found in the sources we checked. World Nuclear News reported on 23 March 2023 that Last Energy targeted commissioning of the first of ten 20 MWe KSSE plants in 2026, while Last Energy's undated KSSE case study gives a targeted commissioning date of 2027 for the ten plants. The two sources disagree, but the case study is undated and its scope is the ten-plant program, so this is not shown as a dated revision of the first plant's target. Neither reports licensing or construction. Industrial users eye small reactors for power supply; Last Energy agrees to develop 10 of its 20 MWe micro nuclear power plants in KSSE

Last Energy Haskell County PWR-20 campusUnited StatesSiting
  • Project proposerLast Energy
Not recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.
  • Vendor for the linked designLast Energy

Not found in the sources we checked. Last Energy's 28 February 2025 release says the Haskell County microreactors would serve American data center customers across Texas and supply offtakers by private wire and grid transmission. It names no buyer, agreement or contracted quantity for Haskell. Its existing agreements for over 80 microreactors are in Europe. Last Energy Haskell County proposal

Not found in the sources we checked. Last Energy's 28 February 2025 release says the company itself will build the microreactors on its controlled Haskell County site, and the NRC's pre-application page names Last Energy only. Neither names an engineering, manufacturing or construction contractor for the Haskell units. Last Energy Haskell County proposal; NRC pre-application activities: Last Energy Haskell County

Not found in the sources we checked. Last Energy's 28 February 2025 release and the NRC's pre-application page state no funder, amount, loan or financing for the Haskell County campus. Last Energy Haskell County proposal

Not found in the sources we checked. Last Energy's 28 February 2025 release says the company has secured its first full core load of fuel, scheduled to arrive in September 2026. The sentence does not say the fuel is for the Haskell County units, so it is not recorded as this project's fuel. No supplier is named. Last Energy Haskell County proposal

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Last Energy's 28 February 2025 release says it was preparing to file for an early site permit, and the NRC's page shows pre-application activity from May 2025 to the present. Neither gives an earlier and later date for the same construction or operation milestone. Last Energy's February 2025 engagement plan to the NRC targeted a Part 52 early site permit by June 2025 for at least one Texas site under its control, without naming it; its 28 February 2025 release describes Haskell County site control and early-site-permit preparation, so the plan probably concerns Haskell (an inference). The NRC page, updated 15 September 2026, lists no early site permit application. The June 2025 target passed without a recorded filing, and no later date for that permit has been stated. Last Energy Haskell County proposal; NRC pre-application activities: Last Energy Haskell County; Last Energy Regulatory Engagement Plan, February 2025 (ML25038A060)

Last Energy Llynfi PWR-20 proposalUnited KingdomSiting
  • Project proposerLast Energy
Not recorded
  • Vendor for the linked designLast Energy

Not found in the sources we checked. The opened releases say the project would serve data centers, industrial customers, mid-size manufacturers, and other customers, and that Last Energy's general model is to serve private industrial customers. Those are unnamed classes. The accepted NGED offer is a grid connection for 22 MW export and 3 MW import, not a power-purchase agreement. No customer is named. Last Energy UK site licensing entry

Not found in the sources we checked. Last Energy describes its own plans to develop four 20 MWe units and says it has hosted supplier engagement events. The ONR page records a preliminary design review and pre-application advice by the regulator. Neither is a named study contract or an EPC award. No construction contractor is named. Last Energy UK site licensing entry; ONR, Licensing of new reactors

Source-backed project statement On 13 December 2024 Last Energy said the Export-Import Bank of the United States issued a non-binding letter of interest to diligence $103.7 million of financing toward one microreactor planned in South Wales. The same release says a final commitment would cover the company's entire costs for a single installation, and that due diligence was still to be completed. The 17 February 2025 release describes that letter as still pending final commitment. It is not money paid. Last Energy: Export-Import Bank of United States Issues LOI to Last Energy; Last Energy UK site licensing entry

Not found in the sources we checked. The EXIM release says the bank's review included Last Energy's access to nuclear fuel. That is company diligence before a non-binding letter of interest, not a named supplier, a quantity, or a delivery to Llynfi. The other opened Llynfi pages do not add a fuel commitment. Last Energy: Export-Import Bank of United States Issues LOI to Last Energy

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The 17 February 2025 release and the same day's World Nuclear News article both say Last Energy aims to deliver the first Wales microreactor in 2027, pending licensing, permitting, and planning. ONR's page updated 2 February 2026 still describes pre-application advice and does not replace or restate that 2027 target. One target, repeated, is not a revision. Last Energy UK site licensing entry

Last Energy London Gateway PWR-20 proposalUnited KingdomAnnouncedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded
  • Vendor for the linked designLast Energy
  • Prospective customer / offtaker (binding offtake not established)DP World

Source-backed project statement Last Energy's 15 September 2025 release says it and DP World signed a memorandum of understanding for a micro-nuclear plant that would supply power for DP World's ongoing expansion of London Gateway. A memorandum of understanding is not an executed power purchase agreement. Last Energy DP World London Gateway MOU

Not found in the sources we checked. The release says Last Energy and DP World will work with regulators and local stakeholders. It names no engineering firm, study contractor, or construction contractor. The memorandum is not an EPC award. South Wales licensing mentioned later in the release is a different project. Last Energy DP World London Gateway MOU

Source-backed project statement The 15 September 2025 release calls the initiative an £80 million subsidy-free investment for development of Last Energy's first unit. DP World's separate £1 billion port expansion is not this reactor's financing. The release does not say the £80 million has been raised, spent, or committed by a named lender. Last Energy DP World London Gateway MOU

Not found in the sources we checked. The release says the company uses existing global fuel supply chains. That is a company-wide statement, not a supplier, quantity, or delivery for London Gateway. No fuel contract is named. Last Energy DP World London Gateway MOU

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The release aims to begin operations in 2030. That is one target. The same release says a PWR-20 licensing schedule would conclude by the end of 2027 in the South Wales licensing passage. That is a different project and a different milestone, not a revision of London Gateway operations. Last Energy DP World London Gateway MOU

Last Energy PWR-20 demonstrator at RATEN Mioveni (2022 plan)RomaniaAnnounced
  • Project proposerLast Energy
Not recorded
  • Vendor for the linked designLast Energy

Not found in the sources we checked. The Government of Romania's 9 March 2022 item, RATEN's matching news item and Last Energy's 7 October 2024 release name no buyer of power or heat from a Mioveni demonstrator. The 2022 accounts cite Romania's energy independence as the purpose, and the 2024 release's industrial customers throughout Europe describe the company's market, not this site. Government of Romania: Prime Minister met representatives of Last Energy; Last Energy: enters authorization phase with nuclear regulator in Romania

Not found in the sources we checked. The Government of Romania's 9 March 2022 item and RATEN's news item say Last Energy's demonstrator would be developed on the Mioveni nuclear platform in collaboration with RATEN, the platform host. No engineering or construction contractor is named. Last Energy's 7 October 2024 release concerns CNCAN's pre-authorization review of the PWR-20 approach and does not name Mioveni. Government of Romania: Prime Minister met representatives of Last Energy; RATEN: Last Energy demonstrator on the Mioveni nuclear platform; Last Energy: enters authorization phase with nuclear regulator in Romania

Not found in the sources we checked. The Government of Romania's 9 March 2022 item says Last Energy is backed by investors involved in SpaceX projects and that the demonstrator adds to announced nuclear investments in Romania, but neither it, RATEN's item nor Last Energy's 7 October 2024 release states a funder, amount or award for the Mioveni demonstrator. Government of Romania: Prime Minister met representatives of Last Energy

Not found in the sources we checked. The March 2022 government and RATEN accounts of the Mioveni demonstrator and Last Energy's 7 October 2024 PWR-20 licensing release name no fuel manufacturer, quantity or delivery for the demonstrator. Fuel wording elsewhere on RATEN's news index concerns other reactor programs. Government of Romania: Prime Minister met representatives of Last Energy; Last Energy: enters authorization phase with nuclear regulator in Romania

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. The 9 March 2022 government item and RATEN's news item say a Mioveni demonstrator will be developed without giving a construction or operation year, and Last Energy's 7 October 2024 release dates a CNCAN pre-authorization step without naming Mioveni. No dated target exists in these sources, so no schedule revision is shown. Government of Romania: Prime Minister met representatives of Last Energy; Last Energy: enters authorization phase with nuclear regulator in Romania

Last Energy PWR-5 pilot at Texas A&M-RELLISUnited StatesConstructionNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
  • OperatorLast Energy
  • Vendor for the linked designLast Energy

Not found in the sources we checked. Last Energy said on 15 October 2025 that the RELLIS pilot would demonstrate low-power criticality and the ability to generate electricity for commercial output, and on 28 May 2026 that its separate commercial plant is designed for industrial customers and data centers. Neither statement names a buyer of this pilot’s electricity or heat. Texas A&M is described as the lessor of the site, not as the offtaker. No power purchase agreement for this pilot is stated. Last Energy: Last Energy Partners With Texas A&M to Build Microreactor at RELLIS Campus; Last Energy: company statement on PWR-5 preliminary documented safety analysis (28 May 2026)

Not found in the sources we checked. Last Energy’s 15 October 2025 and 28 May 2026 releases say the company secured the site, advanced construction, and procured equipment. They name no engineering, FEED, or construction contractor and no contract value. Last Energy: company statement on PWR-5 preliminary documented safety analysis (28 May 2026)

Not found in the sources we checked. Last Energy said on 15 October 2025 that it had signed an Other Transaction Agreement with the Department of Energy. The releases reviewed state no amount, no payment, and no financing terms for the RELLIS pilot. Selection into the pilot program is not money paid. Last Energy: Last Energy Partners With Texas A&M to Build Microreactor at RELLIS Campus

Source-backed project statement Last Energy said on 15 October 2025 that it had procured a full-core load of fuel, and on 28 May 2026 that the fuel had been manufactured while authorization to receive fuel on site was still ahead. On 7 October 2026 it said the pilot uses low-enriched uranium tied to a commercial supply chain, without naming the supplier. Manufacture is not site delivery or loading. Last Energy: Last Energy Partners With Texas A&M to Build Microreactor at RELLIS Campus; Last Energy: company statement on PWR-5 preliminary documented safety analysis (28 May 2026); Last Energy announces PWR-5 documented safety analysis approval

Comparable schedule revision not established. The releases reviewed give a preliminary safety analysis approval announced on 28 May 2026 and a documented safety analysis approval announced on 7 October 2026. Those are successive documents, not two forecasts of one milestone. No operation date is revised in these texts. Last Energy: company statement on PWR-5 preliminary documented safety analysis (28 May 2026); Last Energy announces PWR-5 documented safety analysis approval

Last Energy ten-SMR plant for the Legnica Special Economic Zone (2022)PolandAnnouncedNot recordedNot recordedNot recorded

Source-backed project statement The Legnica Special Economic Zone's 28 July 2022 announcement says the zone and DB Energy signed a letter of intent with Last Energy Polska for a ten-SMR, 200 MW plant, with the zone and its tenants taking the energy for at least 24 years. This is a letter of intent, not an executed power purchase agreement, and no later step is recorded. LSSE: Jest porozumienie w sprawie budowy elektrowni z 10 małych reaktorów; Industrial users eye small reactors for power supply

Source-backed project statement The zone's 28 July 2022 announcement says that under the letter of intent Last Energy would handle the whole investment process and DB Energy, a Wrocław energy-efficiency firm, would integrate the plant's infrastructure with end customers. This is a prospective integration role under a non-binding letter, not an engineering or construction contract, and no later step is recorded. LSSE: Jest porozumienie w sprawie budowy elektrowni z 10 małych reaktorów

Not found in the sources we checked. The Legnica Special Economic Zone's 28 July 2022 announcement says Last Energy's SMR offer generally covers the whole investment process, including financing, but it names no funder, amount, application or award for the ten-reactor Legnica plant. The more than 4.8 billion zloty figure is DB Energy's total for past energy-efficiency projects, not this plant. LSSE: Jest porozumienie w sprawie budowy elektrowni z 10 małych reaktorów

Not found in the sources we checked. The Legnica Special Economic Zone's 28 July 2022 announcement says Last Energy's offer runs through to disposal of the installation and fuel, but names no reactor model, fuel manufacturer, quantity or delivery for the Legnica plant. Its reference to fossil-fuel availability explains industrial interest in reactors and is not a fuel commitment. LSSE: Jest porozumienie w sprawie budowy elektrowni z 10 małych reaktorów

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The Legnica Special Economic Zone's 28 July 2022 announcement dates the letter of intent and an earlier June 2022 protocol on SMR development, and sets a minimum 24-year offtake period. It gives no construction or operation date for the ten-reactor plant, so no schedule revision is shown. LSSE: Jest porozumienie w sprawie budowy elektrowni z 10 małych reaktorów

LEANDREA lead-cooled demonstrator at SCK CEN Mol (EAGLES-300 program)BelgiumAnnounced
  • Project proposerSCK CEN
  • OperatorSCK CEN
Not recorded

Not found in the sources we checked. SCK CEN's 2 October 2026 page says LEANDREA will demonstrate lead-cooled fast reactor technology, serve as an irradiation facility for materials and fuels, and be used for research into applications other than electricity generation. Neither it nor the 10 February 2026 announcement names a buyer or user of LEANDREA's heat or power. SCK CEN: preparations for construction of LEANDREA take shape; RATEN: Last Energy demonstrator on the Mioveni nuclear platform

Source-backed project statement The 10 February 2026 announcement says newcleo is joining the EAGLES consortium, whose partners are Ansaldo Nucleare, ENEA, RATEN and SCK CEN, in contributing to the design and construction of LEANDREA, sharing engineering support as equivalent partners, with SCK CEN to operate it. SCK CEN's 2 October 2026 page says it plans to start construction in 2030 and has begun engaging potential suppliers. These are design and engineering partners, not a construction contract. RATEN: Last Energy demonstrator on the Mioveni nuclear platform; SCK CEN: preparations for construction of LEANDREA take shape

Not found in the sources we checked. SCK CEN's 2 October 2026 page says the Belgian federal government commissioned SCK CEN to work on LEANDREA, without an amount or funding instrument. The 10 February 2026 announcement says EAGLES and newcleo will share engineering contributions as equivalent partners and states no amount. Its newcleo funding figures concern the company, and its 112 million euro figure is the separate 4ALFRED project. RATEN: Last Energy demonstrator on the Mioveni nuclear platform; SCK CEN: preparations for construction of LEANDREA take shape

Not found in the sources we checked. SCK CEN's 2 October 2026 page and the 10 February 2026 announcement say LEANDREA will be a test and irradiation facility for fast-reactor materials and fuels. That is the facility's purpose. Neither names a fuel supplier, quantity or delivery for LEANDREA's own core. SCK CEN: preparations for construction of LEANDREA take shape; RATEN: Last Energy demonstrator on the Mioveni nuclear platform

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The 10 February 2026 announcement says LEANDREA's construction is expected to be completed in 2034, and SCK CEN's 2 October 2026 page says it plans to start construction in 2030. A completion date and a construction-start date are different milestones, so they are not a revision. RATEN: Last Energy demonstrator on the Mioveni nuclear platform; SCK CEN: preparations for construction of LEANDREA take shape

Liaoyuan DHR-400 heating demonstration proposalEarlier-plan recordChinaAnnouncedNot recorded

Not found in the sources we checked. Qian Tianlin's CET2022 presentation says CNNC's DHR-400 demonstration in Liaoyuan would heat about 10 million square metres per reactor, and CNNC's 4 September 2023 presentation places the demonstration in Liaoyuan City. Neither names a heat utility, network operator or other buyer. Qian Tianlin: Strategic Application of Small Modular Reactor in China’s Energy Development (CET2022)

Not found in the sources we checked. CNNC's 4 September 2023 presentation says the Liaoyuan demonstration's site environmental and safety analysis reports are complete, the preliminary design has been reviewed and the PSAR completed. CNNC is the proposer and developer, and the presentation and Qian Tianlin's CET2022 slides name no engineering or construction contractor. CNNC: SMR for heating applications in China, Liaoyuan demonstration status

Not found in the sources we checked. Qian Tianlin's CET2022 presentation and CNNC's 4 September 2023 presentation describe the Liaoyuan DHR-400 demonstration's targets and progress but state no funder, amount or financing. CNNC: SMR for heating applications in China, Liaoyuan demonstration status

Not found in the sources we checked. CNNC's 4 September 2023 presentation lists CF3-S fuel-assembly qualification experiments under the Liaoyuan demonstration, including heat-flux, durability, corrosion and hydraulic tests. That is fuel qualification for the design, not a fabrication contract, allocation or delivery for the plant, and none is named in the opened sources. CNNC: SMR for heating applications in China, Liaoyuan demonstration status

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Qian Tianlin's CET2022 presentation gave targets of first concrete in 2022 and operation in 2024 for the Liaoyuan demonstration, and CNNC's 4 September 2023 presentation reports completed site and safety reports and preliminary design review without restating any date. A target that passes without a new date is not a stated revision. Qian Tianlin: Strategic Application of Small Modular Reactor in China’s Energy Development (CET2022); CNNC: SMR for heating applications in China, Liaoyuan demonstration status

Linglong One (ACP100) ChangjiangChinaCommissioningNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.

Not found in the sources we checked. China News Service reported on 1 October 2026 that Linglong One was in hot functional testing and aiming for fuel loading and grid connection within 2026. That report names no buyer or offtake agreement for the unit's power or heat. China News Service: Linglong One hot functional testing (1 October 2026)

Source-backed project statement A September 2024 People's Daily app report says CNNC Engineering, CNNC Fifth Construction and CNNC 22 formed a turbine-installation group for Linglong One's generator stator lift. This identifies participants in that installation work; the report does not establish a plant-wide EPC award or contract terms. 全球首堆!“玲龙一号”发电机定子吊装就位_人民日报

Source-backed project statement The NNSA construction license of 1 July 2021 names CNNC Hainan Nuclear Power Co. as the project's investment and construction entity, responsible for resource provision and management, with Hainan Nuclear Power Co. entrusted with construction management. This identifies responsibility; it does not state a funding amount or establish a disbursement. NNSA construction licence 国核安证字第2117号: Hainan Changjiang modular small reactor demonstration project (Linglong One)

Not found in the sources we checked. China News Service's 1 October 2026 report says fuel loading is the next step after Linglong One's hot testing. It does not name the fuel fabricator, a supply contract or a delivery. China News Service: Linglong One hot functional testing (1 October 2026)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. NucNet's 7 October 2026 report contrasts an earlier 2017 construction-start target with actual construction starting in July 2021. That is performance against a target, not two dated forecasts for the same milestone. The reviewed passage does not establish a comparable target-revision pair. NucNet: Hot Testing Begins At China’s Linglong-1 Small Modular Reactor (7 October 2026)

Lister Kjernekraft SMR proposal (Lyngdal and Farsund)NorwaySitingNot recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.Not recorded

Not found in the sources we checked. The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Lister Kjernekraft AS igangsetter utredning av kjernekraft; Norsk Kjernekraft: locations (ten project companies); Norsk Kjernekraft: Taftøy assessment programme set by the government

Not found in the sources we checked. The reviewed sources do not establish an additional project-specific engineering, preparatory-work or construction assignment. A supplier’s general capabilities or an industry-wide agreement do not establish a contract for this site. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Lister Kjernekraft AS igangsetter utredning av kjernekraft

Not found in the sources we checked. The reviewed sources do not establish a project-specific financing commitment or amount. General company backing, ownership and policy support do not by themselves establish allocated or paid project funding. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Lister Kjernekraft AS igangsetter utredning av kjernekraft; Norsk Kjernekraft: Taftøy assessment programme set by the government

Not found in the sources we checked. The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Lister Kjernekraft AS igangsetter utredning av kjernekraft

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Lister Kjernekraft AS igangsetter utredning av kjernekraft; Norsk Kjernekraft: locations (ten project companies); Norsk Kjernekraft: Taftøy assessment programme set by the government

Long Mott Generating Station (Xe-100 at Dow Seadrift)United StatesLicensing
  • Vendor for the linked designX-energy
  • Prospective customer / offtaker (binding offtake not established)Dow

Source-backed project statement NRC release 26-083 (9 November 2026) says the four-reactor facility will primarily generate high-temperature steam for industrial use at the Dow Seadrift Operations site and that excess electricity will be exported to the grid. The Commission's order CLI-26-15 (6 November 2026), describing the application, says Long Mott Energy is a wholly owned subsidiary of Dow, that the facility would be built on land owned by The Dow Chemical Company to create and deliver steam to the adjacent Seadrift Operations, and that Seadrift Operations is owned and operated by a Dow affiliate. X-energy and Dow's 9 November release says the plant is intended to provide both electricity and high-temperature steam to Dow's site. This is intended supply within the Dow group. No supply contract, price or power purchase agreement is stated, and the buyer of the excess electricity is not named. NRC news release 26-083: first construction permit in nearly 60 years for a high-temperature gas-cooled reactor (Long Mott); NRC Commission order CLI-26-15, Long Mott Energy, LLC (Docket 50-614-CP); X-energy and Dow: proposed SMR project receives construction permit for nuclear-powered industrial site

Source-backed project statement X-energy's 5 November 2026 release calls its agreement with Fluor for the Cascade facility in Washington the companies' second commercial contract for nuclear island engineering and design, building on Fluor's ongoing work for X-energy's first proposed Xe-100 project in Texas under DOE's Advanced Reactor Demonstration Program; the release does not name Long Mott or Dow. Nuclear Engineering International reported on 9 April 2026 that Fluor signed a contract with X-energy to support the proposed Seadrift project, initially delivering Front-End Loading Stage 2 services (trade press; the April 2026 Fluor release on Business Wire returned an Access Denied page and was not read). X-energy's 9 November release says X-energy served as technical and licensing lead for the Long Mott Energy permit application. The Fluor work is described as a contract with X-energy; no contract between Fluor and Long Mott Energy is stated, and its value is undisclosed. No engineering, procurement and construction contractor or construction contractor is named in the sources read. X-energy: Fluor selected for Cascade nuclear-island engineering and design; X-energy and Dow: proposed SMR project receives construction permit for nuclear-powered industrial site; NEI: Fluor joins Seadrift SMR project

Source-backed project statement The Commission's order CLI-26-15 (6 November 2026) recounts that Long Mott Energy's application originally relied on an award from DOE's Advanced Reactor Demonstration Program without including a copy of the award, and that on 3 March 2026 it supplemented the application with a non-public financial agreement between itself and Dow that the order describes as a conditional commitment by Dow to fund at least half of the estimated construction costs (the order also words this as 'more than half'). Dollar amounts and contractual terms were redacted in the Licensing Board's public description, and the order does not state the conditions. X-energy's 9 November 2026 release says X-energy has been informed that its DOE award is intended to be increased to 2.15 billion dollars in total, to deliver a first-of-a-kind commercial advanced nuclear plant and the TRISO-X fuel fabrication facility; the release does not say how much applies to Long Mott. ANS reported on 17 August 2026 an additional 1 billion dollars of cost-shared funding, and NEI reported in April 2026 a 2024 joint development agreement of up to 50 million dollars; the sources read do not reconcile these figures. The construction permit states that the NRC found Long Mott Energy financially qualified to design and construct the facility under its regulations. The DOE award is held by X-energy. No signed award modification, Dow final investment decision or project financing is stated. NRC Commission order CLI-26-15, Long Mott Energy, LLC (Docket 50-614-CP); X-energy and Dow: proposed SMR project receives construction permit for nuclear-powered industrial site; NRC Construction Permit No. CPAR-3, Long Mott Generating Station (ML26301A133); ANS Nuclear News: X-energy, TerraPower share updates on advanced reactor projects; NEI: Fluor joins Seadrift SMR project

  • Fuel supplier named for this projectTRISO-X, LLC

Source-backed project statement X-energy and Dow's 9 November 2026 release says that in April 2025 TRISO-X was allocated an initial tranche of high-assay low-enriched uranium (HALEU) through DOE's HALEU Availability Program, which will be used to manufacture fuel for the first core loads at Long Mott. DOE's 9 April 2025 release lists TRISO-X among five developers given conditional commitments for HALEU and does not name Long Mott. DOE said on 17 November 2025 that TX-1, TRISO-X's fuel facility, was under construction with initial production supporting the proposed Seadrift plant. The NRC's May 2026 environmental assessment says the source of fresh fuel was not stated in the applicant's environmental report, although the report described the fuel production process and discussed the TRISO-X facility (section 5.7.1); for its transport analysis the assessment considers shipments between a fuel fabrication facility in Oak Ridge, Tennessee and the site. TRISO-X is X-energy's affiliate. No fuel supply contract with Long Mott Energy, no delivery, and no start of TX-1 production are stated in the sources read. X-energy and Dow: proposed SMR project receives construction permit for nuclear-powered industrial site; DOE: U.S. Department of Energy to Distribute First Amounts of HALEU to U.S. Advanced Reactor Developers; DOE: X-energy starts building construction of advanced nuclear fuel facility; Environmental Assessment and Finding of No Significant Impact for the Construction Permit and Environmental Review Exemptions for the Long Mott Generating Stati

Not recorded

Comparable schedule revision not established. X-energy and Dow's 9 November 2026 release describes first delivery in the early 2030s as the long-established timeline and says Dow is expected to consider a preliminary investment decision in 2027, with full-scale construction following a final investment decision. The construction permit sets a completion window of 1 July to 31 December 2033, which is a permit term, not an operation target. NEI reported on 9 April 2026 that the 2024 joint development agreement aimed to deploy the four-unit plant by 2030, but no company or regulator document read states both an earlier and a later operation target for this plant. Dated 2023 and 2024 Dow and X-energy schedule statements were not captured in this review. X-energy and Dow: proposed SMR project receives construction permit for nuclear-powered industrial site; NRC Construction Permit No. CPAR-3, Long Mott Generating Station (ML26301A133); NEI: Fluor joins Seadrift SMR project

Maoming Green Energy HTGR proposal (Phase 1 planning)ChinaAnnouncedNot recordedNot recordedNot recorded

Not found in the sources we checked. CNNC's 25 November 2025 expo report says the Maoming Zero-Carbon Industrial Park plan uses Hualong One and HTGR technology and couples nuclear energy with petrochemical industry, which names a sector, not a buyer. Neither it nor the Foshan Geological Bureau's 21 March 2023 page names a recipient of heat or power from the HTGR component. CNNC EN: Maoming Zero-Carbon Industrial Park Hualong One and HTGR exhibit; Guangdong Foshan Geological Bureau: Maoming Green Energy site geological survey acceptance

Source-backed project statement The Foshan Geological Bureau reported on 21 March 2023 that its regional geological survey center carried out the feasibility-study-stage geological survey for the Maoming Green Energy project from early December 2022, and that the results were accepted on 15 March 2023 at a meeting chaired by the owner, CNNC's Chinergy (中核能源科技有限公司). This is a completed preparatory siting survey, not a design or construction contract. Guangdong Foshan Geological Bureau: Maoming Green Energy site geological survey acceptance

Not found in the sources we checked. CNNC's 25 November 2025 expo report and the Foshan Geological Bureau's 21 March 2023 page state no amount, funder or allocation for the Maoming HTGR component. The saved copy of a June 2023 BJX planning article is a web challenge page and could not be read. CNNC EN: Maoming Zero-Carbon Industrial Park Hualong One and HTGR exhibit; BJX: Guangdong energy project list naming Maoming Green Energy Phase 1 3x200 MW

Not found in the sources we checked. CNNC's 25 November 2025 expo report lists nuclear fuel among expo topics, not as a Maoming supply, and CNNC's 7 December 2023 page on fuel-element manufacturing concerns the HTR-PM demonstrator at Rongcheng in Shandong. Neither names a fuel supplier, allocation or delivery for the Maoming HTGR component. CNNC EN: Maoming Zero-Carbon Industrial Park Hualong One and HTGR exhibit; CNNC EN: Chinergy commercialising modular HTR technology

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The Foshan Geological Bureau's 21 March 2023 page dates only a geological survey, done from December 2022 and accepted on 15 March 2023, and CNNC's 25 November 2025 report dates an expo. Neither gives a construction or operation date for the Maoming HTGR, so no milestone is revised. The HTR-PM dates on CNNC's 2023 page are for Rongcheng. Guangdong Foshan Geological Bureau: Maoming Green Energy site geological survey acceptance; CNNC EN: Maoming Zero-Carbon Industrial Park Hualong One and HTGR exhibit; CNNC EN: Chinergy commercialising modular HTR technology

MARVEL microreactor test bed at INL's TREAT facilityUnited StatesConstructionNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.

Not found in the sources we checked. DOE's MARVEL project page says the test bed will engage microreactor end-user companies, with preference for private-sector end users who can use the reactor's energy in self-funded or cost-shared test cases under an anticipated notice of opportunity. No end user, buyer or agreement is named. DOE: MARVEL microreactor project

Not found in the sources we checked. DOE's MARVEL project page and DOE's February 2024 fuel-fabrication article describe MARVEL as a DOE test bed being assembled for installation in INL's TREAT facility. They name TRIGA International as the fuel contractor but no engineering or construction contractor for the reactor itself. DOE: MARVEL microreactor project

Source-backed project statement DOE's MARVEL project page says MARVEL is funded under DOE's Office of Nuclear Energy Microreactor Program within the Advanced Reactor Technologies Program. No amount is stated. Future end-user tests are to be cost-shared, with no direct financial awards. DOE: MARVEL microreactor project

  • Fuel supplier named for this projectTRIGA International

Source-backed project statement DOE reported on 7 February 2024 that TRIGA International was awarded an approximately 8.4 million dollar contract in November 2023 to produce 37 TRIGA fuel elements for MARVEL and had started fabrication at its Romans, France facility in January 2024. Delivery of the fuel to INL is not recorded in the sources read. DOE: Fuel fabrication starts for MARVEL microreactor

Not recorded

Source-backed project statement MARVEL's October 2022 technical-review presentation targeted criticality by summer 2024. INL's 6 October 2026 release, read in an archived copy, anticipated criticality in December; the year 2026 is inferred from that release's context. Its dry-criticality configuration has no coolant and is distinct from full-power operation. This is a partial history of criticality expectations, not proof that the two forecasts assumed the same coolant configuration. DOE's separate project page records a 2027 dry-criticality forecast, so the reviewed sources do not establish one reconciled current target. The February 2024 phrase 'online by 2027' does not identify criticality and is not used as an intermediate criticality forecast. No delay duration is calculated. MARVEL microreactor start-up now expected in 2027, as fuel fabrication begins -- ANS / Nuclear Newswire; DOE: Fuel fabrication starts for MARVEL microreactor; DOE Office of Nuclear Energy: MARVEL microreactor project page; Interesting Engineering: 85-kW MARVEL microreactor gets liquid-metal coolant ahead of criticality test (6 October 2026); MARVEL reactor design overview, October 2022 technical review; INL news release (6 Oct 2026): MARVEL reactor gets federal safety approval as its primary vessel arrives in Idaho

Meta–TerraPower initial dual-unit Natrium proposalUnited StatesAnnounced
  • Project proposerTerraPower
Not recorded
  • Vendor for the linked designTerraPower
  • Prospective customer / offtaker (binding offtake not established)Meta Platforms

Source-backed project statement TerraPower's 9 January 2026 release says the agreement supports early development of two new Natrium units, with energy rights for Meta for up to six further units. The figure of up to 2.8 gigawatts is the envelope for as many as eight plants. No site, price or delivery point is stated. The six further units are rights, not additional committed plants. TerraPower and Meta: initial two units and additional rights

Not found in the sources we checked. TerraPower's 9 January 2026 announcement says its agreement with Meta supports early development of two new Natrium units, with a site for the initial dual unit to be identified in the coming months. TerraPower is the developer and vendor, and the footnote that Natrium is a TerraPower and GE-Hitachi technology describes the design, not an appointment. No engineering or construction contractor is named for these units. TerraPower and Meta: initial two units and additional rights

  • Funder or lender named for this projectMeta Platforms

Source-backed project statement The 9 January 2026 release says Meta will provide funding to support deployment of the Natrium plants, and that the agreement covers early development of the first two units. No amount is stated. The release does not say construction costs have been paid. TerraPower and Meta: initial two units and additional rights

Not found in the sources we checked. TerraPower's 9 January 2026 announcement on the Meta agreement describes Natrium output and storage but names no fuel supplier, enrichment arrangement, quantity or delivery for the initial dual unit. TerraPower and Meta: initial two units and additional rights

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. TerraPower's 9 January 2026 announcement gives one target, delivery of initial units as early as 2032, and says a site for the initial dual unit would be identified in the coming months. One target stated once is not a revision. TerraPower and Meta: initial two units and additional rights

Microreactor at Naval Weapons Station CraneUnited StatesAnnouncedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Source-backed project statement The American Nuclear Society's 11 September 2026 report quotes the Defense Department saying the Crane microreactor will provide reliable, around-the-clock power independent of the commercial grid to sustain critical operations, and World Nuclear News on 14 September 2026 reports the same. The stated user is the Naval Weapons Station Crane installation, which is also the host. No power purchase agreement or other buyer is named, and a separate Indiana and Eli Lilly letter of intent is not tied to Crane. ANS: Navy's first terrestrial reactor coming to Indiana's NWS Crane; WNN: Indiana to get its first power-producing nuclear reactor

Not found in the sources we checked. The September 2026 source scope did not name a Crane developer or engineering/construction contractor. Radiant's later selection is now recorded as the vendor; vendor selection does not identify a separate awarded engineering or construction contract. ANS: Navy's first terrestrial reactor coming to Indiana's NWS Crane; WNN: Indiana to get its first power-producing nuclear reactor

Not found in the sources we checked. The September 2026 reports reviewed here state no Crane-specific funding amount or award. Radiant's later selection is recorded separately; a program-wide amount must not be allocated to this installation. WNN: Indiana to get its first power-producing nuclear reactor; ANS: Navy's first terrestrial reactor coming to Indiana's NWS Crane

Not found in the sources we checked. The September 2026 reports reviewed here did not identify a Crane-specific fuel supplier or delivery. The later selection of Kaleidos is recorded separately and does not establish a project-specific fuel delivery. WNN: Indiana to get its first power-producing nuclear reactor; ANS: Navy's first terrestrial reactor coming to Indiana's NWS Crane

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The American Nuclear Society's 11 September 2026 report and World Nuclear News' 14 September 2026 report both say the Crane reactor will be installed by September 2028. The same target in two reports of one announcement is not a revision. ANS: Navy's first terrestrial reactor coming to Indiana's NWS Crane; WNN: Indiana to get its first power-producing nuclear reactor

Midpoint SMR Project #1 (Sawtooth / SEDC, Jerome County)United StatesAnnouncedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Not found in the sources we checked. Sawtooth Energy & Development Corporation's project page says Midpoint SMR Project #1 would connect to Idaho Power's Midpoint Substation and serve growing regional demand, including sectors such as AI development, but it names no buyer, quantity or power purchase agreement. A grid connection point is not an offtake. The Global Energy Monitor entry names no customer either. SEDC Midpoint Small Modular Reactor Project #1

Not found in the sources we checked. Sawtooth Energy & Development Corporation's project page says the company proposes to construct and operate Midpoint SMR Project #1 itself and names no reactor vendor, engineering firm or construction contractor. The Global Energy Monitor table lists a NuScale model, which is directory text, not a vendor or engineering agreement. SEDC Midpoint Small Modular Reactor Project #1; GEM Global Nuclear Power Tracker public map ? Midpoint SMR

Not found in the sources we checked. Sawtooth Energy & Development Corporation's project page says the project would provide long-term revenue to the US government through the Bureau of Land Management but states no cost, investor, loan or financing for Midpoint SMR Project #1. The Global Energy Monitor entry states no amount. SEDC Midpoint Small Modular Reactor Project #1

Not found in the sources we checked. Sawtooth Energy & Development Corporation's project page describes three to six SMR modules and the site but does not mention fuel, and the Global Energy Monitor table lists only a reactor type and model. No fuel supplier, fabrication or delivery for Midpoint SMR Project #1 is named. SEDC Midpoint Small Modular Reactor Project #1; GEM Global Nuclear Power Tracker public map ? Midpoint SMR

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Sawtooth Energy & Development Corporation's project page gives a configuration and site but no construction or operation year, and the Global Energy Monitor entry lists the plant as announced with only a page-edit date. No dated target exists in these sources, so no schedule revision is shown. SEDC Midpoint Small Modular Reactor Project #1; GEM Global Nuclear Power Tracker public map ? Midpoint SMR

Moltex SSR-W at Point LepreauCanadaAnnounced
  • Project proposerNB Power
Not recorded
  • Vendor for the linked designMoltex Energy

Not found in the sources we checked. World Nuclear News reported on 16 July 2018 that Moltex's chief executive called the SSR-W a fit for New Brunswick's power needs that could lower electricity costs to consumers. Neither that report, Moltex's first-reactor page nor Nuclea's 13 August 2026 announcement names a buyer or agreement for power from a Point Lepreau SSR-W. WNN: Moltex partners in New Brunswick SMR project; Moltex: our first reactor (Point Lepreau)

Not found in the sources we checked. World Nuclear News reported on 16 July 2018 that Moltex would build a demonstration SSR-W at Point Lepreau under an agreement with the New Brunswick Energy Solutions Corporation, a provincial and NB Power joint venture, and NB Power. Moltex is the reactor vendor and the counterparties are the site owner and a government vehicle, so this is not a contractor appointment. No engineering or construction contractor is named, and Nuclea's August 2026 asset purchase had not closed. WNN: Moltex partners in New Brunswick SMR project; Moltex: our first reactor (Point Lepreau); Nuclea Energy enters definitive agreement to acquire Moltex Energy's assets

Source-backed project statement World Nuclear News reported on 16 July 2018 that the agreement with the New Brunswick Energy Solutions Corporation and NB Power for a Point Lepreau SSR-W demonstration provides CAD 5.0 million of financial support to Moltex for its immediate development activities. This is development support, not construction funding, and the report does not say it was paid. Other figures read (a CAD 10 million provincial research-cluster commitment and Nuclea's C$96 million company total) are not this project's funding. WNN: Moltex partners in New Brunswick SMR project; Nuclea Energy enters definitive agreement to acquire Moltex Energy's assets

Not found in the sources we checked. World Nuclear News' 16 July 2018 report quotes Moltex saying the SSR-W uses spent nuclear fuel, and Nuclea's 13 August 2026 announcement says the SSR-W uses recycled material as fuel salt and that its WATSS recycling process was demonstrated with used fuel at Canadian Nuclear Laboratories. These describe the design and a fuel process. None names a quantity, source or delivery of fuel for a Point Lepreau reactor. WNN: Moltex partners in New Brunswick SMR project; Nuclea Energy enters definitive agreement to acquire Moltex Energy's assets

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Not found in the sources we checked. World Nuclear News reported on 16 July 2018 that the agreement called for Moltex to deploy its first SSR-W at Point Lepreau before 2030, while Moltex's first-reactor page, read in 2026, says it is on its way to an operational reactor by the early to mid 2030s. The page sentence is undated, so the two targets cannot be placed as a dated revision, but they differ for the same first reactor. WNN: Moltex partners in New Brunswick SMR project; Moltex: our first reactor (Point Lepreau)

Myanmar 110 MW SMR project (two RITM-200N; site not named)MyanmarAnnouncedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded
  • Vendor for the linked designRosatom

Not found in the sources we checked. World Nuclear News reports of 5 March 2025 and 25 August 2026 and the Atomnaya energiya 2.0 reports of 19 and 24 August 2026 name no buyer of power from the Myanmar SMR project and no site. The Russian president's remark about supplying Myanmar's economy with energy and Rosatom's reference to customers setting the pace do not identify an offtaker or terms. WNN: Myanmar and Russia sign SMR cooperation agreement; WNN: Myanmar SMR site work could start in 2027

Not found in the sources we checked. The 5 March 2025 World Nuclear News report says Rosatom's director general and Myanmar's science minister signed the intergovernmental agreement for a 110 MW SMR project, and the 24 August 2026 Atomnaya energiya 2.0 report says Rosatom, the vendor, expects to sign a contract for initial engineering surveys by the end of 2026. That survey contract is not yet signed, and no engineering or construction contractor is named. WNN: Myanmar and Russia sign SMR cooperation agreement; Atomic Energy 2.0 (relaying Strana Rosatom): Rosatom to begin engineering surveys at the Myanmar small NPP site in 2027

Not found in the sources we checked. The 5 March 2025 and 25 August 2026 World Nuclear News reports and the August 2026 Atomnaya energiya 2.0 reports describe the intergovernmental agreement, an expected survey contract and the RITM-200N configuration but state no amount, lender or financing terms for the Myanmar project. WNN: Myanmar and Russia sign SMR cooperation agreement

Not found in the sources we checked. World Nuclear News of 25 August 2026 describes RITM-200N reactors adapted from the icebreaker RITM-200, a design statement. None of the four reports read names a fuel manufacturer, quantity or delivery for the Myanmar project. WNN: Myanmar SMR site work could start in 2027

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The 5 March 2025 report dates the agreement without a construction year. The August 2026 reports say Rosatom expects to sign a survey contract by the end of 2026 and begin site work in 2027, with Rosatom's chief calling site entry essentially the start of construction. The 2027 site-work target is stated consistently and not revised, and construction has not begun. WNN: Myanmar and Russia sign SMR cooperation agreement; Atomic-energy.ru: Russia starts implementation of the Myanmar agreements (19 August 2026); Atomic Energy 2.0 (relaying Strana Rosatom): Rosatom to begin engineering surveys at the Myanmar small NPP site in 2027; WNN: Myanmar SMR site work could start in 2027

NANO Nuclear microreactors for Digihost's North Tonawanda power plant (2024 MOU)United StatesAnnouncedNot recordedNot recorded

Source-backed project statement NANO Nuclear's 13 December 2024 announcement says the non-binding memorandum aims to use NANO's microreactors to provide reliable baseload power for Digihost's own data center operations at its 60 MW upstate New York power plant, replacing its existing gas infrastructure. The intended user is Digihost, the host. This is a non-binding memorandum, not a power purchase agreement, and definitive agreements are still to come. NANO Nuclear and Digihost announce microreactor collaboration (13 Dec 2024)

Not found in the sources we checked. NANO Nuclear's 13 December 2024 announcement says NANO will provide consulting services to Digihost, including regulatory advice, site assessment, roadmap development and stakeholder engagement, under a non-binding memorandum. NANO is the reactor developer, so this is not a separate contractor appointment, and no engineering or construction contractor is named. NANO Nuclear and Digihost announce microreactor collaboration (13 Dec 2024)

Not found in the sources we checked. NANO Nuclear's 13 December 2024 announcement describes a non-binding memorandum and future definitive agreements but states no funder, amount or payment for the Digihost microreactor project. NANO Nuclear and Digihost announce microreactor collaboration (13 Dec 2024)

Not found in the sources we checked. NANO Nuclear's 13 December 2024 announcement names its ZEUS and ODIN microreactor designs but no fuel supplier, quantity or delivery for the Digihost site. NANO Nuclear and Digihost announce microreactor collaboration (13 Dec 2024)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. NANO Nuclear's 13 December 2024 announcement gives one target, reactor integration within Digihost's operations in 2031, aligned with NANO's licensing expectations. One target stated once is not a revision. NANO Nuclear and Digihost announce microreactor collaboration (13 Dec 2024)

Narvik Kjernekraft SMR plant proposal at Fornes, BallangenNorwaySitingNot recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.Not recorded

Not found in the sources we checked. The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Narvik Kjernekraft: notification and proposed assessment programme (PDF); Narvik Kjernekraft: melding with proposed assessment programme; Norsk Kjernekraft: Futurum and Norsk Kjernekraft establish Narvik Kjernekraft; Norsk Kjernekraft: locations (ten project companies); Norsk Kjernekraft: Taftøy assessment programme set by the government

Not found in the sources we checked. The reviewed sources do not establish an additional project-specific engineering, preparatory-work or construction assignment. A supplier’s general capabilities or an industry-wide agreement do not establish a contract for this site. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Narvik Kjernekraft: melding with proposed assessment programme; Narvik Kjernekraft: notification and proposed assessment programme (PDF)

Not found in the sources we checked. The reviewed sources do not establish a project-specific financing commitment or amount. General company backing, ownership and policy support do not by themselves establish allocated or paid project funding. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Narvik Kjernekraft: melding with proposed assessment programme; Narvik Kjernekraft: notification and proposed assessment programme (PDF); Norsk Kjernekraft: Futurum and Norsk Kjernekraft establish Narvik Kjernekraft; Norsk Kjernekraft: Taftøy assessment programme set by the government

Not found in the sources we checked. The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Narvik Kjernekraft: notification and proposed assessment programme (PDF)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Damaged table text does not securely associate every year with its milestone; no target is inferred from it. Narvik Kjernekraft: notification and proposed assessment programme (PDF); Narvik Kjernekraft: melding with proposed assessment programme; Norsk Kjernekraft: Taftøy assessment programme set by the government; Norsk Kjernekraft: locations (ten project companies)

Natrium Kemmerer Unit 1United StatesConstruction
  • Application filing entityTerraPower
  • Parent companyTerraPower
  • Vendor for the linked designTerraPower

Source-backed project statement The Public Service Commission of Utah's 1 June 2026 order approved Rocky Mountain Power's application and a settlement concerning a power purchase agreement with US SFR Owner, the TerraPower subsidiary building Kemmerer Unit 1, to buy energy from the plant. The order approves the utility's decision. It does not state when the agreement was signed. Public Service Commission of Utah: order approving Rocky Mountain Power's Natrium PPA waiver application (Docket 25-035-55)

Source-backed project statement World Nuclear News reported on 22 September 2026 that Bechtel, TerraPower's design, licensing, procurement and construction partner since 2020, and TerraPower would move forward separately; Bechtel would complete the Sodium Test & Fill Facility, and TerraPower would rebid the EPC contract; that report named no replacement EPC contractor. Separately, TerraPower announced on 31 August 2026 the selection of 12 supplier awards for equipment and design for Kemmerer Unit 1 and the sodium test and fill facility, such as control rod drive design by BWXT Canada. These are equipment and design supplier awards; the release does not identify an EPC appointment. World Nuclear News: Bechtel steps away from TerraPower project; TerraPower Awards Next Round of Vendor Contracts for Natrium Reactor

Source-backed project statement DOE's article on the March 2026 construction permit says Natrium is one of two Advanced Reactor Demonstration Program projects and was awarded cost-shared DOE funding for design and licensing, fuel development and two supporting facilities. DOE's 13 October 2020 announcement awarded TerraPower 80 million dollars in initial funding and said DOE would invest 3.2 billion dollars over seven years across the program, subject to future appropriations, with industry matching funds. The current Natrium cost-share total and amounts disbursed are not stated in the sources read. DOE Natrium construction permit; DOE: first awards under the Advanced Reactor Demonstration Program (13 Oct 2020)

  • Fuel supplier named for this projectASP Isotopes Inc.

Source-backed project statement ASP Isotopes announced on 19 May 2025 that it and certain subsidiaries had entered into definitive agreements with TerraPower, including an initial-core HALEU supply agreement intended to support the first fuel cores for the Natrium project in Wyoming. A separate ten-year agreement covers up to 150 metric tonnes of HALEU supplied to TerraPower from 2028 through 2037; that total is not allocated entirely to this project. The announcement described a proposed enrichment facility at Pelindaba, South Africa, with initial production expected in 2027 subject to required permits and licenses. This is an attributed supply-agreement announcement, not evidence of completed fuel fabrication or delivery. The cited announcement does not establish the facility's current construction or licensing status. TerraPower's own statement on these agreements was not read. TerraPower announces strategic agreement (ASP Isotopes HALEU); POWER: TerraPower's Kemmerer 1 enters construction - timeline of the Natrium project; ASP Isotopes Inc. enters into Definitive Agreements with TerraPower (GlobeNewswire release, Finviz copy)

Source-backed project statement GeekWire reported in December 2022 that TerraPower expected Kemmerer's start of operation to be delayed by at least two years from its original 2028 target because HALEU would not be ready. That reported delay concerns the same start-of-operation target and is a minimum, not an exact revised year. NucNet's September 2026 construction-completion and commercial-operation targets are different milestones and are not used to construct a 2028-to-2031 revision pair. TerraPower warns of 2-year minimum delay for launch of demo reactor due to Russia-Ukraine war – GeekWire; NucNet: TerraPower and Bechtel part ways on Natrium-1 nuclear project in Wyoming

Natura MSR-1 demonstration at Abilene Christian UniversityUnited StatesConstructionNot recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.
  • Vendor for the linked designNatura Resources

Not found in the sources we checked. The NRC page says the Molten Salt Research Reactor is a low-power reactor to support academic research and that it will not produce electricity. The university describes a research alliance with Georgia Tech, Texas A&M, and the University of Texas to design, license, and build it. Neither those pages nor Natura's 21 July 2026 release names a research-service customer or an electricity buyer for MSR-1. The commercial MSR-100 market language on that release is a different product. NRC: ACU molten-salt research reactor application; Abilene Christian University: NEXT Lab research with Natura; naturaresources.com: Natura announces DOE approval of the Nuclear Safety Design Agreement for MSR-1

Not found in the sources we checked. The NRC permit page, the university partnership page, Natura's 21 July 2026 release, and the 22 September 2026 salt notice name no engineering or construction firm for MSR-1. Natura is the developer and Abilene Christian University holds the construction permit. Those roles are not a construction award. NRC: ACU molten-salt research reactor application; naturaresources.com: Natura announces DOE approval of the Nuclear Safety Design Agreement for MSR-1; DOE Office of Nuclear Energy: Department of Energy Provides Rare Salt Material to Natura Resources

  • Funder or lender named for this projectNatura Resources

Source-backed project statement The university says Natura committed to investing $30.5 million in the molten salt research reactor project, with $21.5 million of that for Abilene Christian University and the rest for the other universities in the alliance. That is a stated commitment, and the page does not show the amount paid. Natura's 21 July 2026 description of more than $120 million in private funding and $120 million from the State of Texas is not identified as money for this reactor. Abilene Christian University: NEXT Lab research with Natura; naturaresources.com: Natura announces DOE approval of the Nuclear Safety Design Agreement for MSR-1

Source-backed project statement On 26 August 2025 the Department of Energy made a conditional commitment to provide high-assay low-enriched uranium to Abilene Christian University and Natura for a molten salt research reactor under construction in Texas, with contracting still to be initiated. On 22 September 2026 the Department said more than 4,700 pounds of FLiBe salt, formerly coolant from the Molten Salt Reactor Experiment, arrived on 18 September 2026 for MSR-1. The salt arrival is not uranium delivery or fuel loading. The NRC table's description of fuel dissolved in salt is a design description, not a supply record. DOE: U.S. Department of Energy to Distribute Next Round of HALEU to U.S. Nuclear Industry; DOE Office of Nuclear Energy: Department of Energy Provides Rare Salt Material to Natura Resources; NRC: ACU molten-salt research reactor application

Comparable schedule revision not established. The NRC page records completed review dates and the 16 September 2024 construction permit, and it states no operation date. Natura's 21 July 2026 release describes progress toward eventual operation without a date, and the university timeline says the reactor will go critical without a date. These pages do not give two dated forecasts for the same operation milestone. NRC: ACU molten-salt research reactor application; naturaresources.com: Natura announces DOE approval of the Nuclear Safety Design Agreement for MSR-1; Abilene Christian University: NEXT Lab research with Natura

Natura MSR-100 proposal at Texas A&M-RELLISUnited StatesSitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded
  • Vendor for the linked designNatura Resources

Not found in the sources we checked. The 4 February 2025 Texas A&M System announcement quotes Natura planning to deploy its commercial MSR-100 at RELLIS to address Texas and national energy needs, and says proving-ground power could supply the ERCOT grid, but it names no buyer, quantity or agreement. The NRC's campus pre-application page, last reviewed 15 September 2026, names none either. Texas A&M is the site host, not a customer. Texas A&M System Goes Nuclear

Not found in the sources we checked. The 4 February 2025 Texas A&M System announcement and the NRC's campus pre-application page name no engineering, licensing or construction contractor for a Natura MSR-100 at RELLIS. The announcement quotes Natura continuing its partnership with the System, the site host, to deploy the MSR-100 there, and says the System began a campus early-site-permit process. The earlier MSR-1 collaboration is a separate project. Texas A&M System Goes Nuclear

Not found in the sources we checked. The 4 February 2025 Texas A&M System announcement and the NRC's campus pre-application page, last reviewed 15 September 2026, state no amount, grant, loan or investment for a Natura MSR-100 at RELLIS. The campus early-site-permit process is regulatory, not a funding instrument. Texas A&M System Goes Nuclear

Not found in the sources we checked. The 4 February 2025 Texas A&M System announcement and the NRC's campus pre-application page name no fuel supplier, fabrication, allocation or delivery for a Natura MSR-100 at RELLIS. The announcement does not discuss fuel. Texas A&M System Goes Nuclear

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The 4 February 2025 Texas A&M System announcement says the first RELLIS reactors could be built within five years, and the NRC's campus page, last reviewed 15 September 2026, still shows an early-site-permit submittal planned for the fourth quarter of 2025. These are different campus-level milestones, each stated once, so no revision is shown for the Natura MSR-100. NRC pre-application activities: Texas A&M University System; Texas A&M System Goes Nuclear

NB Power ARC-100 at Point LepreauCanadaLicensing
  • Application filing entityNB Power
  • Project proposerNB Power
  • OperatorNB Power

Source-backed project statement NB Power's 30 June 2023 release presents the ARC-100 at Point Lepreau as part of its own plan to phase out coal by 2030 and reach net-zero supply by 2035 for New Brunswick customers, and the CNSC lists NB Power as licensee. The output would serve NB Power's own system. No external buyer, industrial offtake or purchase agreement is named. NB Power: NB Power Submits Environmental Impact Assessment Registration and Licence to Prepare Site Application for Advanced Small Modular Reactor Project; CNSC: Status of new nuclear projects - NB Power ARC-100 at Point Lepreau

Source-backed project statement World Nuclear News reported on 30 June 2022 that ARC Canada signed a teaming agreement with Hatch for digital plant design in the New Brunswick deployment effort. This identifies preparatory engineering work, not a Point Lepreau construction award. The report also discusses wider industrial applications; those are not treated as site-specific contracts. ARC teams up with Hatch for New Brunswick SMR deployment

Source-backed project statement An April 2022 company release, reprinted by Financial Post, announced CAD 30 million in Series A financing for ARC Clean Energy Canada, with Point Lepreau deployment among its stated uses. An October 2023 company release announced a $7 million federal predevelopment award for ARC Clean Technology Canada, supporting a future fleet beginning with Point Lepreau; that release does not specify a currency code. These are company financing and predevelopment support, not a disclosed NB Power construction budget or a standalone unit financing allocation. Cash disbursement is not established. The two historical company names are retained as stated, without treating them as proved legal aliases. ARC Canada announces Series A financing; ARC announces federal predevelopment award

Not found in the sources we checked. The June 2023 Revision 0 Point Lepreau EIA registration document states that fuel would be sourced from outside Canada and describes planned transport in certified containers. This proponent plan identifies no supplier or fabricator and establishes no fuel-delivery agreement. Geography and a planned handling method do not establish procurement. ARC Clean Technology Advanced Small Modular Reactor - Commercial Demonstration Unit, Point Lepreau: New Brunswick Environmental Impact Assessment Registration D

No project-specific fuel supply arrangement is recorded as a structured fact.

Not found in the sources we checked. Nuclear Engineering International's 7 May 2024 report gives both commissioning by 2029 and commissioning by the end of 2030 for the Point Lepreau ARC-100. The dates conflict within that account; they are not treated as a documented revision between two dated forecasts. NB Power's June 2023 EIA registration, which predates that report, shows an estimated schedule with a license to operate in January 2029 and commercial operation in the early 2030s. It is an older estimate and does not settle which of the report's dates is current. A later dated NB Power or ARC statement is needed to settle the target. KHNP to collaborate with Canadian firms on SMR deployment; ARC Clean Technology Advanced Small Modular Reactor - Commercial Demonstration Unit, Point Lepreau: New Brunswick Environmental Impact Assessment Registration D

Necsa SMR demonstration reactor at PelindabaSouth AfricaAnnouncedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
  • OperatorNecsa
Not recorded

Not found in the sources we checked. Necsa's 31 March 2026 announcement says the demonstration would produce power, process heat and isotopes, and Engineering News on 5 and 17 June 2026 reports that Necsa would keep Eskom informed so it can decide whether to adopt the technology. None of the sources read names a buyer of power, heat, hydrogen or isotopes from the Pelindaba demonstration, and Eskom is described as a possible future adopter, not a customer. Necsa seeks SMR partnership; Engineering News: Necsa to play a central role; Engineering News: Necsa expects to identify SMR partner within a year (17 June 2026)

Not found in the sources we checked. Necsa's 31 March and 17 April 2026 pages and Engineering News on 5 and 17 June 2026 describe an expression of interest that closed on 29 May 2026 as prequalification before a competitive bid, with a technology partner expected to be identified by about mid-2027. No partner is selected in those sources. The July 2026 Energize report of a non-binding Siemens Energy memorandum for the power island could not be read, because the page returns only a site template. Necsa seeks SMR partnership; Necsa: Necsa attracts global interest in small modular reactor programme (17 April 2026); Engineering News: Necsa expects to identify SMR partner within a year (17 June 2026); NEI: South Africa revives PBMR project; Energize: Siemens Energy eyes power-island role in Necsa SMRs (July 2026)

Not found in the sources we checked. Engineering News reported on 5 June 2026 that Necsa is pursuing a partner route to explore funding options and that its expression of interest offered to co-fund, for example by contributing equity rather than cash. No funder, amount or commitment is stated for the Pelindaba demonstration, and the 30 billion rand figure reported in November 2025 concerns commercialising the separate pebble-bed technology. Engineering News: Necsa to play a central role; NEI: South Africa revives PBMR project

Not found in the sources we checked. Engineering News on 5 June 2026 says the demonstration design is still open and that Necsa producing fuel would be an obvious step only if a high-temperature design were chosen, and its fuel-cycle and SAFARI-1 passages concern research reactors and future plants generally. No fuel supplier, quantity or delivery is stated for the Pelindaba demonstration. Engineering News: Necsa to play a central role; Engineering News: Necsa expects to identify SMR partner within a year (17 June 2026)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Necsa's 31 March 2026 call for partners cites the national plan's goal of demonstrating multi-purpose reactors by 2032, and Engineering News quoted Necsa's chief executive on 17 June 2026 saying the plan puts the demonstration reactor on line by 2032. Engineering News reported on 5 June 2026 that the plan was operation by 2036 at the latest, possibly sooner. Neither source says a target was moved, and the record's events hold no revision pair. Engineering News: Necsa to play a central role; Engineering News: Necsa expects to identify SMR partner within a year (17 June 2026)

newcleo / JAVYS LFR-AS-200 study at Bohunice V1SlovakiaSiting
  • Parent companyJAVYS
  • Parent companynewcleo
Not recorded
  • Vendor for the linked designnewcleo

Not found in the sources we checked. JAVYS's 4 June 2025 press release says the Slovak Republic would gain a stable long-term source of electricity and that the units would support the stability of the transmission system, but it names no utility, buyer, quantity or agreement for power from the Bohunice units. The ČEZ item on the site menu is a separate JAVYS project, not part of this release. JAVYS and newcleo sign major shareholder agreement

Not found in the sources we checked. JAVYS's 4 June 2025 press release says JAVYS and newcleo, the vendor, set up the CVP joint venture, with JAVYS holding 51% and managerial control, to prepare a 12-month feasibility study for one to four LFR-AS-200 units at the Bohunice V1 site. The release names no engineering firm, study author or construction contractor, and says Slovak companies could be involved later without naming any. JAVYS and newcleo sign major shareholder agreement

Source-backed project statement JAVYS's 4 June 2025 press release says the project's first phase, a 12-month feasibility study, is funded exclusively by newcleo. No amount is stated. Financing for later phases is left to the feasibility decision, and the Slovak Republic is not obliged to proceed if the study is negative. JAVYS and newcleo sign major shareholder agreement

Not found in the sources we checked. JAVYS's 4 June 2025 press release says the lead-cooled reactors would reuse and reprocess spent nuclear fuel, so Slovakia would depend less on fresh-fuel imports. That is the project's stated purpose. The release names no fuel fabricator, reprocessing arrangement, quantity or allocated spent-fuel inventory for the Bohunice units. JAVYS and newcleo sign major shareholder agreement

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. JAVYS's 4 June 2025 press release gives one timetable, a feasibility study over the next 12 months followed by a feasibility decision, and lists later phases without dates. No source read restates or moves that timetable. JAVYS and newcleo sign major shareholder agreement

newcleo LFR-AS-30 at Beaumont-en-Véron / Savigny-en-VéronFranceSiting
  • Project proposernewcleo
Not recorded
  • Vendor for the linked designnewcleo

Not found in the sources we checked. World Nuclear News reported on 14 February 2025 that newcleo's 30 MWe reactor would serve as an industrial demonstrator and technology showcase, and the February 2026 public-debate brochure says RTE would connect the projects to the grid. A grid connection is not a buyer, and neither source names a recipient of the reactor's electricity or heat. WNN: newcleo seeks to buy land for demonstration SMR; CNDP public debate brochure: newcleo LFR-AS-30

Not found in the sources we checked. World Nuclear News reported on 14 February 2025 that newcleo's siting would be accompanied by preliminary studies for administrative authorizations, without naming a study firm, and the February 2026 debate brochure says RTE would provide the grid connection. A grid connection by the transmission operator is not an engineering or construction appointment, and no contractor is named for the Véron reactor. WNN: newcleo seeks to buy land for demonstration SMR; CNDP public debate brochure: newcleo LFR-AS-30

Not found in the sources we checked. The February 2026 public-debate brochure gives a total investment of 3 billion euros for newcleo's two projects together, the Aube fuel plant and the Indre-et-Loire reactor, without a split, and says newcleo won a France 2030 innovative-reactor call without an amount. An investment estimate and a company-level award are not funding committed to the Véron reactor. CNDP public debate brochure: newcleo LFR-AS-30

Source-backed project statement newcleo's February 2026 public-debate brochure presents its planned MOX-LFR fuel plant in the Aube and the Véron reactor as linked steps of one fuel cycle, with the reactor's fuel to be made from existing recoverable nuclear material. This is a planned in-house fuel route, not a supply contract or delivery. Neither installation is authorized, and no quantity is stated. CNDP public debate brochure: newcleo LFR-AS-30

Not recorded

Comparable schedule revision not established. World Nuclear News reported on 14 February 2025 a target for newcleo's first French reactor to operate by the end of 2031. The February 2026 public-debate brochure gives 2032 and 2033 for two projects, with information fixed at 1 December 2025. The captured text does not assign either year to the Véron reactor. A project-specific comparable revision is therefore not established. WNN: newcleo seeks to buy land for demonstration SMR; CNDP public debate brochure: newcleo LFR-AS-30

Next Generation Nuclear Plant prototype HTGR at INL (2005-2013)Earlier-plan recordUnited StatesSuspendedNot recordedNot recorded

Not found in the sources we checked. The NRC's NGNP page says the prototype was meant to produce high-temperature process heat for hydrogen production and other energy-intensive industries while generating electricity, and 42 U.S.C. 16021 to 16025 set out the project, but neither names a buyer or user of its heat or power. DOE decided in 2011 not to proceed to detailed design and licensing. NRC: Next Generation Nuclear Plant past licensing activities

Not found in the sources we checked. 42 U.S.C. 16022 required Idaho National Laboratory to organize a consortium of industrial partners for cost-shared research, design and construction, and the NRC's NGNP page says DOE's 2011 decision not to proceed cited impasses with the NGNP Industry Alliance over cost sharing for that public-private partnership. No design, engineering or construction contractor was appointed for the prototype in these sources. 42 U.S.C. 16022(b)(3) (Energy Policy Act of 2005, section 642): prototype plant siting; NRC: Next Generation Nuclear Plant past licensing activities

Source-backed project statement 42 U.S.C. 16025 authorized appropriations to the Secretary of Energy of US$1.25 billion for fiscal years 2006 to 2015, and such sums as necessary for 2016 to 2021, for NGNP research and construction, with industrial partners' work to be cost-shared. That is a statutory authorization, not a record of appropriations or spending, and the NRC page says DOE stopped before detailed design in 2011 after cost-sharing talks with industry reached an impasse. 42 U.S.C. 16022(b)(3) (Energy Policy Act of 2005, section 642): prototype plant siting; NRC: Next Generation Nuclear Plant past licensing activities

Not found in the sources we checked. 42 U.S.C. 16023 lists nuclear fuel development, characterization and qualification as one of the NGNP Project's research elements, which is a development program, not a fuel supply. No fuel supplier, fabrication contract or delivery for a prototype at INL is stated, and nothing was built. 42 U.S.C. 16022(b)(3) (Energy Policy Act of 2005, section 642): prototype plant siting

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. 42 U.S.C. 16025 set targets of 30 September 2011 for the first project phase and 30 September 2021 to complete construction and begin operations, each with the option of reporting an alternative date to Congress. The NRC's page says DOE decided in 2011 not to proceed and prelicensing was suspended in 2013. No source read states a revised completion date, so no revision is shown. 42 U.S.C. 16022(b)(3) (Energy Policy Act of 2005, section 642): prototype plant siting; NRC: Next Generation Nuclear Plant past licensing activities

Nine Mile Point Gen III+ SMR early site permit evaluationUnited StatesAnnouncedNot recordedNot recorded

Not found in the sources we checked. Constellation's 15 January 2025 release describes an early site permit effort for one or more advanced reactors at Nine Mile Point and refers to statewide households and businesses, and DOE's 14 May 2026 award supports an early site permit for a New York location. Neither names a buyer of power from a new reactor. Constellation's Google and Amazon agreements listed on the same page concern other plants. Constellation: NY joins pursuit of DOE funding for advanced nuclear at Nine Mile Point; DOE: $94M awards to expedite Gen III+ SMR deployments (Constellation $17.264M)

Not found in the sources we checked. Constellation's 15 January 2025 release says NYSERDA joined its grant proposal to seek an early site permit at Nine Mile Point, which is a cost-share partnership, not a contractor role. Neither that release, POWER Magazine's 16 January 2025 report nor DOE's 14 May 2026 award names an engineering firm or reactor vendor for the project. Constellation's Rolls-Royce SMR interest concerns the Netherlands. Constellation: NY joins pursuit of DOE funding for advanced nuclear at Nine Mile Point; POWER: Constellation seeking permit for SMR at Nine Mile Point; Syracuse.com: DOE awards Constellation $17.3M for Nine Mile Point ESP

Source-backed project statement Constellation's January 2025 release says New York's energy research authority joined its proposal for Department of Energy support of an early site permit for one or more advanced reactors at Nine Mile Point, and calls that cost-share funding a first step, with no amount or payment stated. The Department of Energy's May 2026 award of 17,264,292 dollars to Constellation SMR Development, LLC is for an early site permit at a New York location and does not name Nine Mile Point. Constellation: NY joins pursuit of DOE funding for advanced nuclear at Nine Mile Point; DOE: $94M awards to expedite Gen III+ SMR deployments (Constellation $17.264M)

Not found in the sources we checked. Constellation's 15 January 2025 release names no fuel supplier for a new Nine Mile Point reactor, and the fuel-fabrication awards on DOE's 14 May 2026 page, to Framatome in Richland and Global Nuclear Fuel in Wilmington, do not name Nine Mile Point. Constellation: NY joins pursuit of DOE funding for advanced nuclear at Nine Mile Point; DOE: $94M awards to expedite Gen III+ SMR deployments (Constellation $17.264M)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Constellation's 15 January 2025 release, POWER Magazine's 16 January 2025 report and DOE's 14 May 2026 award give no construction or operation year for a new Nine Mile Point reactor. The early site permit's 10 to 20 year validity and DOE's reference to new generation in the 2030s are not project targets, so there is nothing to revise. Constellation: NY joins pursuit of DOE funding for advanced nuclear at Nine Mile Point; POWER: Constellation seeking permit for SMR at Nine Mile Point; DOE: $94M awards to expedite Gen III+ SMR deployments (Constellation $17.264M)

Ningdu multipurpose modular proposal (14th Five-Year plan)Earlier-plan recordChinaAnnouncedNot recordedReviewed 19 Oct 2026: not disclosed in the reviewed evidence.Not recordedNot recorded

Not found in the sources we checked. Ningdu County's 14th Five-Year Plan, generated 15 April 2021, calls for planning research on a Ningdu small-reactor project and lists six multipurpose modular reactors totalling 600,000 kW, but names no utility, heat user or other recipient of the output. Ningdu county plan naming multipurpose modular units

Not found in the sources we checked. Ningdu County's 14th Five-Year Plan, generated 15 April 2021, calls only for planning research on the small-reactor project and lists its configuration. It names no design institute, vendor, engineering firm or construction contractor. Ningdu county plan naming multipurpose modular units

Not found in the sources we checked. Ningdu County's 14th Five-Year Plan, generated 15 April 2021, lists the six-unit, 600,000 kW multipurpose modular reactor project without any cost, budget or funder. Other yuan figures in the plan concern county statistics or other projects. Ningdu county plan naming multipurpose modular units

Not found in the sources we checked. Ningdu County's 14th Five-Year Plan, generated 15 April 2021, describes the small-reactor project only as a planning study and a six-unit, 600,000 kW configuration. It does not mention fuel, a supplier or a delivery. Ningdu county plan naming multipurpose modular units

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Ningdu County's 14th Five-Year Plan, generated 15 April 2021, calls for planning research on the reactor project without any construction or operation date, and its 2035 horizon is the plan's own framing. No dated target exists in this source, so no schedule revision is shown. Ningdu county plan naming multipurpose modular units

Norilsk land small nuclear plant (RITM-400)RussiaAnnounced
  • Project proposerRosatom
Not recordedNot recorded

Not found in the sources we checked. Russia's December 2024 General Scheme says the Norilsk small nuclear plant will be confirmed only after agreements with consumers fixing volumes and prices, or another supply arrangement. Nornickel's 13 November 2023 release describes an agreement of intent with Rosatom to consider small plants to supply the Norilsk Industrial District, with Nornickel saying it will need more power beyond 2030. Neither source names a buyer or offtake agreement. Government of Russia order No. 4153-r: General Scheme for the placement of electric power facilities to 2042; Nornickel: Nornickel and Rosatom to look into nuclear power potential in Norilsk

Not found in the sources we checked. Nornickel's 13 November 2023 release says Nornickel and Rosatom signed an agreement of intent to evaluate options, identify a priority site, the plant's configuration and infrastructure, and an implementation model for a land-based small nuclear plant in the Norilsk Industrial District. That is a joint evaluation between the proposer and the prospective industrial user, not an engineering or construction appointment, and Russia's December 2024 General Scheme names no contractor. Nornickel: Nornickel and Rosatom to look into nuclear power potential in Norilsk

Not found in the sources we checked. Russia's General Scheme for power facilities to 2042, approved in December 2024, lists the Norilsk plant's capacity but says its implementation will be confirmed only after agreements with consumers fixing the volume and price of electricity, or another supply arrangement. Neither it nor Nornickel's 13 November 2023 release states a funder, investment amount or financing model, which the 2023 agreement left to be agreed. Government of Russia order No. 4153-r: General Scheme for the placement of electric power facilities to 2042; Nornickel: Nornickel and Rosatom to look into nuclear power potential in Norilsk

Not found in the sources we checked. Nornickel's 13 November 2023 release names the RITM-400 reactor as a possible priority option, and Russia's December 2024 General Scheme lists RITM-400 units, but neither names a fuel supplier, fabrication or delivery for the Norilsk plant. Nornickel: Nornickel and Rosatom to look into nuclear power potential in Norilsk

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Russia's General Scheme to 2042, approved in December 2024, gives one planned build-up for Norilsk, from one 80 MW RITM-400 unit in 2032 to four units from 2037, and Nornickel's 13 November 2023 release only says more power is needed beyond 2030. No earlier and later date for the same Norilsk milestone is stated. Nornickel: Nornickel and Rosatom to look into nuclear power potential in Norilsk

Norsk Kjernekraft SMR proposal in VardøNorwaySitingNot recordedNot recorded

Not found in the sources we checked. The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Vardø municipality: mayor's summary to the government nuclear committee (11 December 2024), hosted on regjeringen.no; Teknisk Ukeblad: melder inn nytt kjernekraftverk til regjeringen (Vardø); Norsk Kjernekraft: locations (ten project companies)

Not found in the sources we checked. The reviewed sources do not establish an additional project-specific engineering, preparatory-work or construction assignment. A supplier’s general capabilities or an industry-wide agreement do not establish a contract for this site. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Teknisk Ukeblad: melder inn nytt kjernekraftverk til regjeringen (Vardø); Norsk Kjernekraft: locations (ten project companies)

Not found in the sources we checked. The reviewed sources do not establish a project-specific financing commitment or amount. General company backing, ownership and policy support do not by themselves establish allocated or paid project funding. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft: locations (ten project companies); Teknisk Ukeblad: melder inn nytt kjernekraftverk til regjeringen (Vardø)

Not found in the sources we checked. The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Teknisk Ukeblad: melder inn nytt kjernekraftverk til regjeringen (Vardø)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Teknisk Ukeblad: melder inn nytt kjernekraftverk til regjeringen (Vardø); Øst-Finnmarkrådet and Vest-Finnmark Rådet joint statement on the Vardø nuclear assessment programme (22 November 2024); Vardø municipality: mayor's summary to the government nuclear committee (11 December 2024), hosted on regjeringen.no

Northern Halmahera floating nuclear power units (Rosatom, two FPU-100)IndonesiaAnnounced
  • Project proposerRosatom
Not recordedNot recordedNot recorded

No separate question review is recorded.

Not recorded

No separate question review is recorded.

Not recorded

No separate question review is recorded.

Not recordedNo project-specific fuel supply arrangement is recorded as a structured fact.

No separate question review is recorded.

Not recorded

No separate question review is recorded.

Nuclea Morpheus test reactor siting at the Utah San Rafael Energy LabUnited StatesAnnouncedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded
  • Vendor for the linked designNuclea Energy

Not found in the sources we checked. Utah News Dispatch reported on 6 August 2026 that Utah's Office of Energy Development and Nuclea signed an agreement to explore siting a Morpheus test reactor at the San Rafael Energy Lab, describing Morpheus as an option for clean electricity generation. The article names no buyer or user of the test reactor's power. Utah News Dispatch: compact transportable nuclear reactor agreement

Not found in the sources we checked. Utah News Dispatch reported on 6 August 2026 that Utah's Office of Energy Development signed a memorandum with Nuclea in early June to explore siting a Morpheus test reactor at the San Rafael Energy Lab, and that Utah will support the company as it engages with DOE and the NRC. That is a host-state siting and support agreement with the vendor, not a contractor appointment. No engineering, licensing or construction contractor is named. Utah News Dispatch: compact transportable nuclear reactor agreement

Not found in the sources we checked. Utah News Dispatch's 6 August 2026 article states no amount, funder or award for the Morpheus siting agreement. A linked headline about development costs belongs to a different article on earlier Utah agreements. Utah News Dispatch: compact transportable nuclear reactor agreement

Not found in the sources we checked. Utah News Dispatch's 6 August 2026 article describes Morpheus as a factory-built, transportable reactor and names no fuel type, supplier, quantity or delivery for the Orangeville test. The saved Nuclea home page contains only the company name. Utah News Dispatch: compact transportable nuclear reactor agreement; Nuclea Energy: Morpheus

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Utah News Dispatch's 6 August 2026 article dates the memorandum to early June and says factory-built modules could be installed in months, a duration. It gives no construction or operation date, so there is nothing to revise. Utah News Dispatch: compact transportable nuclear reactor agreement

Nuclear Power Ghana and Regnum NuScale VOYGR-12 plant (site not disclosed)GhanaAnnouncedNot recorded
  • Vendor for the linked designNuScale Power

Not found in the sources we checked. DOE's 29 August 2024 article says Nuclear Power Ghana, Ghana's plant owner and operator, and Regnum plan to form a subsidiary to own and operate the VOYGR-12 plant to deliver electricity, and the Ghana News Agency's 27 March 2025 report describes national grid and industrial-tariff benefits. Neither names a buyer, quantity or power purchase agreement. DOE: Nuclear Power Ghana and Regnum agree to deploy one VOYGR-12 plant; Ghana News Agency: NPG on vendors, 12 modules and no signed contract

Not found in the sources we checked. The Ghana News Agency reported on 27 March 2025 that NuScale and Regnum, in partnership with unnamed Japanese firms, would construct the SMRs, that Ghana had signed a framework agreement with the vendors and that no formal contract had been signed. Regnum is the recorded proposer and NuScale the vendor, so no separate engineering or construction contractor is named. Ghana News Agency: NPG on vendors, 12 modules and no signed contract

Not found in the sources we checked. The Ghana News Agency reported on 27 March 2025 that the SMRs would be financed through public-private partnerships, a financing model without a named funder or amount. DOE's more than US$579 million since 2014 supported NuScale's VOYGR design and licensing, not this plant. Ghana News Agency: NPG on vendors, 12 modules and no signed contract; DOE: Nuclear Power Ghana and Regnum agree to deploy one VOYGR-12 plant

Not found in the sources we checked. DOE's 29 August 2024 article and the Ghana News Agency's 27 March 2025 report describe the VOYGR-12 configuration and module ratings but name no fuel supplier, fabrication or delivery for the Ghana plant. DOE: Nuclear Power Ghana and Regnum agree to deploy one VOYGR-12 plant

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The Ghana News Agency's 27 March 2025 report gives the government's plan to add one gigawatt of nuclear power to the grid by 2034, a national target stated once, and DOE's 2024 article gives no plant date. No earlier and later date for the same VOYGR-12 milestone is stated. Ghana News Agency: NPG on vendors, 12 modules and no signed contract

NuCube test microreactor at the Utah San Rafael Energy LabUnited StatesAnnounced
  • Project proposerNuCube Energy
Not recorded
  • Vendor for the linked designNuCube Energy

Not found in the sources we checked. The Utah San Rafael Energy Lab's NuCube page and World Nuclear News of 12 June 2025 say the microreactor could generate electricity and high-temperature industrial heat for off-grid, rural or industrial users, but they name no buyer or user of output from the Orangeville test. Those are classes of use, and the lab is the test host. Utah San Rafael Energy Lab: NuCube Energy; WNN: Utah to host NuCube test reactor

Not found in the sources we checked. The lab's NuCube page and World Nuclear News of 12 June 2025 say the Utah San Rafael Energy Lab, operated by the Utah Office of Energy Development, signed a memorandum of understanding with NuCube Energy to site and test a NuCube microreactor in Orangeville, and that community-outreach discussions had begun. That is a site-host memorandum with the developer. No engineering or construction contractor is named, and no license or construction decision is shown. Utah San Rafael Energy Lab: NuCube Energy; WNN: Utah to host NuCube test reactor

Not found in the sources we checked. The lab's NuCube page and World Nuclear News of 12 June 2025 describe a siting and testing memorandum but state no funder, amount, application or award for the Orangeville NuCube test. The company's cost-competitiveness claim gives no figure. WNN: Utah to host NuCube test reactor; Utah San Rafael Energy Lab: NuCube Energy

Not found in the sources we checked. The lab's NuCube page and World Nuclear News of 12 June 2025 say the reactor uses TRISO fuel and heat pipes, which are design features. Neither names a fuel manufacturer, quantity or delivery for the Orangeville test, and the lab's molten-salt capability described in the article is not linked to NuCube. Utah San Rafael Energy Lab: NuCube Energy; WNN: Utah to host NuCube test reactor

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. World Nuclear News of 12 June 2025 and the lab's NuCube page report the siting memorandum but give no test or construction date for the NuCube unit. The article's one-year operation expectation concerns Valar Atomics' separate test reactor. With no dated NuCube target, no revision is shown. WNN: Utah to host NuCube test reactor; Utah San Rafael Energy Lab: NuCube Energy

NuScale plant proposal at Savannah River Site (2012)Earlier-plan recordUnited StatesAnnounced
  • Project proposerNuScale Power
Not recorded
  • Vendor named for this project (no design profile is linked)NuScale Power

Not found in the sources we checked. NuScale's 7 March 2012 release says a NuScale plant in South Carolina could provide clean energy and economic development at the Savannah River Site and the region, with modules added as customer demand grows. Those are general uses. Neither the release nor DOE's 2 March 2012 notice names a buyer of the plant's power. NuScale: memorandum of agreement with DOE Savannah River

Not found in the sources we checked. DOE's 2 March 2012 notice and NuScale's 7 March 2012 release describe a memorandum among DOE, the Savannah River Site, its national laboratory and NuScale as a framework for later land-use and site-services agreements and a first step toward potential deployment. That is a site-host agreement with the vendor, not a contractor appointment. The release's mention of Fluor engineers working on NuScale's technology is not an assignment to this plant. DOE: Energy Department announces small modular reactor technology partnerships at Savannah River; NuScale: memorandum of agreement with DOE Savannah River

Not found in the sources we checked. DOE's 2 March 2012 notice says the Savannah River memorandums do not constitute a federal funding commitment and that private funding is envisioned. NuScale's 7 March 2012 release says NuScale intended to compete for a separate DOE five-year SMR cost-share program, which is an intention to apply, not funding for this plant. No funder or amount is stated. NuScale: memorandum of agreement with DOE Savannah River; DOE: Energy Department announces small modular reactor technology partnerships at Savannah River

Not found in the sources we checked. NuScale's 7 March 2012 release describes refuelling one module without affecting the others, which is a design feature. Neither the release nor DOE's 2 March 2012 notice names a fuel supplier, allocation or delivery for a Savannah River NuScale plant. NuScale: memorandum of agreement with DOE Savannah River

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. DOE's 2 March 2012 notice and NuScale's 7 March 2012 release date the same memorandum and give no construction or operation date for a Savannah River NuScale plant. With no dated target there is nothing to revise. DOE: Energy Department announces small modular reactor technology partnerships at Savannah River; NuScale: memorandum of agreement with DOE Savannah River

NuScale VOYGR Doicești (Romania)RomaniaLicensingNot recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.
  • Vendor for the linked designNuScale Power

Not found in the sources we checked. Nuclearelectrica's 12 February 2026 investment-decision release and 21 May 2026 clarifications describe Doicești financing, licensing steps and a price per megawatt-hour, and its 28 July 2026 statement addresses the schedule and the site. None names a buyer, offtake agreement or contract for difference for the plant's electricity. The February release describes 462 MW replacing the former thermal plant, which is a purpose, not a named customer. Nuclearelectrica: Doicești SMR project obtains the final investment decision; Nuclearelectrica: Clarifications regarding the development of the Doicești SMR project

Source-backed project statement World Nuclear News reported on 2 October 2024 that Nuclearelectrica and RoPower Nuclear signed the FEED Phase 2 contract with Fluor in July 2024 for design and engineering services at Doicești. Nuclearelectrica's 12 February 2026 release still lists Pre-EPC contract negotiations and identification of contractors as work ahead of execution. The Fluor contract is front-end engineering, not a construction or EPC award. World Nuclear News: US Exim Bank approves loan for Romanian SMR project; Nuclearelectrica: Doicești SMR project obtains the final investment decision

Source-backed project statement Nuclearelectrica said on 21 May 2026 that it contributed 4 million euros to RoPower's share capital, matching Nova Power & Gas, and that shareholders raised its loan ceiling to RoPower to 243 million dollars, drawable only if other financing is not secured. World Nuclear News reported on 2 October 2024 that the US Export-Import Bank board approved a final commitment for a 98 million dollar loan for pre-project services. Amounts drawn are not stated, so these are an equity contribution, an approved ceiling and a loan commitment, not recorded disbursements. Nuclearelectrica: Clarifications regarding the development of the Doicești SMR project; World Nuclear News: US Exim Bank approves loan for Romanian SMR project

Not found in the sources we checked. Nuclearelectrica's 12 February 2026 and 21 May 2026 releases and World Nuclear News's 2 October 2024 financing report describe Doicești engineering, financing and investment-decision conditions. None names a fuel supplier, fabrication contract or delivery for the six-module plant. Nuclearelectrica: Clarifications regarding the development of the Doicești SMR project; Nuclearelectrica: Doicești SMR project obtains the final investment decision; World Nuclear News: US Exim Bank approves loan for Romanian SMR project

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Source-backed project statement Nuclearelectrica's September 2022 strategy note placed the Doicești commercial-operation stage in 2029–2030, starting with energy sales from module 1. Its later final-investment-decision submission note gives July 2033 for the first NuScale Power Module and December 2034 for the whole plant, dependent on the remaining modules' commercial agreements. The later note has no filled-in issue date: January 2026 is suggested by its file location and metadata, not stated on the document. It describes alternative conditional procurement arrangements, not a simple reduction to one module. These documents support a partial first-module schedule history, not a precise delay calculation or confirmation that either forecast remains current. The English translations defer to the Romanian originals. Nuclearelectrica: Statement regarding the summary of the report of the Control Body of the Prime Minister of Romania; Nuclearelectrica: Doicești SMR project obtains the final investment decision; World Nuclear News: US Exim Bank approves loan for Romanian SMR project; Nuclearelectrica: SMR strategy note; Nuclearelectrica: SMR final-investment-decision submission note

Oklo Aurora at Eielson AFB (DAF microreactor pilot)United StatesSitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
  • OperatorOklo Inc.
  • Vendor for the linked designOklo Inc.

Source-backed project statement Oklo said on 11 June 2025 that DLA Energy, on behalf of the Department of the Air Force, issued a Notice of Intent to Award for an Aurora powerhouse at Eielson Air Force Base, with electricity and heat to be delivered under a long-term power purchase agreement. The release calls that agreement anticipated, so it is not an executed offtake. Oklo’s Alaska page says operation would follow Nuclear Regulatory Commission licensing and other federal approvals. The Air Force is the prospective power and heat customer in that notice; its separate role as site host is not itself the offtake. Oklo: Selected as intended awardee for Eielson AFB; Oklo: Alaska Aurora-Eielson powerhouse

Not found in the sources we checked. Oklo's 11 June 2025 release says that under the anticipated agreement from DLA Energy's Notice of Intent to Award, Oklo itself would design, construct, own and operate the Eielson plant. Oklo is the vendor and intended operator, so this is not a separate contractor appointment. Neither the release nor Oklo's Alaska page names an engineering or construction contractor. Oklo: Selected as intended awardee for Eielson AFB

Not found in the sources we checked. Oklo's 11 June 2025 release says DLA Energy issued a Notice of Intent to Award for an Aurora plant at Eielson that Oklo would own, delivering power under a long-term power purchase agreement. A purchase agreement is an offtake arrangement, not project financing, and neither the release nor Oklo's Alaska page states a funder, amount or financing for the plant. Oklo: Selected as intended awardee for Eielson AFB

Not found in the sources we checked. Oklo's Alaska page describes expected output and remote-logistics benefits, and its company description mentions fuel material awarded from Idaho National Laboratory without tying it to Eielson. Neither source names a fuel supplier, allocation or delivery for the Eielson Aurora plant. Oklo: Alaska Aurora-Eielson powerhouse

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Oklo's Alaska page says site characterization is under way, borehole drilling is to begin in late 2026 and operations are targeted for the early 2030s after NRC licensing. Oklo's 11 June 2025 release gives no operation date. Each target appears once, so there is no revision. Oklo: Alaska Aurora-Eielson powerhouse

Oklo Aurora campus, Pike County, OhioUnited StatesSiting
  • Project proposerOklo Inc.
  • OperatorOklo Inc.
  • Vendor for the linked designOklo Inc.
  • Prospective customer / offtaker (binding offtake not established)Meta Platforms

Source-backed project statement Oklo's Ohio project page, rechecked 15 October 2026, says Oklo and Meta are partnering on a 1.2 GW campus in southern Ohio to support Meta's data centers, with Meta prepaying for power and providing early funding. Oklo's powerhouses would sell into the PJM market and Meta would pay Oklo for that power through an anticipated long-term power purchase agreement. The agreement is not stated as signed. Oklo Ohio clean energy campus

Not found in the sources we checked. Oklo's Ohio project page says Oklo plans to work with regional partners to prioritize Ohio-based contractors, trades and suppliers, without naming any, and Oklo's 1 February 2024 release names the Southern Ohio Diversification Initiative as the land-option counterparty. Neither names an engineering, early-works or construction contractor for the Pike County campus. Oklo Ohio clean energy campus; Oklo SODI land-rights agreement

Source-backed project statement Oklo's Ohio project page says its agreement with Meta provides a mechanism for Meta to prepay for power and provide early-stage funding for the Pike County Aurora deployment, and that the facilities are financed through private investment and commercial arrangements including customer commitments. This is a customer prepayment and early-funding mechanism with no amount stated and no disbursement reported. The page's multi-billion-dollar figure is a potential scale, not committed money. Oklo Ohio clean energy campus

Source-backed project statement Oklo and Centrus's joint release of 12 November 2026 (published on Centrus's site) says Oklo signed multiple definitive, multi-year contracts with Centrus for HALEU, with Oklo prepaying for future deliveries to support construction of new Centrus enrichment capacity; the purchase is supported by Meta's prepayment for power and secures fuel for the first phase of Oklo's planned 1.2 GW Ohio campus. The contracts include enough HALEU for up to five Aurora powerhouses for multiple years, a figure the release gives for the contracts as a whole, which it says also cover future Aurora projects and later refuelling of Aurora-INL, so how many of the five are for Ohio is not stated. Deliveries from Centrus's American Centrifuge Plant in Pike County are scheduled to begin in 2029. The contracts formalize a June 2026 letter of intent. The release gives no tonnage, price or contract value, and does not say fuel has been delivered or that a license for the Ohio campus has been applied for. Oklo and Centrus: definitive HALEU supply contracts, including fuel for the Ohio Aurora campus (joint release, 12 November 2026)

Not recorded

Comparable schedule revision not established. Oklo's Ohio project page gives one schedule for the Pike County campus: pre-construction in 2027, general construction in late 2028 or early 2029, first phase operating in 2030 and full 1.2 GW by 2034. Oklo's 1 February 2024 land-rights release gives no construction or operation date. With one set of targets there is no dated revision. Oklo Ohio clean energy campus

Oklo Aurora power for Diamondback Energy near Midland, Texas (2024 LOI)United StatesAnnounced
  • Project proposerOklo Inc.
  • Intended operatorOklo Inc.
  • Intended licensed ownerOklo Inc.
  • Vendor for the linked designOklo Inc.
  • Prospective customer / offtaker (binding offtake not established)Diamondback E&P LLC

Source-backed project statement Oklo's 8 April 2024 release says Oklo and Diamondback Energy signed a non-binding letter of intent toward a 20-year power purchase agreement for 50 MW from Aurora powerhouses to power Diamondback's Permian Basin operations. A letter of intent is not an executed power purchase agreement, and no later step is recorded. Oklo signs LOI to supply 50 MW to Diamondback Energy

Not found in the sources we checked. Oklo's 8 April 2024 announcement of its non-binding letter of intent with Diamondback Energy says Oklo itself intends to license, build and operate Aurora powerhouses supplying 50 MW to Diamondback E&P near Midland, Texas. No separate engineering, licensing or construction contractor is named. Oklo signs LOI to supply 50 MW to Diamondback Energy

Not found in the sources we checked. Oklo's 8 April 2024 announcement states no price, capital amount or financing for the Diamondback powerhouses. It says Oklo's design-build-own-operate model should let customers like Diamondback buy power without capital requirements, which describes the business model rather than a funding commitment for this supply. Oklo signs LOI to supply 50 MW to Diamondback Energy

Not found in the sources we checked. Oklo's 8 April 2024 announcement says the company was awarded fuel material from Idaho National Laboratory and is developing fuel recycling, but those company statements do not mention Diamondback or Midland. No fuel allocation, supplier or delivery is stated for these powerhouses. Oklo signs LOI to supply 50 MW to Diamondback Energy

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Oklo's 8 April 2024 announcement gives a 20-year proposed power purchase term with a 20-year renewal option and a 40-year design life, which are durations, not milestone dates. It states no construction or operation date for the Midland powerhouses, so no revision is shown. Oklo signs LOI to supply 50 MW to Diamondback Energy

Oklo Aurora-INLUnited StatesConstruction
  • Project proposerOklo Inc.
  • OperatorOklo Inc.
  • Vendor for the linked designOklo Inc.

Not found in the sources we checked. Oklo's Idaho page says Aurora-INL supports Oklo's first planned commercial operations, with construction begun in 2025 and commercial deployment targeted for 2028. It names no buyer or power purchase agreement for Aurora-INL's output, and the Kiewit and groundbreaking releases name none either. Oklo: Idaho Aurora-INL powerhouse

Source-backed project statement Kiewit's 15 July 2025 release says Oklo selected Kiewit Nuclear Solutions as lead constructor for Aurora-INL under a newly executed master services agreement to support design, procurement and construction, and Oklo's 22 September 2025 groundbreaking release restates that role. The contract value is not disclosed. DOE's December 2025 categorical exclusion covers only non-nuclear site and support construction, so reactor construction is not shown. Kiewit: Oklo selects Kiewit as the lead constructor for first Aurora powerhouse in Idaho; Oklo breaks ground on first Aurora powerhouse

Source-backed project statement Oklo's second-quarter 2024 shareholder letter says Oklo will fund the first Aurora powerhouses, starting with its first plant in Idaho. That is a company statement of self-funding with no amount, and no outside funder or financing for Aurora-INL is named in the sources read. Oklo second-quarter 2024 shareholder letter

Source-backed project statement Oklo's 22 September 2025 groundbreaking release says DOE awarded Oklo fuel recovered from EBR-II in 2019 and that Oklo had completed two of four steps toward DOE authorization to fabricate the initial core at its Aurora Fuel Fabrication Facility at INL. Oklo's Idaho page says that facility is under construction. This is an awarded fuel allocation with fabrication still pending authorization. No core has been fabricated or delivered. Oklo breaks ground on first Aurora powerhouse; Oklo: Idaho Aurora-INL powerhouse

Source-backed project statement Oklo's report on Form 10-Q for the quarter ended 30 June 2026 (signed 7 August 2026) states an ambitious target of deploying its first powerhouse in 2028. The corresponding Plan of Operations passage in its report for the quarter ended 30 September 2026 (signed 6 November 2026) states 2028-2029. Both reports expect the construction of the first powerhouse at INL, and the passages cited give no reason for the change. Oklo's undated Idaho page, read on 7 October and again on 11 November 2026, targets commercial deployment in 2028; the reports' word 'deploying' is not defined as commercial operation. Earlier statements (a 2027 aim in Oklo's August 2024 shareholder letter, Kiewit's late 2027 to early 2028 in July 2025) used different milestone terms. These are company targets, not a DOE schedule or authorization, and no deployment is recorded as achieved. Oklo quarterly report (Form 10-Q) for the quarter ended 30 June 2026 (investor-relations copy); Oklo quarterly report (Form 10-Q) for the quarter ended 30 September 2026 (investor-relations copy); Oklo: Idaho Aurora-INL powerhouse; Oklo second-quarter 2024 shareholder letter; Kiewit: Oklo selects Kiewit as the lead constructor for first Aurora powerhouse in Idaho

OSGE Dąbrowa Górnicza BWRX-300 proposalPolandSitingNot recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.

Not found in the sources we checked. The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE six decisions in principle; OSGE: first locations presented; OSGE CfD application three sites

Not found in the sources we checked. The reviewed sources do not establish an additional project-specific engineering, preparatory-work or construction assignment. A supplier’s general capabilities or an industry-wide agreement do not establish a contract for this site. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE six decisions in principle; OSGE news index reviewed 21 October 2026; OSGE: first locations presented

Not found in the sources we checked. The reviewed sources do not establish a project-specific financing commitment or amount. General company backing, ownership and policy support do not by themselves establish allocated or paid project funding. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE CfD application three sites; OSGE six decisions in principle; OSGE: first locations presented; OSGE news index reviewed 21 October 2026

Not found in the sources we checked. The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE: Orano regional SMR deployment framework; OSGE six decisions in principle

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE six decisions in principle; OSGE CfD application three sites; OSGE: first locations presented; OSGE: Orano regional SMR deployment framework

OSGE Kraków / Nowa Huta BWRX-300 proposalPolandSitingNot recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.

Not found in the sources we checked. The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE six decisions in principle; OSGE: first locations presented; OSGE CfD application three sites

Not found in the sources we checked. The reviewed sources do not establish an additional project-specific engineering, preparatory-work or construction assignment. A supplier’s general capabilities or an industry-wide agreement do not establish a contract for this site. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE six decisions in principle; OSGE news index reviewed 21 October 2026; OSGE: first locations presented

Not found in the sources we checked. The reviewed sources do not establish a project-specific financing commitment or amount. General company backing, ownership and policy support do not by themselves establish allocated or paid project funding. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE CfD application three sites; OSGE six decisions in principle; OSGE: first locations presented; OSGE news index reviewed 21 October 2026

Not found in the sources we checked. The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE: Orano regional SMR deployment framework; OSGE six decisions in principle

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE six decisions in principle; OSGE CfD application three sites; OSGE: first locations presented; OSGE: Orano regional SMR deployment framework

OSGE Ostrołęka BWRX-300 proposalPolandSitingNot recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.

Not found in the sources we checked. The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE six decisions in principle; OSGE: first locations presented; OSGE CfD application three sites

Not found in the sources we checked. The reviewed sources do not establish an additional project-specific engineering, preparatory-work or construction assignment. A supplier’s general capabilities or an industry-wide agreement do not establish a contract for this site. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE six decisions in principle; OSGE news index reviewed 21 October 2026; OSGE: first locations presented

Not found in the sources we checked. The reviewed sources do not establish a project-specific financing commitment or amount. General company backing, ownership and policy support do not by themselves establish allocated or paid project funding. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE CfD application three sites; OSGE six decisions in principle; OSGE: first locations presented; OSGE news index reviewed 21 October 2026

Not found in the sources we checked. The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE: Orano regional SMR deployment framework; OSGE six decisions in principle

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE six decisions in principle; OSGE CfD application three sites; OSGE: first locations presented; OSGE: Orano regional SMR deployment framework

OSGE Stalowa Wola BWRX-300PolandSitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.

Not found in the sources we checked. The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE: ARP and OSGE letter of intent for Stalowa Wola; OSGE CfD application three sites; OSGE six decisions in principle

Not found in the sources we checked. The reviewed sources do not establish an additional project-specific engineering, preparatory-work or construction assignment. A supplier’s general capabilities or an industry-wide agreement do not establish a contract for this site. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE: ARP and OSGE letter of intent for Stalowa Wola; OSGE CfD application three sites; OSGE applies for the EU's first contract for difference for SMRs; OSGE news index reviewed 21 October 2026; OSGE six decisions in principle

Source-backed project statement The project is included in OSGE’s three-location contract-for-difference application. On 16 April 2026, ARP, OSGE and the project company signed a letter of intent concerning possible ARP investment. An investment decision remained conditional on agreeing transaction terms; the announcement states no committed amount or disbursement. OSGE: ARP and OSGE letter of intent for Stalowa Wola; OSGE CfD application three sites; OSGE applies for the EU's first contract for difference for SMRs; OSGE news index reviewed 21 October 2026

Not found in the sources we checked. The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE: Orano regional SMR deployment framework; OSGE: ARP and OSGE letter of intent for Stalowa Wola; OSGE six decisions in principle

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE: ARP and OSGE letter of intent for Stalowa Wola; OSGE CfD application three sites; OSGE applies for the EU's first contract for difference for SMRs; OSGE: first locations presented

OSGE Stawy Monowskie BWRX-300PolandSitingNot recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.

Not found in the sources we checked. The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE CfD application three sites; OSGE applies for the EU's first contract for difference for SMRs; OSGE six decisions in principle; OSGE: first locations presented

Not found in the sources we checked. The reviewed sources do not establish an additional project-specific engineering, preparatory-work or construction assignment. A supplier’s general capabilities or an industry-wide agreement do not establish a contract for this site. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE CfD application three sites; OSGE six decisions in principle; OSGE news index reviewed 21 October 2026

Source-backed project statement OSGE reports a contract-for-difference application covering three locations, including Stawy Monowskie. The reviewed announcement does not establish an awarded contract, per-site allocation or payment. OSGE CfD application three sites; OSGE applies for the EU's first contract for difference for SMRs; OSGE news index reviewed 21 October 2026

Not found in the sources we checked. The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE: Orano regional SMR deployment framework; OSGE CfD application three sites; OSGE six decisions in principle

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE CfD application three sites; OSGE: first locations presented; OSGE six decisions in principle; OSGE: Orano regional SMR deployment framework

OSGE Warsaw potential BWRX-300 location (2023 list)PolandAnnouncedNot recorded

Not found in the sources we checked. ORLEN Synthos Green Energy's 17 April 2023 page lists Warsaw among seven potential BWRX-300 locations and says these include energy-intensive plants and places suited to district heating, but it names no plant, heat network or buyer in Warsaw. The Warsaw street address printed on the page is the company's office. OSGE: first locations presented

Not found in the sources we checked. ORLEN Synthos Green Energy's 17 April 2023 page says the company, which holds exclusive Polish rights to the BWRX-300, would analyze seven potential locations including Warsaw over two years, and that dozens of Polish firms would join the supply chain. It names no engineering, study or construction contractor for Warsaw. OSGE: first locations presented

Not found in the sources we checked. ORLEN Synthos Green Energy's 17 April 2023 page says power from a small unit would ultimately cost far less than gas and that about half the spending on the first SMR would stay in Poland, but states no amount, funder or financing for a Warsaw reactor. OSGE: first locations presented

Not found in the sources we checked. ORLEN Synthos Green Energy's 17 April 2023 page describes the BWRX-300's output and 60-year life but names no fuel type, supplier, quantity or delivery for Warsaw or any of the seven listed locations. OSGE: first locations presented

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. ORLEN Synthos Green Energy's 17 April 2023 page aims to build at least one BWRX-300 in Poland by 2030, without naming Warsaw, and says the seven locations would be analyzed over the next two years. No construction or operation date is given for Warsaw, so no revision is shown. OSGE: first locations presented

OSGE Wloclawek BWRX-300PolandSitingNot recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.

Source-backed project statement The GDOŚ scoping decision of 28 January 2025 identifies Anwil S.A.'s industrial plant as an intended recipient of part of the proposed plant's electricity. This establishes planned use, not an executed offtake contract, contractual quantity or price; no heat purchaser is identified. Postanowienie GDOŚ DOOŚ-WDŚI.420.47.2023.SP.36 (zakres raportu, BWRX-300 Włocławek)

Not found in the sources we checked. The reviewed sources do not establish an additional project-specific engineering, preparatory-work or construction assignment. A supplier’s general capabilities or an industry-wide agreement do not establish a contract for this site. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Wloclawek and OSGE cooperation agreement; OSGE: Włocławek and OSGE sign cooperation agreement; OSGE news index reviewed 21 October 2026; OSGE six decisions in principle; OSGE: ARP and OSGE letter of intent for Stalowa Wola

Source-backed project statement OSGE reports a contract-for-difference application covering Włocławek, Stawy Monowskie and Stalowa Wola. An application is not an awarded contract, per-site allocation or payment. OSGE's 22 October 2026 release says each project stage will have its own schedule, budget and scope, with financing of later stages tied to delivery of earlier assumptions. No amount or commitment is stated. OSGE CfD application three sites; OSGE applies for the EU's first contract for difference for SMRs; OSGE news index reviewed 21 October 2026; Wloclawek and OSGE cooperation agreement

Not found in the sources we checked. The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. OSGE: Orano regional SMR deployment framework; Wloclawek and OSGE cooperation agreement; OSGE CfD application three sites; OSGE six decisions in principle

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Source-backed project statement OSGE's 29 June 2026 release assumed the first BWRX-300 unit would be commissioned at Włocławek in 2032. Its 22 October 2026 release says the first unit at Włocławek is to be commissioned in the mid-2030s (the same Polish verb, uruchomienie/uruchomiony, in both). Both are OSGE statements about the same milestone, and neither is a permit date. OSGE's 29 September 2026 release said the first BWRX-300 in Poland may start in 2032 without naming a site. OSGE applies for the EU's first contract for difference for SMRs; Orlen, SGE i OSGE zawarły Porozumienie Parasolowe dotyczące współpracy przy programie SMR BWRX-300; OSGE: BWRX-300 z pozwoleniem na budowę w USA

Otrera precursor (first demonstration) reactor at CEA MarcouleFranceAnnouncedNot recordedNot recorded

Not found in the sources we checked. CEA's Otrera start-up page says each Otrera reactor could cogenerate 110 MWe and 180 MWth for factories and towns through local energy loops. That is the general business model. Neither that page, Sfen's 14 April 2026 article nor TV Sud's 4 September 2026 report names a recipient of heat or power from a Marcoule precursor. CEA: Otrera, réacteur à neutrons rapides refroidi au sodium

Not found in the sources we checked. CEA's start-up page says Otrera signed a France 2030 collaboration contract with CEA, which licensed it five patents, and Sfen's 14 April 2026 article says Otrera envisages the CEA Marcoule site for its first demonstration unit. The CEA collaboration is company-level technology licensing, and CEA's possible role as host is not confirmed. No engineering or construction contractor is named for a Marcoule precursor. CEA: Otrera, réacteur à neutrons rapides refroidi au sodium; Sfen RGN: Otrera et Hexana s'installent dans les territoires historiques du nucléaire

Not found in the sources we checked. TV Sud reported on 4 September 2026 that Otrera presented an ambition to build a precursor at Marcoule by 2032-2035 with an investment of about 1.5 billion euros mentioned, and that EDF joined Otrera's capital in 2026. The figure is an estimate and EDF's stake is company equity. No funder or instrument for the Marcoule precursor is stated. TV Sud Magazine: Hexana, Otrera, MGH Energy, plusieurs milliards d'euros de projets autour de Marcoule

Not found in the sources we checked. CEA's Otrera start-up page says Otrera's reactors would reuse spent fuel assemblies now stored in pools and can also use HALEU, running ten years without refuelling. That is a design and business description. No fuel supplier, quantity or delivery is named for a Marcoule precursor. CEA: Otrera, réacteur à neutrons rapides refroidi au sodium

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Sfen reported on 14 April 2026 that Otrera's first demonstration unit should come in 2032, and CEA's start-up page gives 2032 for a first industrial demonstrator. TV Sud on 4 September 2026 reported an ambition for a Marcoule precursor by 2032-2035. The later horizon still includes 2032 and no source says the date was moved, so this is not a recorded revision. Sfen RGN: Otrera et Hexana s'installent dans les territoires historiques du nucléaire; TV Sud Magazine: Hexana, Otrera, MGH Energy, plusieurs milliards d'euros de projets autour de Marcoule

Øygarden / Alver SMR proposalNorwaySitingNot recorded

Not found in the sources we checked. The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft Øygarden assessment; Norsk Kjernekraft: locations (ten project companies)

Source-backed project statement The reviewed release describes Rolls-Royce assessment and cooperation, alongside Blykalla’s separately reported industrial relationship. Neither establishes a selected vendor or EPC award. The Aker/Rolls-Royce test program on Norway’s west coast is not an Øygarden construction contract. Norsk Kjernekraft Øygarden assessment; Norsk Kjernekraft: locations (ten project companies)

Not found in the sources we checked. The reviewed sources do not establish a project-specific financing commitment or amount. General company backing, ownership and policy support do not by themselves establish allocated or paid project funding. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft Øygarden assessment

Not found in the sources we checked. The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft Øygarden assessment

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft Øygarden assessment

PBMR demonstration power plant at Koeberg (terminated)South AfricaCanceled
  • Project proposerEskom
  • OperatorEskom
  • Vendor for the linked designPBMR (Pty) Ltd

Source-backed project statement Nuclear Engineering International's 18 November 2025 history says Eskom committed to purchase the PBMR demonstration reactor and to operate it, with the test reactor to be built at Koeberg. Eskom, the planned operator, was therefore the committed buyer of the plant. No separate electricity or process-heat buyer is named, and the project was terminated in 2010. NEI: South Africa revives PBMR project

Not found in the sources we checked. World Nuclear News' 30 January 2007 report describes Eskom's application to build the PBMR at Koeberg, and Nuclear Engineering International's 18 November 2025 history says many domestic and foreign subcontractors became involved in the program without naming a Koeberg construction firm. Eskom was the operator and PBMR (Pty) Ltd the vendor. No construction contractor for the demonstration is named, and the project was terminated in 2010. WNN: Appeals rejected against PBMR fuel plant; NEI: South Africa revives PBMR project; South Africa national report, 7th CNS review meeting

Not found in the sources we checked. Nuclear Engineering International's 18 November 2025 history says the South African government ceased funding PBMR in 2010 and that ZAR 10 billion had been spent on developing the technology, with a further ZAR 30 billion estimated to commercialise it. Those figures concern the PBMR program as a whole. No source read states a funder, instrument or amount for the Koeberg demonstration itself. NEI: South Africa revives PBMR project

Source-backed project statement World Nuclear News reported on 30 January 2007 that fuel for Eskom's planned PBMR at Koeberg would be manufactured by Necsa at a pilot plant in its BEVA complex at Pelindaba, with raw material from Durban and finished fuel taken to Koeberg. This was a planned fuel arrangement for a project terminated in 2010. No quantity or delivery is reported, and the minister treated the fuel plant and the reactor as separate approvals. WNN: Appeals rejected against PBMR fuel plant

Not recorded

Comparable schedule revision not established. World Nuclear News' 30 January 2007 report dates a fuel-plant decision and gives no Koeberg construction date, and South Africa's August 2016 nuclear safety report says the PBMR project was terminated in 2010 after its license application was withdrawn. No earlier and later targets for the same Koeberg milestone appear in the sources read. The 2025 Pelindaba demonstration is a separate record. WNN: Appeals rejected against PBMR fuel plant; South Africa national report, 7th CNS review meeting; NEI: South Africa revives PBMR project

Penn State FRONTIER eVinci research proposalUnited StatesAnnouncedNot recorded

Source-backed project statement Penn State's 4 March 2025 article says the eVinci planned for the FRONTIER research facility offers a way of powering the university's own research facilities and buildings across the University Park campus. That is an intended use by the host itself, stated as a capability, with no quantity, terms or third-party buyer. Penn State University deployment announcement

Not found in the sources we checked. Penn State's 4 March 2025 article says the university submitted a letter of intent to the NRC on 28 February 2025 as the first step towards installing a Westinghouse eVinci, continuing a research collaboration with Westinghouse, the vendor, begun in 2022. No engineering, licensing or construction contractor is named, and the facility location is still to be determined. Penn State University deployment announcement

Not found in the sources we checked. Penn State's 4 March 2025 article states no grant, appropriation, cost share, loan or other amount for the FRONTIER eVinci facility, and the Westinghouse research collaboration it mentions is not described as funding. Penn State University deployment announcement

Not found in the sources we checked. Penn State's 4 March 2025 article says the eVinci can provide power for more than eight years without refuelling, which is a design statement. It names no fuel supplier, fabrication or delivery for the FRONTIER facility. Penn State University deployment announcement

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Penn State's 4 March 2025 article dates only the 28 February 2025 letter of intent to the NRC and says the university will keep engaging the regulator and determine possible locations. It gives no construction or operation target, so no schedule revision is shown. Penn State University deployment announcement

Project Pele (INL microreactor demonstration)United StatesConstructionNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
  • Vendor for the linked designBWX Technologies

Source-backed project statement The Energy Department's 23 May 2026 article says Project Pele is a mobile microreactor prototype designed to provide resilient power for military operations, led by DoW's Strategic Capabilities Office in partnership with BWXT, DOE, and INL. BWXT's program page says that once complete the reactor will deliver baseload power for the Department of War's mission-critical efforts. The record of decision signed 5 April 2022 says the prototype must be tested against DoD specifications, and it describes a demonstration of power for a grid separate from the public utility grid. Those pages name a demonstration purpose and a laboratory host, not an electricity buyer, a price, or a binding offtake. DOE: One Year After Executive Orders, U.S. Nuclear Energy Renaissance Is in Full Swing; BWXT Project Pele page; Record of Decision for the Final Construction and Demonstration of a Prototype Mobile Microreactor Environmental Impact Statement; DOE Project Pele groundbreaking article

Source-backed project statement BWXT's program page states a June 2022 award from the Strategic Capabilities Office to build and deliver the Pele prototype and names BWXT as the lead contractor, with design and manufacture at its campus in Lynchburg, Virginia. The Energy Department's 24 September 2024 article says the reactor will be manufactured by BWX Technologies. The record of decision signed 5 April 2022 says the final design was still a competitive down-select between two designs, so that environmental decision is not the manufacturing award. BWXT's award is to build and deliver a prototype that its page still places before shipment and loading, not a contract to operate it. BWXT Project Pele page; DOE Project Pele groundbreaking article; Record of Decision for the Final Construction and Demonstration of a Prototype Mobile Microreactor Environmental Impact Statement

Not found in the sources we checked. The record of decision signed 5 April 2022 says implementation of the proposed demonstration is subject to the availability of appropriations, and it says cost and schedule were considered without stating an amount. BWXT's program page states a June 2022 contract award to build and deliver the prototype and states no price or payment. The Energy Department articles of 24 September 2024 and 23 May 2026 and the Army article of 3 December 2025 also do not state a Project Pele disbursement. Sums elsewhere on the 23 May 2026 page are outside the Project Pele paragraph and are not treated as Pele funding. Record of Decision for the Final Construction and Demonstration of a Prototype Mobile Microreactor Environmental Impact Statement; BWXT Project Pele page; DOE Project Pele groundbreaking article; DOE: One Year After Executive Orders, U.S. Nuclear Energy Renaissance Is in Full Swing; Army article on the first TRISO fuel delivery for Project Pele

  • Fuel supplier named for this projectBWX Technologies

Source-backed project statement BWXT's program page says TRISO fuel production for the initial core was completed in November 2025, and the Energy Department's 23 May 2026 article says the fuel was delivered to Idaho National Laboratory in November 2025; the Army's article of 3 December 2025 reports the first delivery that week. BWXT says loading is still ahead of the demonstration tests. The 2022 record of decision proposed fuel made from downblended highly enriched uranium and fabricated in Lynchburg. DOE: One Year After Executive Orders, U.S. Nuclear Energy Renaissance Is in Full Swing; Army article on the first TRISO fuel delivery for Project Pele; BWXT Project Pele page; Record of Decision for the Final Construction and Demonstration of a Prototype Mobile Microreactor Environmental Impact Statement

Not recorded

Comparable schedule revision not established. The Energy Department's 24 September 2024 article says the project could operate as early as 2026 and that placement during the 2026 timeframe was planned for safety reviews and initial testing. BWXT's program page, which states no article date, lists September 2026 core barrel cartridge installation as complete and gives no date for shipment, loading, or demonstration tests. The record of decision signed 5 April 2022 says schedule was considered and states no operation date. The pages reviewed do not contain two dated forecasts of the same milestone. DOE Project Pele groundbreaking article; BWXT Project Pele page; Record of Decision for the Final Construction and Demonstration of a Prototype Mobile Microreactor Environmental Impact Statement

Project TETRA / TETRA-1 pilot at Texas A&M RELLISUnited StatesAnnouncedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.

Not found in the sources we checked. DOE's January 2026 worker-safety variance lists a TETRA-1 reactor at Texas A&M RELLIS, and World Nuclear News of 8 January 2026 describes TETRA as a pilot reactor to support Terrestrial's IMSR licensing. Neither names a recipient of power or heat. A DOE pilot-program slide filed in July 2026 describes TETRA as a 200 W thermal test reactor, which implies no saleable output. Terrestrial's own release could not be read. DOE advanced-reactor worker-safety variance — named project sites; Terrestrial Energy, Oklo execute DOE agreements; DOE Office of Nuclear Energy: Reactor Pilot Program Update, slides filed with the NRC (ADAMS ML26198A212)

Not found in the sources we checked. World Nuclear News reported on 8 January 2026 that Terrestrial Energy executed an Other Transaction Authority agreement with DOE under which the department will review and authorize TETRA's design and operation. DOE is the authorizing body, and Texas A&M's June 2026 agreements, which support research tied to TETRA at RELLIS, are with the site host. No engineering or construction contractor for TETRA-1 is named. Terrestrial Energy, Oklo execute DOE agreements; America's Nuclear Energy Race Accelerates at Texas A&M-RELLIS; DOE advanced-reactor worker-safety variance — named project sites

Source-backed project statement World Nuclear News reported on 8 January 2026 that Terrestrial Energy executed an agreement with DOE for Project TETRA under the Advanced Reactor Pilot Program, under which each company is responsible for all costs of designing, manufacturing, constructing, operating and decommissioning its test reactor. Terrestrial therefore funds TETRA itself, with no amount disclosed. DOE authorization is not DOE funding. Terrestrial Energy, Oklo execute DOE agreements; DOE advanced-reactor worker-safety variance — named project sites

Not found in the sources we checked. World Nuclear News of 8 January 2026 says TETRA uses standard-assay low-enriched uranium tetrafluoride fuel below 5% U-235 and that Terrestrial was separately selected for DOE's Fuel Line Pilot Program. These are a design specification and a company-level program selection. No source read names a fuel supplier, fabrication or delivery for TETRA-1. Terrestrial Energy, Oklo execute DOE agreements; DOE advanced-reactor worker-safety variance — named project sites

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. DOE's January 2026 variance memorandum and World Nuclear News of 8 January 2026 repeat the pilot program's goal of criticality for at least three unnamed test reactors by 4 July 2026, and neither gives a date for TETRA-1. No dated TETRA-1 milestone is stated, so no revision is shown. DOE advanced-reactor worker-safety variance — named project sites; Terrestrial Energy, Oklo execute DOE agreements

Pupuk Kaltim nuclear-powered ammonia study at BontangIndonesiaAnnouncedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Not found in the sources we checked. Copenhagen Atomics' 19 May 2023 page says the reactors would power an ammonia facility in Bontang producing about one million tonnes a year, possibly also for marine fuel. Neither that page, Topsoe's 18 May 2023 page nor World Nuclear News' 19 May 2023 report names a buyer of the plant's power, heat or ammonia under an agreement. Copenhagen Atomics: Bontang ammonia memorandum, 19 May 2023

Source-backed project statement The May 2023 memorandum, as reported by World Nuclear News and Topsoe, would have Copenhagen Atomics deliver the thorium molten-salt reactors, Topsoe the electrolysis cells and ammonia synthesis, and Alfa Laval and Aalborg CSP heat-exchange and thermal-storage equipment for a Bontang ammonia facility. The memorandum is to investigate building the facility. It is not a supply or construction contract, and Copenhagen Atomics described it as a step before a final agreement. WNN: SMRs considered for Indonesian fertiliser plant; Topsoe: Bontang ultra-low-emission ammonia memorandum, 18 May 2023; Copenhagen Atomics: Bontang ammonia memorandum, 19 May 2023

Not found in the sources we checked. World Nuclear News on 19 May 2023 gives an estimated investment of USD 4 billion for the Bontang ammonia facility, and Copenhagen Atomics the same day says construction is expected to cost about USD 4 billion while the economics are not finalised. These are cost estimates, not financing. Neither source names a funder, instrument or committed amount for the facility or its reactors. WNN: SMRs considered for Indonesian fertiliser plant; Copenhagen Atomics: Bontang ammonia memorandum, 19 May 2023

Not found in the sources we checked. The May 2023 World Nuclear News and Copenhagen Atomics pages say Copenhagen Atomics would supply thorium molten-salt reactors and describe thorium's abundance. That is a design and company description. Neither names a fuel supplier, quantity or delivery for the Bontang reactors. WNN: SMRs considered for Indonesian fertiliser plant; Copenhagen Atomics: Bontang ammonia memorandum, 19 May 2023

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. World Nuclear News and Copenhagen Atomics each said on 19 May 2023 that the Bontang facility was expected to open in 2028, and Topsoe's 18 May 2023 page gives no year. The same target stated in two same-day sources is not a revision, and no later opening date was read. WNN: SMRs considered for Indonesian fertiliser plant; Copenhagen Atomics: Bontang ammonia memorandum, 19 May 2023; Topsoe: Bontang ultra-low-emission ammonia memorandum, 18 May 2023

Purdue / Duke Energy SMR feasibility study for the Purdue campusUnited StatesAnnounced
  • Project proposerPurdue University
  • Project proposerDuke Energy
Not recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.Not recorded

Source-backed project statement Duke Energy's 27 April 2022 release says an SMR could meet current and future needs of Purdue's West Lafayette campus and provide excess power to the state grid, and Purdue's 10 May 2023 release says the study asked whether advanced reactors could power the campus in the 2030s and beyond. The intended user is Purdue's own campus, at study stage. No power purchase agreement or other buyer is named, and no decision to build has been made. Purdue and Duke Energy to explore potential for clean nuclear power source for campus; Feasibility study: Advanced nuclear technology is a potential option to achieve zero carbon emissions for Purdue University - News

Not found in the sources we checked. Duke Energy's 27 April 2022 release says Purdue and Duke Energy will jointly explore feasibility, and Purdue's 10 May 2023 release says no technology has been selected and no decision to build has been made. The two partners are the project's proposers, and neither release names an engineering, study or construction contractor. Purdue and Duke Energy to explore potential for clean nuclear power source for campus; Feasibility study: Advanced nuclear technology is a potential option to achieve zero carbon emissions for Purdue University - News

Not found in the sources we checked. Purdue's 10 May 2023 release lists cost and economic studies as next steps and recommends federal and state support measures as policy items. It states no funder, amount or allocation for the campus study or a campus reactor. Feasibility study: Advanced nuclear technology is a potential option to achieve zero carbon emissions for Purdue University - News

Not found in the sources we checked. Purdue's 10 May 2023 release lists a fuel availability program among federal policy recommendations, and Duke Energy's 27 April 2022 release describes Purdue's teaching reactor as too small to power the campus. Neither names a fuel supplier, quantity or delivery for a campus reactor. Feasibility study: Advanced nuclear technology is a potential option to achieve zero carbon emissions for Purdue University - News; Purdue and Duke Energy to explore potential for clean nuclear power source for campus

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Duke Energy's 27 April 2022 release announced the study, and Purdue's 10 May 2023 release published an interim report with a 2030s horizon and a roughly ten-year development duration. These are different acts and general horizons, not two dates for one campus construction or operation milestone. Purdue and Duke Energy to explore potential for clean nuclear power source for campus; Feasibility study: Advanced nuclear technology is a potential option to achieve zero carbon emissions for Purdue University - News

Pylon / LOKI MMR experiment proposal for INL's DOMEUnited StatesAnnouncedNot recorded

Not found in the sources we checked. NANO Nuclear's 15 January 2025 release describes LOKI MMR for classes of remote terrestrial, marine and space uses but names no buyer, and the DOE notices of 23 October 2023 and 18 November 2024 and the 2 October 2026 ANS article treat DOME as a test facility. No recipient of power from a LOKI demonstration is named. NANO Nuclear: announces LOKI MMR as the tradename for its acquired Pylon design

Not found in the sources we checked. The DOE notice of 23 October 2023 says DOE, through NRIC, funded Ultra Safe Nuclear, the developer, to carry out front-end engineering and experiment design of the Pylon experiment for DOME, and the 18 November 2024 second phase went to Radiant and Westinghouse. NANO Nuclear's 15 January 2025 release says it acquired and renamed the design. No engineering or construction contractor other than the developers is named, and no DOME slot is shown. DOE: awards $3.9 million for advanced reactor experiment designs; DOE: awards $5 million for second phase of advanced reactor experiment designs; NANO Nuclear: announces LOKI MMR as the tradename for its acquired Pylon design

Source-backed project statement The DOE notice of 23 October 2023 says DOE, through NRIC, awarded $3.9 million in total to Radiant, Ultra Safe Nuclear and Westinghouse for front-end engineering and experiment design of DOME experiments, naming Pylon as Ultra Safe's design. Pylon's share is not stated. The 18 November 2024 second-phase award of $5 million went to Radiant and Westinghouse only, and no later award naming LOKI MMR was read. DOE: awards $3.9 million for advanced reactor experiment designs; DOE: awards $5 million for second phase of advanced reactor experiment designs

Not found in the sources we checked. The DOE notice of 23 October 2023 says the design process supports planning for fueled reactor experiments, but it, the 2024 DOE notice and NANO Nuclear's 15 January 2025 release name no fuel manufacturer, quantity or delivery for a Pylon or LOKI MMR experiment. DOE: awards $3.9 million for advanced reactor experiment designs

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. NANO Nuclear's 15 January 2025 release puts the earlier 2026 initial-testing timeline under review after the acquisition and describes a demonstration aim by 2027. Initial testing and demonstration are not established as the same milestone, so these dates are not treated as a comparable revision. The 2 October 2026 ANS account does not name LOKI in the NRIC queue; that omission alone does not establish cancellation or a confirmed slot. NANO Nuclear: announces LOKI MMR as the tradename for its acquired Pylon design; ANS: Deployable Energy next in line for testing in NRIC's DOME

Radiant Kaleidos Buckley Space Force Base proposalUnited StatesSitingNot recorded

Not found in the sources we checked. Radiant's 22 April 2026 release and World Nuclear News of 24 April 2026 say the Air Force and the Defense Innovation Unit selected Radiant to develop and operate a microreactor proposed for Buckley Space Force Base to support national-security missions, but they name no power purchase agreement, quantity or terms. The base is the host, and no purchase arrangement is stated. Radiant Buckley selection; WNN: US Air Force announces selections for microreactor deployments

Not found in the sources we checked. Radiant's 22 April 2026 release says the Air Force and the Defense Innovation Unit selected Radiant, the developer, to develop and operate a microreactor proposed for Buckley, with siting and environmental analyses as next steps, and World Nuclear News calls the selected companies potential developers and operators. No separate engineering or construction contractor is named, and no construction award is shown. Radiant Buckley selection; WNN: US Air Force announces selections for microreactor deployments

Not found in the sources we checked. Radiant's 22 April 2026 release and World Nuclear News of 24 April 2026 state no award, contract value or funding for the Buckley microreactor. Radiant's separate Army Janus agreement belongs to a different project, and DOE's July 2026 HALEU commitment is a fuel allocation, not money. Radiant Buckley selection; WNN: US Air Force announces selections for microreactor deployments

Source-backed project statement On 23 July 2026 the Department of Energy said it made a conditional commitment to provide high-assay low-enriched uranium for Radiant's deployment of a microreactor to Buckley, the Air Force's preferred location. The same notice says contracting to allocate the material will be initiated and that an earlier Radiant allocation supported the Kaleidos demonstration reactor. The commitment is not delivery or loading, and no quantity for Buckley is stated. DOE: Energy Department to Distribute Third Round of HALEU to NASA and Radiant

Not recorded

Comparable schedule revision not established. Radiant's 22 April 2026 release says the first Kaleidos reactors will be delivered by 2028, and both it and World Nuclear News give the ANPI program aim of a reactor operating on an Air Force installation by 2030 or sooner. These are different scopes, each stated once, so no revision of a Buckley milestone is shown. Radiant Buckley selection; WNN: US Air Force announces selections for microreactor deployments

Radiant Kaleidos demonstration at INL DOMEUnited StatesCommissioningNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recordedReviewed 19 Oct 2026: not disclosed in the reviewed evidence.

Not found in the sources we checked. DOE's July 2025 and April 2026 articles describe the Kaleidos Demonstration Unit as a self-funded test campaign in DOE's DOME test bed at Idaho National Laboratory. They name no buyer of its electricity or heat, and DOE's pages use the word commercial only for later licensing of developers' reactors. DOE: World's First Microreactor Test Bed Now Open for Business

Not found in the sources we checked. DOE's July 2025 selection article and April 2026 opening article describe Radiant testing its Kaleidos unit in DOME, a DOE test bed at Idaho National Laboratory. They name no engineering or construction contractor for the Kaleidos demonstration, and INL is recorded as the site host. DOE: Energy Department Announces First Microreactor Experiments in DOME Test Bed

Source-backed project statement DOE's 1 July 2025 article says DOME testing campaigns are self-funded by the applicants, and its 8 April 2026 article lists the ability to self-fund as a sequencing criterion. Radiant is therefore stated to fund its own Kaleidos test campaign. No amount is given. DOE: Energy Department Announces First Microreactor Experiments in DOME Test Bed

Source-backed project statement Radiant's 1 July 2026 release says it received its first tranche of TRISO fuel at the DOME facility, fabricated by Standard Nuclear in Oak Ridge to Radiant's specifications for the Kaleidos reactor. DOE said on 23 July 2026 that Radiant had previously received HALEU to support Kaleidos. Fuel loading is not confirmed in the sources read. radiantnuclear.com: Radiant receives first TRISO fuel tranche at INL's DOME facility; DOE: Energy Department to Distribute Third Round of HALEU to NASA and Radiant

Comparable schedule revision not established. DOE said on 1 July 2025 that DOME's first fueled reactor experiment would start as early as spring 2026, without naming which developer, and on 8 April 2026 that Kaleidos's initial startup was anticipated in the summer. The 2025 statement is an earliest date, not a target that the 2026 statement moves, and the record's events hold no revision pair. DOE: Energy Department Announces First Microreactor Experiments in DOME Test Bed; DOE: World's First Microreactor Test Bed Now Open for Business

Radiant Kaleidos microreactors at Fort Benning (Army Janus)United StatesAnnounced

Source-backed project statement The Army's 10 September 2026 Fort Benning article says the three planned Radiant microreactors will each generate 1 MW and continuously tie into the installation's electrical network. The installation, which is also the host, is the stated user of the power under a contractor-owned and operated model. No power purchase agreement, price or other buyer is named, and Radiant's separate Equinix agreement is not stated to involve Fort Benning. Fort Benning set to host next generation nuclear power initiative

Not found in the sources we checked. The Army's 10 September 2026 article says the three Fort Benning microreactors will be contractor-owned and operated by Radiant, and Radiant's 26 August 2026 release says it will deploy 15 reactors under the Janus Program. Radiant is the project's own vendor and intended operator, so its Janus selection is not a separate contractor appointment. Neither source names an engineering or construction contractor, and candidate parcels are still under evaluation. Fort Benning set to host next generation nuclear power initiative; Radiant: U.S. Army Janus agreement for Kaleidos microreactors

Not found in the sources we checked. Radiant’s agreement of up to US$750 million covers 15 Kaleidos reactors through the Janus program. The cited release does not allocate that program ceiling to Fort Benning; it is not a disclosed Fort Benning funding amount. Radiant: U.S. Army Janus agreement for Kaleidos microreactors

Source-backed project statement The Army's 10 September 2026 Fort Benning article reports Radiant saying it will be responsible for operating the Fort Benning units as well as fueling, refueling and spent-fuel management. That assigns fuel responsibility for these units to Radiant. No fuel fabricator, quantity or delivery date is named, and no fuel has been reported delivered. Fort Benning set to host next generation nuclear power initiative

Comparable schedule revision not established. Radiant's 26 August 2026 release says it will deploy 15 reactors by 2030, beginning at Fort Benning, and the Army's Fort Benning article says the program is working toward first microreactors operating by 2028. These are a fleet date and a program date stated once each, not an earlier and later date for the same Fort Benning milestone. Radiant: U.S. Army Janus agreement for Kaleidos microreactors

RITM-200N JizzakhUzbekistanConstructionNot recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.
  • Vendor for the linked designRosatom

Not found in the sources we checked. The Uzatom accounts of 24 March 2026 and 4 June 2026 describe the Farish plant as an integrated nuclear station and name no electricity buyer for the RITM-200N units. A national-supply purpose for the combined station is not an offtake. The two large units named in the March agreement are outside this row. Uzatom: First concrete works begin at the site of the first NPP (24 March 2026); Uzatom: Historic start - construction of the integrated nuclear power plant begins in Uzbekistan (4 June 2026)

  • Construction contractorAtomstroyexport

Source-backed project statement Uzatom's 24 March 2026 account says the Directorate and Atomstroyexport, Rosatom's engineering division, signed a contract on 27 May 2024 to build a small nuclear plant in Jizzakh region. The same account says a later agreement sets two RITM-200N units of 55 MW each beside two large units. The 2024 contract is a construction contract for the small-plant project, and the page does not restate its price after the configuration change. Uzatom: First concrete works begin at the site of the first NPP (24 March 2026)

Source-backed project statement World Nuclear News on 5 June 2026 reported President Putin's statement that Russia would provide a preferential export loan for the plant and support it through its lifecycle. That is an announced commitment at the first-unit ceremony, not a record of money paid. The report does not limit the loan to the RITM-200N units. World Nuclear News: Ceremony to mark first concrete for Uzbekistan SMR (5 June 2026)

Source-backed project statement World Nuclear News on 5 June 2026 reported a Russian commitment, stated at the ceremony, to long-term reactor fuel supplies for the plant. The Uzatom and regulator pages reviewed do not name a fuel manufacturer, a delivery, or a loading for the RITM-200N unit. The reported commitment is not shown as a signed fuel contract. World Nuclear News: Ceremony to mark first concrete for Uzbekistan SMR (5 June 2026); Uzatom: Historic start - construction of the integrated nuclear power plant begins in Uzbekistan (4 June 2026)

Not recorded

Comparable schedule revision not established. World Nuclear News on 5 June 2026 recalls that the first unit of the original six-unit RITM-200N plan was scheduled to go critical in late 2029. Uzatom's 24 March 2026 configuration text states two RITM-200N units and two large units and does not restate a criticality date. The texts do not contain two forecasts of the same milestone for the same unit. World Nuclear News: Ceremony to mark first concrete for Uzbekistan SMR (5 June 2026); Uzatom: First concrete works begin at the site of the first NPP (24 March 2026)

Rolls-Royce SMR Dětmarovice candidate locationCzechiaSiting
  • Project proposerCEZ Group
Not recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.
  • Vendor for the linked designRolls-Royce SMR

Not found in the sources we checked. The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. MPO: Czech Republic will develop further SMR sites; ČEZ additional Czech SMR locations; World Nuclear News: ČEZ submits EIA documentation for the Temelín Rolls-Royce SMR to the Ministry of the Environment

Not found in the sources we checked. The reviewed sources do not establish an additional project-specific engineering, preparatory-work or construction assignment. A supplier’s general capabilities or an industry-wide agreement do not establish a contract for this site. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. MPO: Czech Republic will develop further SMR sites; ČEZ additional Czech SMR locations; World Nuclear News: ČEZ submits EIA documentation for the Temelín Rolls-Royce SMR to the Ministry of the Environment

Not found in the sources we checked. The reviewed sources do not establish a project-specific financing commitment or amount. General company backing, ownership and policy support do not by themselves establish allocated or paid project funding. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. MPO: Czech Republic will develop further SMR sites; ČEZ additional Czech SMR locations

Not found in the sources we checked. The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. MPO: Czech Republic will develop further SMR sites; ČEZ additional Czech SMR locations

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. MPO: Czech Republic will develop further SMR sites; ČEZ additional Czech SMR locations

Rolls-Royce SMR Tušimice candidate locationCzechiaSiting
  • Project proposerCEZ Group
Not recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.
  • Vendor for the linked designRolls-Royce SMR

Not found in the sources we checked. The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. MPO: Czech Republic will develop further SMR sites; ČEZ additional Czech SMR locations; ČEZ: Temelín SMR project advances to next phase; CENIA EIA MZP531: Nový jaderný zdroj SMR v lokalitě Tušimice

Not found in the sources we checked. The reviewed sources do not establish an additional project-specific engineering, preparatory-work or construction assignment. A supplier’s general capabilities or an industry-wide agreement do not establish a contract for this site. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. MPO: Czech Republic will develop further SMR sites; ČEZ additional Czech SMR locations; CENIA EIA MZP531: Nový jaderný zdroj SMR v lokalitě Tušimice; World Nuclear News: ČEZ submits EIA documentation for the Temelín Rolls-Royce SMR to the Ministry of the Environment

Not found in the sources we checked. The reviewed sources do not establish a project-specific financing commitment or amount. General company backing, ownership and policy support do not by themselves establish allocated or paid project funding. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. MPO: Czech Republic will develop further SMR sites; ČEZ additional Czech SMR locations; CENIA EIA MZP531: Nový jaderný zdroj SMR v lokalitě Tušimice

Not found in the sources we checked. The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. CENIA EIA MZP531: Nový jaderný zdroj SMR v lokalitě Tušimice; MPO: Czech Republic will develop further SMR sites; ČEZ: Temelín SMR project advances to next phase

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. CENIA EIA MZP531: Nový jaderný zdroj SMR v lokalitě Tušimice; MPO: Czech Republic will develop further SMR sites

Rolls-Royce SMR WylfaUnited KingdomSitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded
  • Vendor for the linked designRolls-Royce SMR

Not found in the sources we checked. Great British Energy – Nuclear's 13 November 2025 site announcement and 13 April 2026 contract release say the Wylfa project would deliver up to 1.5 GW to the grid, and at least 1.4 GWe for around three million homes, but neither names a buyer, contracted quantity or power purchase agreement. Wylfa selected for UK SMRs; GBE Nuclear and Rolls-Royce SMR contract

Source-backed project statement Great British Energy – Nuclear's 13 April 2026 release says it signed a contract with Rolls-Royce SMR that begins technology design and requires site-specific design, regulatory engagement and planning ahead of a future final investment decision. That is an explicit preparatory design contract with the reactor vendor, not a construction award. No construction or delivery-partner award is shown in the releases read. GBE Nuclear and Rolls-Royce SMR contract

  • Funder or lender named for this projectUK Government

Source-backed project statement GOV.UK's 13 April 2026 contract announcement says 2.6 billion pounds was allocated in the 2025 Spending Review to enable the Great British Energy - Nuclear and Rolls-Royce SMR contract and wider program delivery. The November 2025 site announcement says the SMR program is backed by 2.5 billion pounds of government funding. These are program allocations, not a Wylfa plant budget, closed financing or disbursement, and no investment decision has been taken. GBE Nuclear and Rolls-Royce SMR contract; Wylfa selected for UK SMRs

Not found in the sources we checked. Great British Energy – Nuclear's 13 April 2026 contract release limits the contract to design, regulatory engagement and planning, and neither it nor the 13 November 2025 site announcement names a fuel supplier, fuel contract or delivery for the Wylfa units. GBE Nuclear and Rolls-Royce SMR contract; Wylfa selected for UK SMRs

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. World Nuclear News reported on 13 November 2025 that Great British Energy - Nuclear would start site activity in 2026 with the aim of Wylfa's SMRs supplying power from the mid-2030s. The same article's early-2030s phrase describes earlier site-assessment criteria, not a Wylfa target, and the record's events hold no revision pair. WNN: UK selects Wylfa for at least three Rolls-Royce SMRs

Ruijin HTR nuclear power proposal (Jiangxi)ChinaAnnouncedNot recordedNot recordedNot recorded

Not found in the sources we checked. World Nuclear News of 27 April 2015 and the China Atomic Energy Authority item of 21 April 2015 describe CNEC's October 2013 framework agreement with the Ruijin city government and the November 2014 project company, but name no buyer of the plant's power or heat. The city is the agreement counterparty, not a stated offtaker. WNN: Ruijin HTR plant proposal progresses

Not found in the sources we checked. World Nuclear News of 27 April 2015 says CNEC, the proposer, signed a framework agreement with the Ruijin city government in 2013 and set up the project company Ruijin Nuclear Engineering HTR NPP Company in November 2014, and that the pre-feasibility study passed review in April 2015. The two pages name no separate engineering or construction contractor, and NDRC and National Nuclear Safety Administration approvals were still required. WNN: Ruijin HTR plant proposal progresses

Not found in the sources we checked. World Nuclear News of 27 April 2015 and the China Atomic Energy Authority item of 21 April 2015 describe the proposal, project company and approval steps but state no investment, budget or financing for the Ruijin units. WNN: Ruijin HTR plant proposal progresses

Not found in the sources we checked. The China Atomic Energy Authority item of 21 April 2015 credits the reactor's safety partly to high-temperature-resistant fuel elements and says CNEC offers fuel supply among export services, but names no fuel manufacturer, quantity or delivery for the Ruijin units. CAEA: Jiangxi Ruijin HTR project

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. World Nuclear News of 27 April 2015 expects construction to start in 2017 with grid connection in 2021, and the China Atomic Energy Authority item of 21 April 2015 gives the same 2017 start for phase one after national approval and a construction license. The two sources state the same target, and no later source read revises it. WNN: Ruijin HTR plant proposal progresses; CAEA: Jiangxi Ruijin HTR project

RUTA-70 reference heating unit proposal at IPPE, Obninsk (2004)RussiaAnnouncedNot recordedNot recordedNot recorded

Not found in the sources we checked. The IAEA's 2016 SMR booklet says 2003 technical and economic assessments looked at using a 70 MWt RUTA reactor to upgrade Obninsk's district heating system, and that the 2004 IPPE proposal was a reference unit in Obninsk. No heat utility, buyer, quantity or supply agreement is named, and RUTA remained at conceptual design. IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition)

Source-backed project statement The IAEA's 2016 SMR booklet says IPPE's 2004 proposal to build the first reference RUTA-70 unit in Obninsk was supported by a feasibility study carried out jointly by NIKIET, IPPE and Atomenergoproekt of Moscow. That was completed preparatory feasibility work, not an engineering or construction contract, and the booklet says RUTA was still at conceptual design. IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition)

Not found in the sources we checked. The IAEA's 2016 SMR booklet records the 2003 approval of the project by the board of the Obninsk science-town development program and the 2004 proposal, but states no funder, budget or amount for a RUTA-70 unit at Obninsk. The program-board approval is a local development decision, not stated funding. IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition)

Not found in the sources we checked. The IAEA's 2016 SMR booklet describes RUTA-70 at the conceptual-design stage and names no fuel supplier, fabrication or delivery for a reference unit at Obninsk. This records the booklet's dated scope, not a finding that no later progress occurred. IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The IAEA's 2016 SMR booklet dates only past steps for the Obninsk proposal, the 2003 assessments and board approval and the 2004 proposal, and gives no construction or operation target. No revision is shown. IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition)

SaskPower Rafferty SMR (Estevan area)CanadaSiting
  • Project proposerSaskPower
Not recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.

Not found in the sources we checked. Saskatchewan's 29 September 2026 release says SaskPower selected the Rafferty site near Estevan for further SMR study, aiming for at least 600 MW. It names no buyer of that power. The Bell AI data center appears in a supplier association quotation as an example of other provincial projects, not as a Rafferty offtaker. Saskatchewan Rafferty SMR selection

Not found in the sources we checked. Saskatchewan's 29 September 2026 release says SaskPower selected Rafferty for further study, and quotes GE Vernova Hitachi saying it supports SaskPower's step toward the BWRX-300. That is a vendor quotation, not an engineering or construction award. The release names no contractor for Rafferty. Saskatchewan Rafferty SMR selection

Not found in the sources we checked. Saskatchewan's 29 September 2026 release states no amount, funder or award for the Rafferty SMR study or plant. Saskatchewan Rafferty SMR selection

Not found in the sources we checked. Saskatchewan's 29 September 2026 release quotes Cameco looking forward to competing for the province's nuclear business and GE Vernova Hitachi on the BWRX-300. Neither names a fuel supplier, quantity or delivery for Rafferty. Saskatchewan Rafferty SMR selection

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Saskatchewan's 29 September 2026 release gives no construction or operation date for Rafferty. Its 2042 date is for the first of two planned large reactors in northwest Saskatchewan and its 2050 date is a provincial capacity goal, both different scopes. Saskatchewan Rafferty SMR selection

SEALER power plant proposal in Longyearbyen, SvalbardNorwaySitingNot recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.
  • Vendor for the linked designBlykalla

Source-backed project statement Blykalla’s 14 August 2025 release describes intended year-round electricity and district heating to replace Longyearbyen’s temporary diesel generation. It names no purchaser or contracted quantity. Intended use is not an offtake agreement. Planning initiative submitted for lead-cooled SMR power plant on Svalbard

Not found in the sources we checked. The reviewed sources do not establish an additional project-specific engineering, preparatory-work or construction assignment. A supplier’s general capabilities or an industry-wide agreement do not establish a contract for this site. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Planning initiative submitted for lead-cooled SMR power plant on Svalbard; Norsk Kjernekraft: locations (ten project companies)

Not found in the sources we checked. The reviewed sources do not establish a project-specific financing commitment or amount. General company backing, ownership and policy support do not by themselves establish allocated or paid project funding. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Planning initiative submitted for lead-cooled SMR power plant on Svalbard

Not found in the sources we checked. The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Planning initiative submitted for lead-cooled SMR power plant on Svalbard

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Planning initiative submitted for lead-cooled SMR power plant on Svalbard

SGP Industria Rolls-Royce SMR plant (2024 decision in principle)PolandSuspended
  • Project proposerSGP Industria
Not recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.
  • Vendor for the linked designRolls-Royce SMR

Not found in the sources we checked. Poland's nuclear program text says some potential investors, including Industria, reported plans to use heat from nuclear units for industry and municipal district-heating systems, but it names no plant, factory, network or buyer for Industria. The 13 May 2024 ministry announcement, the 14 May 2024 nuclear.pl report and the 10 August 2026 Gramwzielone article name no buyer either, and the project is currently suspended. Government of Poland: Polish Nuclear Power Programme update attachment

Not found in the sources we checked. The climate ministry's 13 May 2024 announcement says the 10 May 2024 decision in principle for Industria covers a plant using Rolls-Royce SMR technology and allows it to seek later decisions such as a location decision. That is a government permission for the developer, and Rolls-Royce SMR is the technology vendor. No engineering or construction contractor is named in the opened pages, and the project is now suspended. Ministry of Climate: decision in principle for an SMR plant in Rolls-Royce SMR technology; Government of Poland: Polish Nuclear Power Programme update attachment

Not found in the sources we checked. Poland's nuclear program text says projects outside the national program mobilise private capital, and the 10 August 2026 Gramwzielone article says a planned SMR roadmap would list possible kinds of public aid decided case by case. Neither, nor the 2024 ministry and nuclear.pl pages, states an amount, investor or award for the Industria project. Government of Poland: Polish Nuclear Power Programme update attachment; Gramwzielone: two SMR projects in Poland no longer being developed

Not found in the sources we checked. The climate ministry's 13 May 2024 announcement says the decision in principle covers a spent-fuel store as an integral part of the plant, which is not a fresh-fuel supply. No opened page names a fuel manufacturer, quantity or delivery for Industria's Rolls-Royce SMR units. Ministry of Climate: decision in principle for an SMR plant in Rolls-Royce SMR technology

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The decision in principle is dated 10 May 2024, and in 2026 the energy ministry described the Industria project as not currently being implemented and suspended, according to the 10 August 2026 Gramwzielone article and the program text. No source read gives a construction or operation target, so a suspension is a status change, not a revised date. Ministry of Climate: decision in principle for an SMR plant in Rolls-Royce SMR technology; Gramwzielone: two SMR projects in Poland no longer being developed; Government of Poland: Polish Nuclear Power Programme update attachment

Shandong Haiyang integrated small reactor demonstration project (heat only)ChinaSitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Source-backed project statement The 2023 siting-stage environmental report says the 200 MWt reactor would mainly supply industrial steam to outside users, provide heat for thermal desalination at Haiyang units 5 and 6, and serve as a standby winter heat source for Haiyang city. The desalination and plant-site uses belong to the owner's own Haiyang station, and the city heating role is standby. The industrial steam buyers are not named and no supply agreement is stated. MEE: siting-stage environmental impact report (September 2023), Shandong Haiyang integrated small reactor demonstration project

Source-backed project statement The Ministry of Ecology and Environment's August 2024 notice of proposed approval names Shanghai Nuclear Engineering Research and Design Institute as the environmental assessment body for the siting-stage report, a preparatory licensing role. The report says SPIC Nuclear Energy owns the project and has commissioned Shandong Nuclear Power to manage construction and operation, which are the recorded operator roles. No construction contractor is named, and the NNSA siting opinion bars safety-related construction before a construction license. MEE: proposed approval of the Haiyang integrated small reactor siting-stage environmental impact report (23 August 2024); MEE: siting-stage environmental impact report (September 2023), Shandong Haiyang integrated small reactor demonstration project; NNSA: site-selection review opinion No. 2414 for the Shandong Haiyang integrated small reactor demonstration project (10 September 2024)

Source-backed project statement The 2023 siting-stage environmental report says SPIC Nuclear Energy, as investor and owner, provides the resources for construction and operation, including funding, oversight and final economic responsibility. The Ministry of Ecology and Environment's August 2024 notice puts environmental-protection investment at 93.6 million yuan, 3.4% of total investment, without stating the total. No investment approval or financing close is reported. MEE: siting-stage environmental impact report (September 2023), Shandong Haiyang integrated small reactor demonstration project

Source-backed project statement The 2023 siting-stage environmental report says the first core and reload fuel assemblies will be supplied by SPIC Uranium Industry Development, which may commission CNNC Baotou Nuclear Fuel Element or CNNC Jianzhong Nuclear Fuel to fabricate them, with road transport from either plant. This is a planned supply arrangement described in a regulatory filing, with no contract, quantity or delivery date stated. MEE: siting-stage environmental impact report (September 2023), Shandong Haiyang integrated small reactor demonstration project

Not recorded

Comparable schedule revision not established. The 2023 siting-stage environmental report gives a 48-month construction period and a 60-year design life, and says the actual start depends on the state's approval of construction. The NNSA's 10 September 2024 siting opinion sets no date. No dated construction or operation target is stated, so no revision is shown. MEE: siting-stage environmental impact report (September 2023), Shandong Haiyang integrated small reactor demonstration project

Shearwater NuScale Wylfa feasibility proposal (2021)Earlier-plan recordUnited KingdomAnnouncedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
  • Vendor for the linked designNuScale Power

Not found in the sources we checked. On 23 September 2021, UK Parliament oral evidence says NuScale was looking at twelve 77-megawatt reactors on the Wylfa Magnox site and that the Magnox program under study would produce almost 1 gigawatt. Forster said this particular development at Wylfa would look to decarbonise the north Wales and north-western grid by about 2035. The hearing names no offtaker, heat user, or research customer and states no purchase terms. An informal price channel and pension-fund interest are not a customer. Welsh Affairs Committee oral evidence: One-off session on Wylfa Newydd, HC 622

Source-backed project statement On 23 September 2021, UK Parliament oral evidence says Shearwater teamed with NuScale to study small reactors at the Wylfa Magnox site, and Forster said the feasibility study was pretty much complete apart from the financial piece and construction duration. That is preparatory study work, not a construction or engineering award. The ten BWRX-300 units he described are a separate proposal for the Wylfa Newydd site. Welsh Affairs Committee oral evidence: One-off session on Wylfa Newydd, HC 622

Not found in the sources we checked. On 23 September 2021, UK Parliament oral evidence records Shearwater calling development finance a problem and saying pension funds were keen to invest in small modular reactors, while a BEIS director said the Shearwater talks were exploratory and there was not a defined budget at that stage. Those statements do not identify money paid or a signed amount for the Magnox proposal. A regulated-asset-base remark covering a first reactor, or the first three, and then the remaining seven follows his ten-unit Newydd count and is not treated as Magnox funding. Welsh Affairs Committee oral evidence: One-off session on Wylfa Newydd, HC 622

Not found in the sources we checked. On 23 September 2021, UK Parliament oral evidence describes a feasibility study of twelve 77-megawatt reactors at Wylfa Magnox and does not name a fuel supplier, fabrication order, delivery, or loading for that proposal. Comments elsewhere in the session about other fuel plants belong to other witnesses and other projects. No supply commitment for this proposal is stated. Welsh Affairs Committee oral evidence: One-off session on Wylfa Newydd, HC 622

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. On 23 September 2021, UK Parliament oral evidence gives one Shearwater timescale: first ground-breaking in 2025, first nuclear concrete in late 2026 or early 2027, first power in 2028, and a final reactor about 2035-36. That is one sequence of different milestones, not two dated forecasts of the same milestone, and the answer is not labeled as the twelve-module unit alone. A delay Forster attributed to NuScale's first-of-a-kind project in North America is a different project. The hope for Magnox costs and a construction program in 2021 is a study output, not a second operation date. Welsh Affairs Committee oral evidence: One-off session on Wylfa Newydd, HC 622

Shelf-M small nuclear plant at the Sovinoe deposit, ChukotkaRussiaSiting
  • Project proposerRosatom
Not recorded
  • Vendor for the linked designNIKIET

Source-backed project statement Rosatom's corporate newspaper on 5 July 2026 and Atomnaya Energiya 2.0 on 30 July 2026 say the Shelf-M reactor is intended for the Chukotka small nuclear plant that will supply energy to the Elkon mining and metallurgical company (Эльконский ГМК), which is to develop the Sovinoe deposit. This names an intended energy recipient. Neither source describes a signed power or heat supply contract. Atomnaya energiya 2.0: Shelf-M at the Sovinoe deposit; Strana Rosatom: Rosatom completes the investment justification for the Chukotka small plant (5 July 2026)

Not found in the sources we checked. Rosatom's director general said in July 2026 that the construction schedule for the Chukotka small plant is prepared and engineering surveys of the site have begun. Neither the 5 July 2026 Rosatom newspaper article nor the 30 July 2026 Atomnaya Energiya 2.0 report names the organization doing the surveys, the general designer or a construction contractor. Strana Rosatom: Rosatom completes the investment justification for the Chukotka small plant (5 July 2026); Atomnaya energiya 2.0: Shelf-M at the Sovinoe deposit

Not found in the sources we checked. The 5 July 2026 Rosatom newspaper article says the investment justification for the plant is nearing completion and gives no amount. Atomnaya Energiya 2.0's 30 July 2026 report says Rosatom's mining division has invested more than 1 billion rubles in the gold-mining cluster around Sovinoe, which is not money for the nuclear plant. Atomnaya energiya 2.0: Shelf-M at the Sovinoe deposit; Strana Rosatom: Rosatom completes the investment justification for the Chukotka small plant (5 July 2026)

Not found in the sources we checked. The 5 July 2026 Rosatom newspaper article says the Shelf-M fuel will be uranium dioxide in a silumin matrix similar to icebreaker fuel and that fuel endurance tests are complete. Testing and a design fuel form are not a supply commitment, and neither that article nor the 30 July 2026 report names a fuel manufacturer, quantity or delivery for the Sovinoe plant. Strana Rosatom: Rosatom completes the investment justification for the Chukotka small plant (5 July 2026)

No project-specific fuel supply arrangement is recorded as a structured fact.

Not found in the sources we checked. Rosatom's corporate newspaper on 5 July 2026 says physical start-up and commercial operation of the Shelf-M plant are expected in 2030, while Atomnaya Energiya 2.0 on 30 July 2026, citing a regional news agency, says construction is planned for 2027 and commercial operation for 2032. Neither source says the earlier date was moved, so these are conflicting targets, not a reported revision. Strana Rosatom: Rosatom completes the investment justification for the Chukotka small plant (5 July 2026); Atomnaya energiya 2.0: Shelf-M at the Sovinoe deposit

Shenyang 2 x 200 MW nuclear heating project (NHR200-I, 2001)Earlier-plan recordChinaCanceledNot recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.Not recordedNot recorded

Not found in the sources we checked. Tsinghua University INET's NHR200 page says the Shenyang 2 x 200 MW nuclear heating project received state approval of its project proposal in April 2001. The page names no heat utility or other recipient of the project's heat. INET, Tsinghua University: NHR200 low-temperature heating reactor page

Not found in the sources we checked. Tsinghua University INET's NHR200 page says INET promoted its NHR200-I heating reactor and that the Shenyang 2 x 200 MW project's proposal was approved in April 2001. INET is the design developer, and the page names no engineering or construction contractor for Shenyang. INET, Tsinghua University: NHR200 low-temperature heating reactor page

Source-backed project statement A January 2001 Nuclear Engineering International news report says the city of Shenyang would raise USD 170 million to build two 200 MW low-temperature heating reactors developed by Tsinghua University, the project whose proposal INET says received state approval in April 2001. That is a reported planned amount before approval, not money raised, appropriated or spent; no financing instrument, lender or disbursement is recorded. China to have nuclear-heated city; INET, Tsinghua University: NHR200 low-temperature heating reactor page

Not found in the sources we checked. Tsinghua University INET's NHR200 page describes the NHR200 heating reactor family and the Shenyang approval but names no fuel supplier or delivery for Shenyang. INET, Tsinghua University: NHR200 low-temperature heating reactor page

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Tsinghua University INET's NHR200 page dates only the April 2001 approval of the Shenyang project proposal and gives no construction or operation target. The December 1996 construction license on the same page is for the 200 MW design generally and does not name Shenyang. There is no target to revise. INET, Tsinghua University: NHR200 low-temperature heating reactor page

SINAP small modular thorium molten-salt research reactor (10 MWe), MinqinChinaSiting

Not found in the sources we checked. The siting-stage environmental reports of July 2024 and January 2026 describe the 10 MWe thorium molten-salt research reactor with an experimental power-generation system and a 35 kV step-up station at SINAP's Minqin campus, but name no buyer or user of its electricity or heat. It is a national research facility rather than a commercial supply project. MEE: siting-stage environmental impact report (January 2026 resubmission), SINAP small modular thorium molten-salt reactor research facility

Source-backed project statement The July 2024 siting-stage environmental report names Shanghai Nuclear Engineering Research and Design Institute as the organization that prepared the report for SINAP, a preparatory licensing role. SINAP itself is named as both construction and operating unit. No construction contractor is named, and no siting approval or construction license is recorded. MEE: siting-stage environmental impact report (July 2024), SINAP small modular thorium molten-salt reactor research facility

Source-backed project statement The January 2026 siting-stage environmental report says the facility, a 14th Five-Year national major science and technology infrastructure project, is funded by central government and enterprise support, with total investment of about 3.93 billion yuan. The July 2024 edition said central and local government support. These are funding sources and an estimate stated in a filing, not a recorded appropriation or disbursement. MEE: siting-stage environmental impact report (January 2026 resubmission), SINAP small modular thorium molten-salt reactor research facility; MEE: siting-stage environmental impact report (July 2024), SINAP small modular thorium molten-salt reactor research facility

Not found in the sources we checked. The January 2026 siting-stage environmental report says the reactor would start up on thorium with low-enriched uranium and add LEU online, that the project includes its own thorium fuel-salt research and processing system, and that off-site transport of fuel raw materials is the unnamed supplier's responsibility. No fuel supplier, contract or delivery is named. MEE: siting-stage environmental impact report (January 2026 resubmission), SINAP small modular thorium molten-salt reactor research facility

No project-specific fuel supply arrangement is recorded as a structured fact.

Source-backed project statement The July 2024 siting-stage environmental report targeted groundbreaking within 2025 and first criticality in 2030, and the January 2026 resubmission targets groundbreaking within 2026 with first criticality still in 2030. That is a one-year postponement of the same groundbreaking milestone. The July 2024 edition also printed 2029 for first criticality in one passage. Neither date is an achieved milestone. MEE: siting-stage environmental impact report (July 2024), SINAP small modular thorium molten-salt reactor research facility; MEE: siting-stage environmental impact report (January 2026 resubmission), SINAP small modular thorium molten-salt reactor research facility

SPIC Jiamusi nuclear heating demonstration (Hongxing site)ChinaSitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
  • OperatorSPIC
Not recorded

Source-backed project statement The Jiamusi environmental report published in August 2020 says the plant's heating station would feed the Jiamusi city primary heat network in the heating season and supply steam to a planned biomass power plant on the site's west side outside it, and lists the city heating and gas office's 2019 approval for connecting the project to the city heat network. The recipient is the city heat network. No heat-sale contract or buyer company is named. MEE: environmental impact report, SPIC Jiamusi nuclear heating demonstration project (August 2020)

Source-backed project statement China Energy News reported on 9 December 2019 that State Nuclear Power Technology and the Shanghai Nuclear Engineering Research and Design Institute signed, with SPIC's Heilongjiang branch and SPIC's Jilin company, general-contracting framework agreements for the Jiamusi nuclear heating demonstration and the Baishan project. The August 2020 environmental report also shows Suzhou Nuclear Power Research Institute arranging its environmental monitoring. A framework agreement is preparatory, not an EPC contract or construction approval. 中国能源报: 东北两核能供热项目加快推进; MEE: environmental impact report, SPIC Jiamusi nuclear heating demonstration project (August 2020)

Not found in the sources we checked. The Jiamusi environmental report published in August 2020 gives a total investment of 3.886 billion yuan (388,605 ten-thousand yuan), excluding network connection, of which 398.74 million yuan is environmental protection. That is a cost estimate. The report names no funder, financing instrument or approval of the investment. MEE: environmental impact report, SPIC Jiamusi nuclear heating demonstration project (August 2020)

Not found in the sources we checked. The Jiamusi environmental report published in August 2020 says the project uses SAF-6 fuel assemblies and that the owner must engage a qualified carrier and seek approval to use the new-fuel transport container in China. That names the fuel assembly type, not a fabricator, quantity or delivery. MEE: environmental impact report, SPIC Jiamusi nuclear heating demonstration project (August 2020)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The Jiamusi environmental report published in August 2020 planned simultaneous first concrete for units 1 and 2 on 30 May 2021 and operation on 30 May 2024, subject to the start date approved by the state. That target is stated once in the sources read, and no later date is given, so there is no recorded revision. MEE: environmental impact report, SPIC Jiamusi nuclear heating demonstration project (August 2020)

SRC initial eVinci demonstration proposal (canceled)CanadaCanceledNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Not found in the sources we checked. The Saskatchewan government's 27 November 2023 announcement quotes SRC's chief executive hoping to see the first eVinci in an industrial application, and the minister told a legislative committee on 15 April 2026 that remote mine sites and communities had been assumed uses. No buyer or user of the reactor's output was named, and Westinghouse later canceled the project. Government of Saskatchewan Funds Microreactor Research; Standing Committee on the Economy, Hansard, 15 April 2026

Not found in the sources we checked. The Saskatchewan government's 27 November 2023 announcement says the eVinci microreactor would be built by Westinghouse, the reactor vendor, and that SRC would license and deploy it. That is the vendor's own role, not a separate contractor appointment. No engineering or construction contractor was named before Westinghouse canceled the project, as SRC told a legislative committee on 15 April 2026. Government of Saskatchewan Funds Microreactor Research; Standing Committee on the Economy, Hansard, 15 April 2026

Source-backed project statement The Saskatchewan government announced on 27 November 2023 that it was providing 80 million dollars to the Saskatchewan Research Council to pursue the demonstration of a microreactor, the initial Westinghouse eVinci. SRC told a legislative committee on 15 April 2026 that Westinghouse had canceled the eVinci project and SRC had paused installing a reactor. The sources read do not say how much of the funding was spent or what became of the remainder. Government of Saskatchewan Funds Microreactor Research; Standing Committee on the Economy, Hansard, 15 April 2026

Not found in the sources we checked. The Saskatchewan government's 27 November 2023 announcement describes the eVinci's output modes and eight-year continuous operation but names no fuel supplier or delivery, and the project was later canceled by Westinghouse. Government of Saskatchewan Funds Microreactor Research

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. The Saskatchewan government's 27 November 2023 announcement said the eVinci was expected to operate by 2029, subject to licensing. SRC told a legislative committee on 15 April 2026 that Westinghouse had canceled the project. A cancellation ends the target rather than moving it, so there is no dated revision. Government of Saskatchewan Funds Microreactor Research; Standing Committee on the Economy, Hansard, 15 April 2026

Standard Power NuScale SMR facility in Ohio (site not disclosed)United StatesAnnounced
  • Project proposerStandard Power
Not recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.
  • Vendor named for this project (no design profile is linked)NuScale Power

Source-backed project statement NuScale's 6 October 2023 release says Standard Power, a provider of infrastructure to data-processing companies, aims to use the energy from its Ohio and Pennsylvania SMR facilities to power nearby data centers. That is the developer's own intended use, not a power purchase agreement, and no data-center operator, quantity or Ohio site is named. NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023)

Source-backed project statement NuScale's 6 October 2023 release says Standard Power chose ENTRA1 Energy, an energy development and production company with exclusive rights to develop, own and operate plants using NuScale technology, to support its Ohio and Pennsylvania projects, with NuScale as technology provider. That is a prospective development partnership, not an engineering or construction contract, and no Ohio site is named. NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023)

Not found in the sources we checked. NuScale's 6 October 2023 release refers to ENTRA1's strengths in project development and investment but states no investor commitment, amount or financing for the Ohio facility. NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023)

Not found in the sources we checked. NuScale's 6 October 2023 release describes the NuScale technology and module ratings but names no fuel supplier, fabrication or delivery for the Ohio facility. NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. NuScale's 6 October 2023 release states one plan, Standard Power operational by 2029, for the two facilities. No later source read restates or moves it, so no revision is shown. NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023)

Standard Power NuScale SMR facility in Pennsylvania (site not disclosed)United StatesAnnounced
  • Project proposerStandard Power
Not recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.
  • Vendor named for this project (no design profile is linked)NuScale Power

Source-backed project statement NuScale's 6 October 2023 release says Standard Power, a data-center hosting provider, plans two SMR-powered facilities in Ohio and Pennsylvania and aims to use the energy to power nearby data centers. The intended user is Standard Power's own data-center business. No power purchase agreement or tenant buyer is named for the Pennsylvania facility. NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023)

Not found in the sources we checked. NuScale's 6 October 2023 release says Standard Power chose NuScale as technology provider and ENTRA1 Energy, which holds rights to develop, own and operate NuScale-powered plants, to support its Ohio and Pennsylvania projects for its strengths in project development and investment. NuScale is the vendor and ENTRA1 a development and investment partner. Neither is described as an engineering or construction contractor, and none is named. NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023)

Not found in the sources we checked. NuScale's 6 October 2023 release praises ENTRA1's strengths in project development and investment and describes ENTRA1 as a company that develops, finances and owns plants. It does not say ENTRA1 or anyone else will finance the Pennsylvania facility, and it states no amount. NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023)

Not found in the sources we checked. NuScale's 6 October 2023 release says NuScale modules operate with conventional, widely available nuclear fuel. That is a design statement. It names no fuel supplier, quantity or delivery for the Pennsylvania facility. NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. NuScale's 6 October 2023 release says Standard Power plans to be operational by 2029. That single target for both facilities is stated once, and no later date was read, so there is no revision. NuScale: Standard Power plans SMR-powered facilities in Ohio and Pennsylvania (6 October 2023)

StarCore demonstration reactor at the Whiteshell Laboratories site, PinawaCanadaAnnouncedNot recorded

Source-backed project statement StarCore's undated Pinawa project page, read 13 October 2026, says that for demonstration purposes Pinawa is willing to become an off-grid community powered by the StarCore SMR, while noting residents will not directly benefit because they already have hydro power. This is a stated willingness, not a supply agreement, and StarCore's investor page describes future power purchase agreements only as its general model. StarCore: Pinawa demonstration reactor

Not found in the sources we checked. StarCore's Pinawa project page names the Local Government District of Pinawa as demonstration partner and the University of Manitoba as a research partner, and its investor page describes an own-and-operate model. Neither page names an engineering or construction contractor for the Whiteshell demonstration. StarCore: Pinawa demonstration reactor

Not found in the sources we checked. StarCore's investor page describes raising company capital through Simple Agreements for Future Equity and cites Canada's national 5 billion dollar SMR framework, and its Pinawa page estimates 600 million dollars of economic activity in eastern Manitoba. These are company financing, a national figure and an economic estimate. Neither page states a funder or amount for the Pinawa demonstration. StarCore: Pinawa demonstration reactor; StarCore: investor and technology description

Not found in the sources we checked. StarCore's investor page says its reactor uses TRISO fuel and lists a signed fuel supply agreement among company milestones, without naming the supplier or saying the agreement covers the Pinawa demonstration. No quantity or delivery for Pinawa is stated. StarCore: investor and technology description

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Not found in the sources we checked. StarCore's Pinawa demonstration page says it plans to break ground in fall 2026 and begin operations by the end of 2028, while its investor page, read in October 2026, says it is moving toward first commercial power in 2030. Neither page is dated, so the difference cannot be placed as a dated revision, but the two pages give different years for the start of operation. StarCore: Pinawa demonstration reactor; StarCore: investor and technology description

Stellaria Alvin experimental reactor (INB Alpha) at CadaracheFranceLicensing
  • Application filing entityStellaria
  • OperatorStellaria
  • Vendor for the linked designStellaria

Not found in the sources we checked. Stellaria's 23 April 2026 page says the company signed a commercial contract with Equinix, described there as a pre-order so Equinix data centers can use energy autonomy from a nuclear reactor with renewable fuel. That sentence does not name Alvin or MegAlvin. No research user or electricity buyer is named for the Cadarache experiment. Stellaria: INB Alpha programme and experimental configurations

Source-backed project statement On 23 April 2026 Stellaria said it had signed a letter of intent with the CEA for a feasibility study of an ALPHA installation at Cadarache. The described installation would house the Alvin test, a demonstration reactor and a salt fabrication facility. This is a preparatory study arrangement, not an awarded construction contract. Stellaria: INB Alpha programme and experimental configurations

Source-backed project statement Stellaria's 23 April 2026 page says a 23 million euro round had closed and would complement 10 million euros of non-dilutive France 2030 Innovative Reactors funding. The page says that money will finance the technical and regulatory studies. It does not say construction costs have been paid. Stellaria: INB Alpha programme and experimental configurations

Source-backed project statement The 23 April 2026 letter of intent describes a salt fabrication facility at Cadarache intended to supply the prototype and the demonstration reactor. ASNR records a 19 December 2025 application to create an ALPHA installation including a molten-salt fuel workshop named GLENN at CEA Cadarache, and ministry requests for more information on 16 June 2026. The workshop is applied for, not approved, and no fuel delivery is stated. Stellaria: INB Alpha programme and experimental configurations; ASNR, PRM projects and their fuel-fabrication plants

Not recorded

Comparable schedule revision not established. The 23 April 2026 page gives one date for each of three different machines: Alvin scheduled for 2030, MegAlvin by 2032 after the Alvin program, and the commercial Stellarium in 2035. Those are not two forecasts of the same milestone for the same unit. No later change to the Alvin 2030 date is stated. Stellaria: INB Alpha programme and experimental configurations

A documented comparable revision is recorded. It is not a completed source review.
Stellarium reactors for the Fos-sur-Mer integrated energy hub (2026 MoU)FranceAnnouncedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded
  • Vendor for the linked designStellaria

Not found in the sources we checked. Stellaria's 20 July 2026 page says the 16 July 2026 memorandum aims to supply competitive low-carbon energy to the large industrial companies of the Fos-sur-Mer zone, with Stellarium reactors providing electricity, industrial heat and grid services. No industrial customer, quantity or supply agreement is named. Stellaria: integrated energy hub at Fos-sur-Mer (MoU of 16 July 2026)

Source-backed project statement Stellaria's 20 July 2026 page says Unitel Group and its Énergie Hub consortium, which originated the project and describes itself as a platform for developing, financing, building and operating energy infrastructure, signed a memorandum of understanding with Stellaria on 16 July 2026 for the Fos-sur-Mer hub, including preparing a dedicated project entity. That is a non-binding development partnership, not an engineering or construction contract, and no plot or schedule is stated. Stellaria: integrated energy hub at Fos-sur-Mer (MoU of 16 July 2026)

Not found in the sources we checked. Stellaria's 20 July 2026 page says the memorandum provides for structuring the project's financing, but names no funder, amount or instrument for the Fos-sur-Mer reactors. Stellaria: integrated energy hub at Fos-sur-Mer (MoU of 16 July 2026)

Not found in the sources we checked. Stellaria's 20 July 2026 page describes Stellarium fast-spectrum molten-salt reactors but names no fuel supplier, fabrication or delivery for the Fos-sur-Mer hub. Stellaria: integrated energy hub at Fos-sur-Mer (MoU of 16 July 2026)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Stellaria's 20 July 2026 page describes a progressive, step-by-step deployment of several Stellarium reactors at Fos-sur-Mer but gives no date for any phase, so no schedule revision is shown. Stellaria: integrated energy hub at Fos-sur-Mer (MoU of 16 July 2026)

Stratek Global HTMR-100 at Zilkaats EstateSouth AfricaAnnouncedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded
  • Vendor for the linked designStratek Global

Not found in the sources we checked. Stratek Global's July 2025 Nuclear Network Africa article says Zilkaats Estate offered a site for one HTMR-100, and its chairman calls the plan more than a power solution for the Zilkaats development, but no buyer, quantity or supply agreement is stated. The estate is the land offeror, and nearby Necsa at Pelindaba is mentioned only as location context. Stratek Global: Nuclear Network Africa, July 2025

Not found in the sources we checked. Stratek Global's July 2025 article says Stratek, the vendor, will establish an SMR at Zilkaats Estate on a site the estate offered, with construction pending regulatory approval and financing. No engineering or construction contractor is named, no environmental assessment or license application is reported, and the JKDA Architects credit is for a design image, not a stated engineering contract. Stratek Global: Nuclear Network Africa, July 2025

Not found in the sources we checked. Stratek Global's July 2025 article says construction could begin within two years pending regulatory approval and financing, which shows financing was not yet in place. It states no reactor cost, funder or amount, and the R5.7 billion figure is the value of the privately owned estate. Stratek Global: Nuclear Network Africa, July 2025

Not found in the sources we checked. Stratek Global's July 2025 article says the development could potentially host a nuclear fuel facility and shows an HTMR-100 fuel ball, but it names no fuel manufacturer, quantity or supply commitment for the Zilkaats reactor. Koeberg fuel in another article of the same issue is unrelated. Stratek Global: Nuclear Network Africa, July 2025

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Stratek Global's July 2025 article gives one conditional statement, that construction could begin within two years pending regulatory approval and financing, and no calendar start date. No later source restates it, so no schedule revision is shown. Stratek Global: Nuclear Network Africa, July 2025

Studsvik new nuclear at the Nyköping home siteSwedenLicensing
  • Application filing entityStudsvik
  • OperatorStudsvik

Not found in the sources we checked. Studsvik's 25 May 2026 application release and GE Vernova's 3 September 2026 release on the initial four-unit BWRX-300 project, planned for Nyköping or Valdemarsvik, name no buyer of the power or offtake agreement. The government's June 2026 note on the state-support application names none either. Studsvik, GE Vernova Hitachi and Samsung C&T commit to advancing nuclear project

Source-backed project statement GE Vernova's 3 September 2026 release says GE Vernova Hitachi leads reactor engineering, licensing support and cost estimation, and together with Samsung C&T acts as the execution team with single-point responsibility for construction and execution of an initial four-unit BWRX-300 project planned for either Nyköping or Valdemarsvik. This is an exclusive, time-limited development agreement. The site is not chosen and there is no investment decision or permission. Studsvik, GE Vernova Hitachi and Samsung C&T commit to advancing nuclear project

Source-backed project statement GE Vernova's 3 September 2026 release says DS Investment Partners will lead the investment during the exclusivity period for the initial four-unit project, with GE Vernova's Financial Services business advising. The Swedish government said on 12 June 2026 that Studsvik AB had applied for state support covering two to four reactors at Nyköping. No amount is committed and the application is undecided. Studsvik, GE Vernova Hitachi and Samsung C&T commit to advancing nuclear project; Government of Sweden: Studsvik applies for state support (Nyköping and Valdemarsvik)

Not found in the sources we checked. GE Vernova's 3 September 2026 release describes Global Nuclear Fuel only in its company background and does not say it will supply the Nyköping or Valdemarsvik units. No fuel supplier or delivery for the project is named in the sources read. Studsvik, GE Vernova Hitachi and Samsung C&T commit to advancing nuclear project

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. Studsvik's 25 May 2026 application release aims for commercial operation of the first reactors in the 2030s, and GE Vernova's 3 September 2026 release expects the first unit of the four-unit project, at Nyköping or Valdemarsvik, in the mid-2030s. The later statement narrows the earlier one rather than moving it, and the record's events hold no revision pair. Studsvik applies to build up to 1,400 MW of new nuclear power at its home site in Nyköping; Studsvik, GE Vernova Hitachi and Samsung C&T commit to advancing nuclear project

Surry Green Energy Center SMR campus proposalUnited StatesAnnouncedNot recordedNot recordedNot recorded

Not found in the sources we checked. POWER Magazine reported on 20 August 2023 that the Surry Green Energy Center's SMRs could supply 20 to 30 data centers and hydrogen production, and that IP3's chief executive planned to sell lots to data center providers. No data center company or other buyer is named. POWER: Hydrogen production and SMRs touted for Virginia data-center hub

Not found in the sources we checked. POWER Magazine reported on 20 August 2023 that Green Energy Partners and IP3 International formed a joint venture to develop the Surry Green Energy Center. They are the project's developers, not contractors, and the article names no reactor vendor, engineering or construction contractor. Dominion appears only as operator of the neighbouring Surry plant. POWER: Hydrogen production and SMRs touted for Virginia data-center hub

Not found in the sources we checked. POWER Magazine reported on 20 August 2023 that the first phase of data centers would create a customer base that could support private investment in the SMRs, and that the venture would access private capital markets. No funder, amount or instrument for the Surry campus is stated. POWER: Hydrogen production and SMRs touted for Virginia data-center hub

Not found in the sources we checked. POWER Magazine's 20 August 2023 report says the SMRs' heat would support hydrogen production for backup generators. That is a hydrogen product, not nuclear fuel, and no nuclear fuel supplier is named for the Surry campus. POWER: Hydrogen production and SMRs touted for Virginia data-center hub

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. POWER Magazine's 20 August 2023 report says the SMRs would come in a second phase and that IP3 expected nuclear power within a decade, a single horizon. Global Energy Monitor lists the plant as shelved, inferred in June 2026, which is a status label, not a revised date. No earlier and later dates for the same milestone appear. POWER: Hydrogen production and SMRs touted for Virginia data-center hub; GEM Global Nuclear Power Tracker public map ? Surry Green Energy Center

Taftøy Aure / Heim SMR proposalNorwaySitingNot recordedNot recorded

Not found in the sources we checked. The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft: Taftøy assessment programme set by the government; Norsk Kjernekraft: locations (ten project companies); DSA, DSB and NVE: recommended assessment programme for a nuclear power plant at Taftøy næringspark, Heim and Aure

Not found in the sources we checked. The reviewed sources do not establish an additional project-specific engineering, preparatory-work or construction assignment. A supplier’s general capabilities or an industry-wide agreement do not establish a contract for this site. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft: locations (ten project companies); DSA, DSB and NVE: recommended assessment programme for a nuclear power plant at Taftøy næringspark, Heim and Aure; Norsk Kjernekraft: Taftøy assessment programme set by the government

Source-backed project statement The DSA/DSB/NVE recommendation describes Trondheimsleia Kjernekraft AS as established in partnership with the prospective host municipalities, NEAS and Norsk Kjernekraft. The cited passages state no financing commitment or amount. Partnership alone does not establish share ownership or a paid equity contribution. DSA, DSB and NVE: recommended assessment programme for a nuclear power plant at Taftøy næringspark, Heim and Aure; Norsk Kjernekraft: locations (ten project companies)

Not found in the sources we checked. The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. DSA, DSB and NVE: recommended assessment programme for a nuclear power plant at Taftøy næringspark, Heim and Aure; Norsk Kjernekraft: Taftøy assessment programme set by the government

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft: Taftøy assessment programme set by the government; DSA, DSB and NVE: recommended assessment programme for a nuclear power plant at Taftøy næringspark, Heim and Aure

Tarapur BSMR-200 lead proposalIndiaSitingNot recorded

Not found in the sources we checked. The Department of Atomic Energy's 5 August 2026 Lok Sabha answer calls the BSMR-200 a demonstration reactor and names no buyer of its power, and World Nuclear News of 10 December 2025 names none either. NPCIL's request for proposals for captive industrial use concerns the separate Bharat Small Reactor program. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)

Not found in the sources we checked. The Department of Atomic Energy's 5 August 2026 Lok Sabha answer says BARC is designing and deploying the 220 MWe BSMR-200, that in-principle approval for engineering and construction has been received and that the Atomic Energy Commission approved Tarapur as the site. These are government approvals for BARC's own demonstration. No engineering or construction contractor is named, and Indian industries are mentioned only generally for component development. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)

Not found in the sources we checked. The Department of Atomic Energy's 5 August 2026 Lok Sabha answer says the BSMR-200's proposal for administrative and financial sanction has been cleared by the Atomic Energy Commission with Empowered Technology Group approval, and counts construction time from receipt of financial approval, which it does not report. The only amount in the answer is the Rs 20,000 crore Nuclear Energy Mission provision for SMRs as a class. No sanctioned amount for Tarapur is stated. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)

Not found in the sources we checked. The Department of Atomic Energy's 5 August 2026 Lok Sabha answer describes indigenous development of BSMR-200 components and an in-house control-rod drive, and World Nuclear News of 10 December 2025 describes the design. Neither names a fuel supplier, fabrication or delivery for the Tarapur lead unit. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The Department of Atomic Energy's 5 August 2026 Lok Sabha answer gives one estimate, 60 to 72 months of construction from receipt of financial approval. World Nuclear News of 10 December 2025 described sanction as at an advanced stage, and the later answer reports the sanction proposal cleared. That is progress in approval status, not two dates for the same construction or operation milestone. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)

Tarapur SMR-55 lead proposalIndiaSitingNot recorded

Not found in the sources we checked. World Nuclear News reported on 16 October 2026 that NPCIL envisages the SMR-55 serving remote and off-grid electrification, data centers and captive industrial power. Those are intended applications. Neither that report nor DAE's 5 August 2026 Lok Sabha answer names a buyer or agreement for the Tarapur SMR-55's output. World Nuclear News: India's project milestones and SMR-55 report

Source-backed project statement World Nuclear News reported on 16 October 2026 that NPCIL announced on 1 October 2026 the release of the SMR-55 Detailed Project Report, co-developed by NPCIL and BARC, for the lead unit proposed at Tarapur. DAE's 5 August 2026 answer records in-principle approval for engineering and construction and AEC approval of Tarapur as the site. Co-developing a project report is preparatory work, not an engineering, procurement and construction award or a financial sanction. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026); World Nuclear News: India's project milestones and SMR-55 report

Not found in the sources we checked. DAE's 5 August 2026 Lok Sabha answer records in-principle approval for engineering and construction of the SMR-55 and AEC approval of Tarapur, but no financial sanction or amount for it. A Rs 20,000 crore Nuclear Energy Mission provision in the same answer covers small modular reactors as a class, not this unit. Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)

Not found in the sources we checked. World Nuclear News' 16 October 2026 report on the SMR-55 project report and DAE's 5 August 2026 answer name no fuel supplier, contract or delivery for the Tarapur SMR-55. A Nuclear Fuels Complex item in the same report concerns the heavy-water reactor fleet. World Nuclear News: India's project milestones and SMR-55 report

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The checked sources do not provide two dated statements revising the same Tarapur SMR-55 milestone. Earlier reporting of two lead units and a program target is retained separately; a later source’s omission of a unit count does not establish a schedule change. WNN: Maharashtra and Andhra Pradesh proposed for first Indian SMRs

Tata / BWXT BANR Green River, Wyoming proposalUnited StatesAnnounced
  • Vendor for the linked designBWX Technologies

Source-backed project statement Tata Chemicals North America said on 12 December 2024 that its subsidiary, Tata Chemicals Soda Ash Partners, signed a letter of intent with BWXT to explore up to eight BANR microreactors for electricity and process heat at Green River, Wyoming. The letter says the parties will develop terms to conditionally purchase the reactors and the parameters needed to turn those commitments into an energy purchase agreement. A letter of intent is not an executed purchase or a binding offtake. Tata Green River BANR letter of intent

Source-backed project statement Tata’s 12 December 2024 letter states that BWXT and TCSAP had collaborated since September 2023 on the feasibility of integrating BANR at TCSAP’s Green River, Wyoming manufacturing site. The letter expands that work to conditional-purchase terms; it is not an executed purchase or a construction award. Tata Green River BANR letter of intent

Not found in the sources we checked. The Tata letter describes work toward conditional reactor-purchase terms. It does not identify a project financing commitment or amount, and the conditional purchase is not a payment. Tata Green River BANR letter of intent

Not found in the sources we checked. The letter text that was read does not mention fuel, enrichment, a supplier, or a delivery. Design fuel described for BANR on a different project's page is not a commitment for Green River. Tata Green River BANR letter of intent

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The 12 December 2024 letter says the parties will establish milestones on a path to deploying the reactors by the early 2030s. That is one target. No earlier or later date for the same milestone appears in the letter. Tata Green River BANR letter of intent

Temelin Rolls-Royce SMRCzechiaSiting
  • Project proposerCEZ Group
Not recorded
  • Vendor for the linked designRolls-Royce SMR

Not found in the sources we checked. The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. ČEZ: Temelín SMR project advances to next phase; MPO: Czech Republic will develop further SMR sites; ČEZ additional Czech SMR locations; World Nuclear News: ČEZ submits EIA documentation for the Temelín Rolls-Royce SMR to the Ministry of the Environment

Source-backed project statement The 24 April 2026 early-works contract covers engineering and permitting preparation. It does not establish an EPC award or permission to begin reactor construction. ČEZ: Temelín SMR project advances to next phase; World Nuclear News: ČEZ submits EIA documentation for the Temelín Rolls-Royce SMR to the Ministry of the Environment

Not found in the sources we checked. The reviewed sources do not establish a project-specific financing commitment or amount. General company backing, ownership and policy support do not by themselves establish allocated or paid project funding. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. ČEZ: Temelín SMR project advances to next phase; MPO: Czech Republic will develop further SMR sites; World Nuclear News: ČEZ submits EIA documentation for the Temelín Rolls-Royce SMR to the Ministry of the Environment

Not found in the sources we checked. The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. ČEZ: Temelín SMR project advances to next phase; MPO: Czech Republic will develop further SMR sites; World Nuclear News: ČEZ submits EIA documentation for the Temelín Rolls-Royce SMR to the Ministry of the Environment; ČEZ additional Czech SMR locations

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. MPO: Czech Republic will develop further SMR sites; World Nuclear News: ČEZ submits EIA documentation for the Temelín Rolls-Royce SMR to the Ministry of the Environment; ČEZ: Temelín SMR project advances to next phase

TEPLATOR heat-only reactor for Slavutych district heatingUkraineAnnouncedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Source-backed project statement The Czech Technical University's CIIRC page of 13 July 2023 and a ČTK report of 12 July 2023 say the City of Slavutych signed, with World ThermoExport and Teploatom Service, a contract for future take-up of the TEPLATOR, making the city the first client for nuclear district heat. ČTK says the contract does not yet define when, in what quantity or on what terms the technology would be delivered, and delivery depends on the end of the war and licensing. CIIRC CTU: TEPLATOR slaví úspěch na Ukrajině; ČTK via CTU news: Jaderný Teplator z ČVUT chce v budoucnu využívat ukrajinské město

Source-backed project statement ČTK reported on 12 July 2023 that Teploatom Service will be the representative for implementing the TEPLATOR technology, with subsequent construction and management in Slavutych, and CIIRC's 13 July 2023 page calls it the official implementation representative for construction and operation of facilities in Ukraine. This is a stated implementation role under a contract that defines no timing, quantity or terms. It is not a license or a defined construction contract. ČTK via CTU news: Jaderný Teplator z ČVUT chce v budoucnu využívat ukrajinské město; CIIRC CTU: TEPLATOR slaví úspěch na Ukrajině

Not found in the sources we checked. ČTK's 12 July 2023 report quotes the head of IPC Holding, Teplator's majority owner, saying the project needs multi-source financing, that licensing alone would cost 50 to 100 million crowns and a prototype over a billion crowns. These are company-level cost estimates, and the same report says the Slavutych contract defines no terms. No funder or amount for the Slavutych unit is stated. ČTK via CTU news: Jaderný Teplator z ČVUT chce v budoucnu využívat ukrajinské město; CIIRC CTU: TEPLATOR slaví úspěch na Ukrajině

Source-backed project statement CIIRC's 13 July 2023 page quotes the TEPLATOR lead saying talks had begun with Atomremont Service, an Energoatom unit that stores, transports and unloads spent VVER-440 fuel, and says the company would play an important role in the Ukrainian TEPLATOR's nuclear fuel source. This is a prospective fuel-source partner in early negotiations. No agreement, quantity or delivery for Slavutych is stated. CIIRC CTU: TEPLATOR slaví úspěch na Ukrajině

Comparable schedule revision not established. ČTK's 12 July 2023 report says delivery to Slavutych depends on the end of the war and on licensing, which could take up to five years, and that the contract sets no delivery date. CIIRC's 13 July 2023 page and the June 2024 TEPLATOR slides give no Slavutych construction or operation year. With no dated target there is nothing to revise. ČTK via CTU news: Jaderný Teplator z ČVUT chce v budoucnu využívat ukrajinské město; R. Škoda (CTU/UWB): TEPLATOR presentation

Terra Innovatum SOLO first deployment at Rock City Admiral Parkway, ValmeyerUnited StatesSitingNot recorded
  • Vendor for the linked designTerra Innovatum

Source-backed project statement World Nuclear News reported on 16 July 2025 that Terra Innovatum's memorandum with Rock City Admiral Parkway Development foresees the SOLO reactor supplying power to businesses operating at the park, and that, pending NRC and other approvals, Terra Innovatum will supply power from the initial unit for a 15-year term with an option to 45 years. The stated recipients are the park's businesses, none named. This is a non-binding memorandum, not a signed power purchase agreement. WNN: Site named for first SOLO microreactor in US

Not found in the sources we checked. World Nuclear News reported on 16 July 2025 that Terra Innovatum signed a memorandum with Rock City Admiral Parkway Development to host the first SOLO deployment, and the NRC's pre-application page lists a Rock City site-characteristics white paper under review. A host agreement with the vendor is not a contractor appointment, and neither source names an engineering or construction contractor. WNN: Site named for first SOLO microreactor in US; NRC pre-application activities: Terra Innovatum SOLO

Not found in the sources we checked. World Nuclear News' 16 July 2025 report states no price or capital amount for the Rock City unit. Terra Innovatum's homepage gives a design-level levelised cost of 0.07 dollars per kWh and team-credential figures, which are not project funding. Terra Innovatum: SOLO micro-modular reactor

Not found in the sources we checked. The NRC's SOLO page and Terra Innovatum's homepage describe the design's fuel, low-enriched uranium at 4.95 percent for a 15-year cycle with an optional high-assay core swap. That is a design description. Neither source names a fuel supplier, quantity or delivery for the Rock City unit. NRC pre-application activities: Terra Innovatum SOLO; Terra Innovatum: SOLO micro-modular reactor

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. World Nuclear News' 16 July 2025 report gives power-supply terms but no construction or operation date for the Rock City unit, the NRC page shows pre-application activity since January 2025, and Terra Innovatum's homepage says SOLO will be commercial in 2028 without naming Rock City. No earlier and later dates for the same Rock City milestone appear. WNN: Site named for first SOLO microreactor in US; NRC pre-application activities: Terra Innovatum SOLO; Terra Innovatum: SOLO micro-modular reactor

Terrestrial Energy IMSR at Texas A&M-RELLISUnited StatesSitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Not found in the sources we checked. Texas A&M System's 4 February 2025 news quotes Terrestrial Energy's chief executive saying an IMSR at RELLIS would provide clean, firm electricity for the ERCOT grid. ERCOT is the grid, not a buyer, and neither that page nor the 18 June 2026 agreements release names a power or heat buyer or agreement. Texas A&M System Goes Nuclear

Not found in the sources we checked. Texas A&M System's 18 June 2026 release says ground-lease and research agreements give Terrestrial Energy site control of about 77 acres at RELLIS and support site characterization, environmental work and testing, and that Terrestrial opened its own engineering and project-management office there. These are a site lease and research agreements with the host and the developer's own office. The release names no engineering or construction contractor. America's Nuclear Energy Race Accelerates at Texas A&M-RELLIS

Not found in the sources we checked. Texas A&M System's 18 June 2026 release says DOE selected Terrestrial Energy for its Reactor Pilot Program and that the RELLIS agreements support work linked to its DOE partnership projects TETRA and TEFLA. Program selection and partnership projects are not stated as money for the RELLIS IMSR, and no amount, award or disbursement is given. America's Nuclear Energy Race Accelerates at Texas A&M-RELLIS

Not found in the sources we checked. Texas A&M System's 4 February 2025 and 18 June 2026 releases and the NRC's Texas A&M pre-application page name no fuel supplier, enrichment contract, allocation or delivery for the RELLIS IMSR. America's Nuclear Energy Race Accelerates at Texas A&M-RELLIS

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Texas A&M System's 4 February 2025 news says the first proving-ground reactors could be constructed within five years, a campus-level aim with no IMSR date. The NRC's pre-application page, last reviewed 15 September 2026, still shows a campus-wide early site permit submittal planned for the fourth quarter of 2025. Neither states an earlier and a later date for the same IMSR milestone. Texas A&M System Goes Nuclear; NRC pre-application activities: Texas A&M University System

Thorcon 500, Kelasa IslandIndonesiaSiting

Not found in the sources we checked. BAPETEN's 6 August 2025 press release and World Nuclear News' 5 August 2025 report describe approval of Thorcon's site evaluation program for Kelasa Island and Indonesia's national aim of 10 GW of nuclear capacity by 2040. Neither names a buyer or power purchase agreement for the Kelasa plant. WNN: regulatory approval for Indonesian Thorcon site survey; BAPETEN site-evaluation approval, Thorcon 500, Kelasa

Not found in the sources we checked. BAPETEN's 6 August 2025 press release says it approved the site evaluation program submitted by PT Thorcon Power Indonesia, the developer's subsidiary, on 21 January 2025, and World Nuclear News says the next steps are a site license and design approval. The applicant is the project's developer, and neither source names an engineering or construction contractor. BAPETEN site-evaluation approval, Thorcon 500, Kelasa; WNN: regulatory approval for Indonesian Thorcon site survey

Not found in the sources we checked. BAPETEN's 6 August 2025 press release and World Nuclear News' 5 August 2025 report state no amount, funder or financing for the Kelasa plant. BAPETEN site-evaluation approval, Thorcon 500, Kelasa; WNN: regulatory approval for Indonesian Thorcon site survey

Not found in the sources we checked. World Nuclear News' 5 August 2025 report describes the Thorcon 500 as two low-enriched-uranium-fuelled 250 MWe reactors in replaceable sealed Cans. That is a design description, and neither it nor BAPETEN's press release names a fuel supplier, contract or delivery for Kelasa. WNN: regulatory approval for Indonesian Thorcon site survey

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. World Nuclear News reported on 5 August 2025 that Thorcon saw potential to start construction in 2027 and reach full power by 2031, each stated once. BAPETEN's dates are the January 2025 application and the 30 July 2025 decision, which are licensing steps. No earlier and later dates for the same milestone appear. WNN: regulatory approval for Indonesian Thorcon site survey; BAPETEN site-evaluation approval, Thorcon 500, Kelasa

Thorizon One first commercial molten-salt reactor in ZeelandNetherlandsAnnouncedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.
  • Vendor for the linked designThorizon

Not found in the sources we checked. The Province of Zeeland's 17 April 2026 announcement says Thorizon One would supply CO2-free electricity and/or industrial heat, and Thorizon's technical paper describes the same purposes, but neither names a utility, factory or heat buyer. EPZ is discussed as a possible owner and operator, which is not a customer role. Provincie Zeeland: Zeeland in view for Europe's first commercial molten salt reactor; Thorizon: cartridge-core molten salt reactor technical paper

Source-backed project statement The Province of Zeeland's 17 April 2026 announcement says the cooperation agreement's first milestone is a non-nuclear molten-salt test facility and the Thorizon PILOT program in 2027, involving Schelde Exotech in Zeeland and VDL Groep in Noord-Brabant. Thorizon's technical paper lists company partnerships including Tractebel for engineering and Hyundai Engineering and Construction for civil structure and plant construction, without tying them to a Zeeland contract. None is a signed construction contract for Thorizon One. Provincie Zeeland: Zeeland in view for Europe's first commercial molten salt reactor; Thorizon: cartridge-core molten salt reactor technical paper

Not found in the sources we checked. Thorizon's technical paper reports company financing, a €16 million Series A led by Invest-NL in March 2025, €14 million of regional subsidies and a €10 million France 2030 grant, and the Province of Zeeland's 17 April 2026 page says regional development companies intend to invest in Thorizon and Invest-NL intends to keep supporting it. None of these is an amount allocated to building or licensing the Zeeland reactor. Thorizon: cartridge-core molten salt reactor technical paper; Provincie Zeeland: Zeeland in view for Europe's first commercial molten salt reactor

Source-backed project statement Thorizon's technical paper says Thorizon One's initial commercial target is to receive and burn plutonium and minor actinides separated by reprocessing light-water-reactor spent fuel, through collaboration with Orano and existing infrastructure mainly in France, and lists Orano as its fuel-cycle and reprocessing partner. This is a planned fuel-cycle collaboration, with no contract, quantity or delivery stated for Zeeland. Thorizon: cartridge-core molten salt reactor technical paper

Not recorded

Comparable schedule revision not established. Thorizon's technical paper targets the start of Thorizon One construction by 2032, and the Province of Zeeland's 17 April 2026 announcement dates realisation of Thorizon One in Zeeland to 2034. These are different milestones, construction start and realisation, each stated once, so they are not an earlier and a later date for the same milestone. ANVS says no Dutch initiative has yet chosen a location. Provincie Zeeland: Zeeland in view for Europe's first commercial molten salt reactor; Thorizon: cartridge-core molten salt reactor technical paper; ANVS, Small modular reactors

Thorizon PIONEER molten-salt demonstrator at NRG PALLAS, PettenNetherlandsAnnouncedNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
  • OperatorNRG PALLAS
  • Vendor for the linked designThorizon

Not found in the sources we checked. Thorizon's memorandum announcement datelined 16 April 2026 says NRG PALLAS intends to become PIONEER's owner, licensee and operator, and Thorizon's technical paper calls PIONEER a smaller non-commercial demonstrator. Neither names a buyer or user of PIONEER's power or heat. The announcement's electricity and industrial-heat uses concern the separate Thorizon One plant. Thorizon: EPZ, NRG PALLAS, provinces and investors sign MoU; Thorizon: cartridge-core molten salt reactor technical paper

Not found in the sources we checked. The April 2026 memorandum describes NRG PALLAS’s intended site, ownership, licensing and operating roles and provincial permitting and stakeholder support. These are project roles and intentions, not a named PIONEER construction or engineering award. EPZ’s prospective operator role belongs to the separate Thorizon One project. Thorizon: EPZ, NRG PALLAS, provinces and investors sign MoU; Provincie Zeeland: Zeeland in beeld voor eerste commerciële gesmoltenzoutreactor

Source-backed project statement Thorizon’s memorandum announcement, datelined 16 April 2026, says it will pursue IPCEI support for PIONEER. This is an intention, not a submitted application, award or payment. EIB financing in the same passage concerns Thorizon One. Company co-investment intentions and the whole-roadmap investment expectation are not allocated PIONEER funding. Thorizon: EPZ, NRG PALLAS, provinces and investors sign MoU; Provincie Zeeland: Zeeland in beeld voor eerste commerciële gesmoltenzoutreactor

Source-backed project statement The memorandum announcement describes Orano fuel-development collaboration and CEA materials and reactor-chemistry work in the wider Thorizon program. This is development context relevant to PIONEER, not a site-specific fuel quantity, supply contract, fabrication completion or delivery to Petten. The separate technical paper’s Thorizon One fuel wording is not transferred to PIONEER. Thorizon: EPZ, NRG PALLAS, provinces and investors sign MoU; Thorizon: cartridge-core molten salt reactor technical paper

Comparable schedule revision not established. Thorizon's 16 April 2026 announcement, the Province of Zeeland's 17 April 2026 page and Thorizon's technical paper all give 2028 for starting construction of PIONEER at NRG PALLAS in Petten, and the announcement gives 2030 for operation. The same targets restated are not a revision. The 2032 and 2034 dates in these sources belong to Thorizon One. Thorizon: EPZ, NRG PALLAS, provinces and investors sign MoU; Provincie Zeeland: Zeeland in beeld voor eerste commerciële gesmoltenzoutreactor; Thorizon: cartridge-core molten salt reactor technical paper

TMSR-LF1 thorium molten-salt experimental reactor, WuweiChinaOperatingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.

Not found in the sources we checked. The operating license names the Shanghai Institute of Applied Physics as the operator of a 2 megawatt-thermal experimental reactor. Later institute statements reported by World Nuclear News say the reactor has been generating heat and is a research platform. No buyer of heat or electricity, and no external research-service customer, is named. NNSA: TMSR-LF1 operating licence 2307; WNN: Chinese MSR achieves conversion of thorium-uranium fuel

Not found in the sources we checked. The license and the news reports say construction began in September 2018 and was reportedly completed in August 2021. They do not name an engineering or construction contractor. WNN: Chinese MSR achieves conversion of thorium-uranium fuel

Source-backed project statement World Nuclear News reported that in January 2011 the Chinese Academy of Sciences launched a 3 billion yuan research program on liquid-fluoride thorium reactors. That figure is the program, not a stated payment for construction of TMSR-LF1. No project-specific amount paid for this reactor was stated. WNN: Chinese molten-salt reactor cleared for start-up

Source-backed project statement The Shanghai Institute of Applied Physics said, as reported on 4 November 2025, that thorium was added to TMSR-LF1 in October 2024 and that thorium-uranium conversion was then achieved. The same report describes fuel enriched to under 20 percent uranium-235, about 50 kilograms of thorium, and uranium tetrafluoride. No fuel supplier or fabrication contract is named. WNN: Chinese MSR achieves conversion of thorium-uranium fuel; CPPCC News (reprinting Economic Daily): In the depths of the Gansu Gobi (13 January 2026)

Comparable schedule revision not established. World Nuclear News says construction was scheduled to finish in 2024 and was reportedly finished in August 2021. A reported completion set against an earlier target is not two forecasts of the same future milestone. No later pair of forecasts for one milestone of this reactor was stated. A 2035 demonstration aim refers to a larger reactor. WNN: Chinese MSR achieves conversion of thorium-uranium fuel

Toshiba 4S proposal at Galena, Alaska (mid-2000s)United StatesCanceled

Source-backed project statement In 18 May 2006 House testimony, Galena's city manager said the city would probably be a purchaser of raw power from the 4S plant, whose eventual owner was not named, and that the plant could serve nearby villages. That is a probable intention by the city itself, not a power purchase agreement, and the villages and mining interests mentioned are not named. The Air Force base described as the city's largest customer was leaving and bought diesel power, not 4S output. House hearing (18 May 2006): testimony of the City of Galena on the Toshiba 4S

Source-backed project statement The city manager's 18 May 2006 House testimony says the city worked with the U.S. Department of Energy in 2004 on a study of Galena's power options, and that with state funding it contracted Burns and Roe, Inc to prepare white papers for eventual NRC submittal. A Burns and Roe engineer attended as the city's nuclear engineer. These are preparatory study and licensing-support roles. No license application was filed and no construction contractor is named. House hearing (18 May 2006): testimony of the City of Galena on the Toshiba 4S; ANS: The revival of Toshiba’s 4S

Source-backed project statement The 18 May 2006 House testimony says Alaska's governor and legislature gave the city seed money to begin the white-paper process, and ANS Nuclear Newswire reported on 6 May 2026 that the legislature committed $500,000 for those white papers. The same testimony lists federal requests, $2.8 million from GNEP towards $20 million of environmental work and $2.8 million, $10.0 million and $7.2 million for FY07 to FY09 licensing, which were requests. No award or disbursement of the federal requests was read. House hearing (18 May 2006): testimony of the City of Galena on the Toshiba 4S; ANS: The revival of Toshiba’s 4S

Not found in the sources we checked. The city manager's 18 May 2006 House testimony says the 4S is designed to be fueled once for 30 years, which is a design feature, and its 700,000 gallons of barge fuel are for the existing diesel plant. Neither the testimony nor the 6 May 2026 ANS article names a fuel manufacturer, quantity or delivery for a Galena 4S. House hearing (18 May 2006): testimony of the City of Galena on the Toshiba 4S

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The 18 May 2006 House testimony aimed for operation by 2012 and printed a 2010 to 2012 availability line. ANS Nuclear Newswire's 6 May 2026 retrospective says deadlines slipped, that Galena decided in 2011 to pursue a fossil-fired plant and that NRC reviews ceased two years later, but it gives no revised operation date. No source read states an earlier and a later date for the same Galena milestone. House hearing (18 May 2006): testimony of the City of Galena on the Toshiba 4S; ANS: The revival of Toshiba’s 4S

Transformational Challenge Reactor microreactor test proposal at ORNL (2019)United StatesAnnouncedNot recordedNot recorded

Not found in the sources we checked. ORNL's August 2019 safety design strategy describes the Transformational Challenge Reactor as a DOE program to design, manufacture and briefly operate a small test reactor at Oak Ridge to demonstrate advanced manufacturing, and the 2022 ORNL paper calls it a 3 MWt test reactor. Neither names a recipient of power or heat. ORNL: Safety Design Strategy for the Transformational Challenge Reactor (ORNL/SPR-2019/1254, August 2019)

Not found in the sources we checked. ORNL's August 2019 safety design strategy says ORNL, managed by UT-Battelle for DOE, would design and manufacture the reactor, specify conventional equipment and start long-lead procurement as design constraints were finalised. No engineering, manufacturing or construction contractor for the reactor is named. ORNL: Safety Design Strategy for the Transformational Challenge Reactor (ORNL/SPR-2019/1254, August 2019)

Source-backed project statement ORNL's August 2019 safety design strategy says the DOE Office of Nuclear Energy was embarking on the Transformational Challenge Reactor program, carried out by ORNL under its DOE management contract. That makes DOE-NE the program sponsor, but no amount, budget or appropriation for the reactor is stated, and no construction or operation is established. ORNL: Safety Design Strategy for the Transformational Challenge Reactor (ORNL/SPR-2019/1254, August 2019)

Not found in the sources we checked. ORNL's August 2019 safety design strategy gives a pre-conceptual envelope of HALEU fuel as uranium carbide, oxide, nitride or mixtures, and says TRISO fuel might be selected. That is an open design choice. No fuel supplier, fabrication or delivery for the test reactor is named. ORNL: Safety Design Strategy for the Transformational Challenge Reactor (ORNL/SPR-2019/1254, August 2019)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. ORNL's August 2019 safety design strategy says the program targeted beginning start-up activities in 2023. The 2022 ORNL paper read gives no date, so no earlier and later date for the same milestone is shown, and no start-up is established. ORNL: Safety Design Strategy for the Transformational Challenge Reactor (ORNL/SPR-2019/1254, August 2019); ORNL: TCR Central Shutdown Rod Fine Motion Control (August 2022)

TVA Clinch River BWRX-300United StatesLicensing

Not found in the sources we checked. TVA's 29 September 2026 permit announcement describes TVA as a federal utility that sells electricity and says no construction date has been announced for Clinch River Unit 1. It names no buyer or allocation of the unit's output beyond TVA's general role as a power supplier. TVA construction permit announcement

Source-backed project statement World Nuclear News reported on 24 January 2025 that TVA named Bechtel, Sargent & Lundy and GE Hitachi as collaborative contractors in an integrated project team to plan, design and potentially procure, construct and commission Clinch River Unit 1, with Sargent & Lundy leading site-specific detailed design. The first phase was planning and validation. Construction was a potential later scope in that announcement, not an unconditional construction award. TVA names contractors for Clinch River SMR project - World Nuclear News

Source-backed project statement DOE announced on 2 December 2025 that it selected TVA for 400 million dollars of federal cost-shared funding to advance a BWRX-300 at Clinch River; no signed award or disbursement is shown. World Nuclear News and POWER reported in August 2024 that TVA's board approved a further 150 million dollars, for a total of 350 million dollars approved for development of potential SMRs at Clinch River, supporting planning, design and regulatory work through fiscal 2026; that is not a construction decision. After the September 2026 permit, TVA said it continues negotiations with industry partners on cost sharing; the report names no partner agreement. DOE selects TVA and Holtec to advance deployment of US SMRs (2 Dec 2025); TVA approves further funding for Clinch River SMR; TVA Boosts Nuclear Funding with $150M for SMR Development at Clinch River; WNN: First construction permit issued for BWRX-300 SMR in US

Not found in the sources we checked. The NRC construction permit, TVA's 29 September 2026 announcement, DOE's December 2025 selection and World Nuclear News' January 2025 contractor report name no fuel supplier, fabrication contract or delivery for Clinch River Unit 1. TVA construction permit announcement

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Source-backed project statement The NRC's 18 June 2026 letter says staff had planned in July 2025 to issue the final safety evaluation for TVA's Clinch River construction permit application by November 2026 and now planned to issue it by 30 June 2026. This is an accelerated regulator-review target for the same document, not a construction or operation date and not proof that the target was achieved. NRC letter: Clinch River Unit 1 construction permit application review status (ADAMS ML26160A308)

U-Battery first-of-a-kind siting bid at Chalk River (2019-2023)CanadaSiting
  • Project proposerUrenco
Not recordedNot recorded

Not found in the sources we checked. Urenco's 29 July 2019 release says U-Battery aims to replace diesel power for remote communities and off-grid sites such as northern mines. That is a general market. It names no recipient of power from a Chalk River unit. U-Battery advancing toward siting a first-of-a-kind SMR in Canada (29 Jul 2019)

Not found in the sources we checked. Urenco's 29 July 2019 release says the Urenco-led U-Battery consortium passed the first stage of Canadian Nuclear Laboratories' invitation to site an SMR at Chalk River and moved to due diligence, in which CNL would evaluate the design, finances and security. CNL is the site host running the invitation, not a contractor, and no engineering or construction contractor is named. U-Battery advancing toward siting a first-of-a-kind SMR in Canada (29 Jul 2019)

Not found in the sources we checked. Urenco's 29 July 2019 release says U-Battery received UK Advanced Modular Reactor program funding for design work, which is not Chalk River project funding. Urenco said on 20 March 2023 that it could no longer support the U-Battery project after failing to secure new commercial investors. No funding for a Chalk River unit is stated. U-Battery advancing toward siting a first-of-a-kind SMR in Canada (29 Jul 2019); Urenco statement on U-Battery (20 March 2023)

Not found in the sources we checked. Urenco's 29 July 2019 release describes Urenco, the consortium lead, as an enrichment and fuel-cycle supplier, but names no fuel supply, quantity or delivery for a Chalk River unit. Urenco's 20 March 2023 statement on ending its support concerns its fuel business generally. U-Battery advancing toward siting a first-of-a-kind SMR in Canada (29 Jul 2019)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Urenco's 29 July 2019 release and 20 March 2023 statement give no construction or operation date for a Chalk River U-Battery. The 2023 statement ended Urenco's support for the project. With no dated target there is nothing to revise. Urenco statement on U-Battery (20 March 2023)

UAMPS Carbon Free Power Project (canceled)Earlier-plan recordUnited StatesCanceledNot recorded
  • Vendor for the linked designNuScale Power

Source-backed project statement UAMPS and NuScale's 8 November 2023 release says they ended the Carbon Free Power Project because it appeared unlikely to gain enough subscription, and describes the decision as best for the UAMPS members participating in it. The intended buyers were subscribing UAMPS member utilities. The project is terminated, so no supply will occur. UAMPS and NuScale CFPP termination release

Source-backed project statement UAMPS's October 2023 project update says Fluor and NuScale provided inputs to the project's Class 2 cost estimate, then under review, as preparatory engineering for the commercial-readiness decision. On 8 November 2023 UAMPS and NuScale mutually agreed to terminate the project before any construction contract or combined license, and CFPP LLC, wholly owned by UAMPS, was the development entity. UAMPS CFPP 40th project update; UAMPS and NuScale CFPP termination release

Source-backed project statement The World Nuclear Association's US profile, updated 7 October 2026, says DOE approved a 1.335 billion dollar cost-share award over ten years in October 2020 to the UAMPS-owned Carbon Free Power Project entity for developing and building the plant. UAMPS's project page says that after termination the entity discussed the award's future and the disposition of project assets with DOE. This is a historical award to a terminated project, not current financing. World Nuclear Association — Nuclear Power in the USA; UAMPS Carbon Free Power Project archive

Not found in the sources we checked. UAMPS's project archive page and the 8 November 2023 termination release name no fuel supplier, contract or delivery for the Carbon Free Power Project. The archive page's references to the DOE cost-share award and to disposing of project assets such as long-lead equipment do not concern fuel. The project was terminated before licensing. UAMPS Carbon Free Power Project archive; UAMPS and NuScale CFPP termination release

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. UAMPS's 2 March 2022 Xcel Energy term-sheet release says the schedule anticipated the full plant commercially operating in 2030, and the project archive page says the combined license application had been on track for a January 2024 filing before the 8 November 2023 termination. These are different milestones, each stated once in the sources read, so no revision of the same milestone is shown. UAMPS Carbon Free Power Project archive; UAMPS and Xcel Energy CFPP term sheet

UCRI critical unit for the Brazilian microreactor program at IENBrazilLicensingNot recorded

Not found in the sources we checked. The critical unit is for the project's own neutronic and safety experiments. IEN says the unit will serve those experiments with ANSN accompaniment, and no outside organization is named as a buyer of electricity, heat or a research service. Diamante's undated project page describes a 5 MWe reactor for a municipality and lists data centers among its uses. That page does not name this critical unit. IEN: Brazilian microreactor programme and critical-unit responsibilities; Diamante: Brazilian microreactor development project

Source-backed project statement IRD says Diamante Geração de Energia is the proposing company, with INB and Terminus as execution partners, for a critical unit to be installed in the Argonauta building. IEN says that at this stage the institute is responsible for implantation, commissioning and operation, and that the unit is being installed in that building. No executed construction contract is shown. ANSN: Brazilian microreactor critical-unit pre-licensing meeting; IEN: Brazilian microreactor programme and critical-unit responsibilities

Source-backed project statement IEN says Finep approved financial support in March 2025 through Finep Mais Inovação. IRD states a project budget of R$50 million, of which R$30 million comes from Finep. CNEN says a political decision approved financing of R$50 million, with R$30 million from Finep through the FNDCT and R$20 million from Diamante Energia. The notices describe approval for the national project. They do not say the money has been paid or how much is for the critical unit alone. IEN: Brazilian microreactor programme and critical-unit responsibilities; ANSN: Brazilian microreactor critical-unit pre-licensing meeting; CNEN: reported licensing request for the UCRI critical unit

Not found in the sources we checked. IEN says the concept under development, about 5 MWt, would use nuclear fuel fabricated by INB, similar to fuel in Brazil's operating plants, and that the heat-pipe fluid is not yet chosen. CNEN describes the critical unit at the scale of 100 W without a thermal or electrical basis, and does not state its fuel supply. Diamante's separate page says a 5 MWe reactor would run more than ten years without refuelling, and that page does not name the critical unit. IEN: Brazilian microreactor programme and critical-unit responsibilities; CNEN: reported licensing request for the UCRI critical unit; Diamante: Brazilian microreactor development project

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. IEN says the national project lasts 36 months and that the period ends with an experimental demonstration and the first regulatory authorizations, without calendar dates. CNEN says the partners will follow steps so that by 2033 the first microreactor is ready to operate. That 2033 date is the microreactor, not a second forecast of the critical unit's 36-month demonstration. IEN: Brazilian microreactor programme and critical-unit responsibilities; CNEN: reported licensing request for the UCRI critical unit

University of Illinois KRONOS MMRUnited StatesLicensing

Not found in the sources we checked. The NRC's KRONOS application page and the university's Illinois Microreactor Project page describe a 45 MWth campus research reactor, which the university is applying to construct and operate. They name no buyer or user of its power or heat. UIUC NPRE: Illinois Microreactor Project licensing information

Source-backed project statement NANO Nuclear's October 2025 release on the start of drilling at the University of Illinois site highlights site characterization and geotechnical work performed by AECOM for the KRONOS project. This is site-investigation engineering before the construction permit application, not a construction appointment. Hatch and PCL are mentioned only as showing interest. NANO Nuclear said on 27 October 2026 that it signed a memorandum of understanding with Hyundai Engineering Co., Ltd. as a framework for potential collaboration on project-execution planning and site-related work. It says compensated work would need a separate definitive agreement, so this is not a construction appointment. NANO Nuclear Holds Milestone Ceremony to Mark Beginning of Drilling Work for First KRONOS MMR™ Energy System in Partnership with University of Illinois | NANO N; NANO Nuclear Energy (27 Oct 2026): memorandum with Hyundai Engineering on the KRONOS MMR project

Not found in the sources we checked. NANO Nuclear's October 2025 drilling release names the university, AECOM, the State of Illinois and expected strategic partners as collaborators, and the university's project page describes the license application. Neither states who pays for the reactor or any grant or amount. NANO Nuclear Holds Milestone Ceremony to Mark Beginning of Drilling Work for First KRONOS MMR™ Energy System in Partnership with University of Illinois | NANO N

Not found in the sources we checked. The NRC's KRONOS application page and the university's project page describe TRISO fuel in a ceramic matrix. The applicant's environmental report assumes that, before startup, new fuel will arrive by truck from either Richland, Washington (Framatome), or Lynchburg, Virginia (BWXT). These are assumed shipping origins for the environmental analysis; the passage does not establish a selected supplier or fabricator, a supply award, or a committed delivery. UIUC NPRE: Illinois Microreactor Project licensing information; University of Illinois KRONOS environmental report: operational activities forecast

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The developer's filings preserve a qualified wording history, without establishing a comparable schedule revision. NANO Nuclear's Form 10-K signed 18 December 2025 describes a full-scale KRONOS system expected to be fully operational and licensed by 2030. The same 10-K also says there is no definitive timeline for demonstration, licensing and commercial launch. Its Form 10-Q signed 17 February 2026 instead forecasts initial operation or research availability around 2030 to 2031, subject to NRC review, safety and environmental reviews, construction and commissioning. The forms signed 14 May and 12 August 2026 use around 2030 for that conditional initial-operation or research-availability forecast. The applicant's environmental report separately expects operational activities in approximately 2030. The different scope and approximate wording do not establish a clean delay, acceleration, current commitment or reason for a change. The earlier USNC reactor's 2026 deployment forecast concerns an earlier configuration and is not directly paired with the current KRONOS forecast; reported thermal-rating changes are separate identity facts. US university plans to build microreactor - World Nuclear News; UIUC NPRE: Illinois Microreactor Project construction permit application; NANO Nuclear Form 10-K signed 18 December 2025: KRONOS forecasts; NANO Nuclear Form 10-Q signed 17 February 2026: KRONOS forecast; NANO Nuclear Form 10-Q signed 14 May 2026: KRONOS forecast; NANO Nuclear Form 10-Q signed 12 August 2026: KRONOS forecast; University of Illinois KRONOS environmental report: operational activities forecast

USNC MMR Idaho National Laboratory demonstration proposal (2020 ARDP)United StatesAnnouncedNot recordedNot recorded

Not found in the sources we checked. World Nuclear News of 13 October 2020 says the proposed MMR Energy System at Idaho National Laboratory would demonstrate integrated energy systems with renewables, but names no user or buyer of its heat or power. The campus heating and power use described in the same article belongs to the separate University of Illinois proposal. WNN: USNC MMR proposed for Idaho and Illinois

Not found in the sources we checked. World Nuclear News of 13 October 2020 says Ultra Safe Nuclear Corporation, the proposer, planned to deploy its MMR at Idaho through a partnership with Idaho National Laboratory, the host site, under DOE's Advanced Reactor Demonstration Program. No engineering or construction contractor is named, and the Ontario Power Generation joint venture in the article concerns Chalk River. WNN: USNC MMR proposed for Idaho and Illinois

Not found in the sources we checked. World Nuclear News of 13 October 2020 says the USNC proposals were part of DOE's Advanced Reactor Demonstration Program, which offered US$160 million of initial funding for two demonstration reactors, but it does not say the Idaho MMR received an award or share. USNC's reference to private investment is company strategy, not an Idaho amount. WNN: USNC MMR proposed for Idaho and Illinois

Not found in the sources we checked. World Nuclear News of 13 October 2020 says the MMR uses USNC's proprietary FCM TRISO fuel, which is the design's fuel. No fabrication, allocation or delivery for the Idaho demonstration is stated. WNN: USNC MMR proposed for Idaho and Illinois

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. World Nuclear News of 13 October 2020 gives one target, deployment at Idaho and Illinois by 2026, and no later source read restates it. The program's five-to-seven-year horizon and USNC's 2026 manufacturing remark are different scopes, so no revision is shown. WNN: USNC MMR proposed for Idaho and Illinois

Valar Atomics Ward 250United StatesOperatingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
  • Vendor for the linked designValar Atomics

Not found in the sources we checked. Valar's Castle Country page says Ward 250 is a research reactor whose job is to test and validate, and that on 1 July 2026 it generated electricity in a live demonstration that directly powered an NVIDIA chip. DOE's 18 June 2026 article describes that reactor's zero-power criticality under the Reactor Pilot Program at the Utah San Rafael Energy Lab. Neither source names a buyer or a research-service agreement; the chip demonstration is not an offtake. Valar Atomics: Castle Country and Ward 250; DOE: Valar Atomics Ward 250 criticality

Source-backed project statement The Utah Office of Energy Development's 17 September 2025 groundbreaking release, as published by ETV News, says Valar chose Kiewit for engineering and construction, Goree for architecture and design, and Sprung for the building. POWER reported on 19 June 2026 that Kiewit Nuclear Solutions served as the engineering, procurement and construction contractor. The reactor has since operated. These are construction roles, not a later operating contract. Valar Atomics site groundbreaking reported by ETV News; POWER: Valar Atomics' Ward 250 becomes second reactor to go critical under DOE pilot program

Not found in the sources we checked. DOE's 18 June 2026 article and the 17 September 2025 groundbreaking release say Ward 250 was selected for the Reactor Pilot Program and later reached criticality under it. The 22 April 2026 environmental determination describes the research program and states no sum of money. Selection and official support are participation, not project money paid. Valar Atomics site groundbreaking reported by ETV News; DOE: Valar Atomics Ward 250 criticality; DOE categorical exclusion CX-271015 PDF: Ward250 research reactor

Not found in the sources we checked. DOE's 22 April 2026 determination says Ward 250 uses TRISO coated particle fuel, and POWER reported on 19 June 2026 that a co-located fabrication facility is designed to make such fuel. POWER also said fuel-sourcing details were not yet available. A fuel form and a described fabrication facility are not a named supplier or a delivery. DOE categorical exclusion CX-271015 PDF: Ward250 research reactor; POWER: Valar Atomics' Ward 250 becomes second reactor to go critical under DOE pilot program

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. The 17 September 2025 state release says the Reactor Pilot Program aimed for criticality of three reactors by 4 July 2026, and DOE reported Ward 250's criticality on 18 June 2026. Meeting that program aim is performance against a target. No source read states an earlier and a later forecast for the same Ward 250 milestone. Valar Atomics site groundbreaking reported by ETV News; DOE: Valar Atomics Ward 250 criticality

Valar Carbon County nuclear campus proposal (Project Beehive)United StatesSiting
  • Project proposerValar Atomics
Not recordedNot recorded

Not found in the sources we checked. The transcript of the Utah Trust Lands Administration board's 17 September 2026 meeting records staff saying power from Valar's Carbon County campus would support on-site activities such as synthetic fuels, hydrogen, desalination, data centers and steel. Those are intended uses. No buyer or agreement for the campus's power is named. Utah Trust Lands Board: automated meeting transcript, Valar Carbon County SULA 2095-OBA (17 September 2026)

Not found in the sources we checked. The Utah Trust Lands Administration board's 17 September 2026 meeting transcript records a special use lease with an option to purchase for Valar on about 640 acres in Carbon County, subject to site-plan approval and all required permits. The Trust Lands Administration is the landowner and lessor, not a contractor, and no engineering or construction contractor is named. Utah Trust Lands Board: automated meeting transcript, Valar Carbon County SULA 2095-OBA (17 September 2026)

Not found in the sources we checked. The Utah Trust Lands Administration board's 17 September 2026 meeting transcript discusses lease rent, the purchase option and the trust's own returns, which concern the land deal. No funder, amount or financing for Valar's reactors on the campus is stated. Utah Trust Lands Board: automated meeting transcript, Valar Carbon County SULA 2095-OBA (17 September 2026)

Not found in the sources we checked. The Utah Trust Lands Administration board's 17 September 2026 meeting transcript records staff saying Valar's goal is to develop, manufacture and operate a high-temperature gas-cooled reactor and that Valar also plans to manufacture TRISO fuel. It does not say where that fuel would be made or that it is for the Carbon County reactors, and no quantity or delivery is stated. Utah Trust Lands Board: automated meeting transcript, Valar Carbon County SULA 2095-OBA (17 September 2026)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The Utah Trust Lands Administration board's 17 September 2026 meeting transcript gives lease terms and permit conditions but no construction or operation date for reactors on Valar's Carbon County campus. With no dated target there is nothing to revise. Utah Trust Lands Board: automated meeting transcript, Valar Carbon County SULA 2095-OBA (17 September 2026)

VBER-300 nuclear plant project near Aktau, Mangystau (2006)Earlier-plan recordKazakhstanSuspendedNot recordedReviewed 19 Oct 2026: not disclosed in the reviewed evidence.Not recordedNot recorded

Not found in the sources we checked. The National Scientific Portal of Kazakhstan says the Kazakh-Russian joint company Atomnye Stantsii was formed in 2006 to build a plant near Aktau and prepared a feasibility study for VBER-300 reactors in Mangystau region that passed the required approvals, before work was suspended pending an intergovernmental agreement with Russia. It names no buyer of the plant's power or heat. National Scientific Portal of Kazakhstan: history of nuclear plant plans

Not found in the sources we checked. The National Scientific Portal of Kazakhstan says the Kazakh-Russian joint company Atomnye Stantsii was formed in 2006 to build a plant near Aktau and prepared a feasibility study for VBER-300 reactors in Mangystau region that passed the required approvals, before work was suspended pending an intergovernmental agreement with Russia. The joint company prepared the study itself, and no engineering or construction contractor is named. National Scientific Portal of Kazakhstan: history of nuclear plant plans

Not found in the sources we checked. The National Scientific Portal of Kazakhstan says the Kazakh-Russian joint company Atomnye Stantsii was formed in 2006 to build a plant near Aktau and prepared a feasibility study for VBER-300 reactors in Mangystau region that passed the required approvals, before work was suspended pending an intergovernmental agreement with Russia. It states no amount, funder or financing for the Aktau plant. National Scientific Portal of Kazakhstan: history of nuclear plant plans

Not found in the sources we checked. The National Scientific Portal of Kazakhstan says the Kazakh-Russian joint company Atomnye Stantsii was formed in 2006 to build a plant near Aktau and prepared a feasibility study for VBER-300 reactors in Mangystau region that passed the required approvals, before work was suspended pending an intergovernmental agreement with Russia. It names no fuel supplier or delivery for the Aktau plant. National Scientific Portal of Kazakhstan: history of nuclear plant plans

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The National Scientific Portal of Kazakhstan says the Kazakh-Russian joint company Atomnye Stantsii was formed in 2006 to build a plant near Aktau and prepared a feasibility study for VBER-300 reactors in Mangystau region that passed the required approvals, before work was suspended pending an intergovernmental agreement with Russia. It gives no construction or operation date, so no schedule revision is shown. National Scientific Portal of Kazakhstan: history of nuclear plant plans

Videberg Kraft Rolls-Royce SMR plant on the Värö peninsula (Ringhals)SwedenSiting
  • Project proposerVideberg Kraft
  • Vendor for the linked designRolls-Royce SMR

Not found in the sources we checked. Videberg Kraft's 15 June 2026 supplier announcement says three reactors could produce about 12 TWh a year for southern Sweden and support industry's transition, and the Government's 25 June 2026 release describes state loans and two-way contracts for difference. None names a buyer of the power. Industrikraft is a co-owner, not a named offtaker, and a contract for difference with the state is price support, not a sale. Videberg Kraft selects Rolls-Royce SMR as supplier for new nuclear power in Sweden; Government of Sweden: the state becomes a part-owner of Videberg Kraft

Not found in the sources we checked. Videberg Kraft's 15 June 2026 announcement says it selected Rolls-Royce SMR as supplier for three reactors on the Värö peninsula and that detailed planning will now begin. That is the selection of the reactor vendor already recorded, not a signed engineering or construction contract, and no other contractor or the independent reviewer is named. Videberg Kraft selects Rolls-Royce SMR as supplier for new nuclear power in Sweden

Source-backed project statement Sweden’s 25 June 2026 release reports Parliament’s 9 June authorization to acquire 60% of Videberg Kraft for at most SEK 1.8 billion. That is a share-purchase ceiling, not payment or reactor construction cost. Formal transfer was expected in the second half of 2027. Separate support terms involved loans, two-way contracts for difference and risk/profit sharing; European Commission review remained ahead. Government of Sweden: the state becomes a part-owner of Videberg Kraft; Government of Sweden: Videberg Kraft applies for state support

Not found in the sources we checked. Videberg Kraft's 15 June 2026 announcement describes a pressurised-water design and names no fuel supplier. The Government's 25 June 2026 release says nuclear-waste management terms were negotiated alongside the support terms, which concerns waste, not fuel supply. No fuel contract for Värö is stated. Videberg Kraft selects Rolls-Royce SMR as supplier for new nuclear power in Sweden; Government of Sweden: the state becomes a part-owner of Videberg Kraft

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The sources read date separate steps: the state-support application in December 2025, the supplier choice on 15 June 2026, the ownership decision on 25 June 2026 with share transfer expected in the second half of 2027, and an EU state-aid decision expected in autumn 2027. None gives an earlier and a later date for the same construction or operation milestone. Videberg Kraft selects Rolls-Royce SMR as supplier for new nuclear power in Sweden; Government of Sweden: the state becomes a part-owner of Videberg Kraft; Government of Sweden: Government review of new nuclear (status of applications)

West Kalimantan Rosatom floating RITM-200M proposal (2025)IndonesiaAnnounced
  • Project proposerRosatom
Not recordedNot recorded

Not found in the sources we checked. Antara's 27 February 2026 report of Rosatom's offer to the West Kalimantan government, World Nuclear News's account of later talks that included PLN's director, and the World Nuclear Association profile name no utility, mine or community as the buyer of power from a West Kalimantan floating plant. Meetings with the provincial government and PLN are not offtake agreements. Antara: Rosatom offers nuclear plant investment to West Kalimantan (27 February 2026); World Nuclear News: Indonesia and Russia discuss nuclear energy cooperation (May 2026)

Not found in the sources we checked. The World Nuclear Association profile and Antara's 27 February 2026 report describe Rosatom, the proposer, offering a floating plant to Indonesia, with Antara quoting Rosatom that the decision rests with the Indonesian government. BAPETEN's April 2026 workshop with Rosatom concerned floating-plant regulation generally. No engineering or construction contract for West Kalimantan is named. Antara: Rosatom offers nuclear plant investment to West Kalimantan (27 February 2026); BAPETEN: workshop on the regulatory framework for floating nuclear power plants with Rosatom (April 2026)

Not found in the sources we checked. Antara's 27 February 2026 report quotes Rosatom as ready to invest in West Kalimantan across the large, small and floating options it offered, while saying the decision rests with Indonesia. That is a stated readiness, not a commitment, and no amount, instrument or funder is stated for the floating plant. Antara: Rosatom offers nuclear plant investment to West Kalimantan (27 February 2026)

Not found in the sources we checked. The World Nuclear Association profile names the RITM-200M reactor model for the proposal but no fuel supplier or delivery for West Kalimantan, and its fuel-fabrication sentences concern Indonesia's research reactors. WNA Nuclear Power in Indonesia (Rosatom West Kalimantan proposals)

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. The World Nuclear Association profile says the April 2025 floating proposal was targeted for 2030 to 2031, and no later source read restates a date for it. Kommersant's May 2026 figures are national targets, and Antara gives no year, so no revision is shown. WNA Nuclear Power in Indonesia (Rosatom West Kalimantan proposals); Kommersant: Rosatom head on Indonesia negotiations (14 May 2026)

West Kalimantan Rosatom land-based SMR proposal (2025)IndonesiaAnnounced
  • Project proposerRosatom
Not recordedNot recorded

Not found in the sources we checked. The World Nuclear Association's Indonesia profile, updated 20 April 2026, says Rosatom proposed land-based SMRs of 3 x 110 MWe for West Kalimantan in April 2025, and Antara reported on 27 February 2026 that Rosatom offered large or small reactors depending on Indonesia's needs. Neither names a buyer or power purchase agreement for the land-based offer. WNA Nuclear Power in Indonesia (Rosatom West Kalimantan proposals); Antara: Rosatom offers nuclear plant investment to West Kalimantan (27 February 2026)

Not found in the sources we checked. The World Nuclear Association's Indonesia profile says Rosatom submitted the land-based SMR proposal for West Kalimantan in April 2025, and Antara reported on 27 February 2026 that Russia's ambassador was awaiting an official response from Indonesia and the province. Rosatom is the proposer, the offer has not been accepted, and neither source names an engineering or construction contractor. WNA Nuclear Power in Indonesia (Rosatom West Kalimantan proposals); Antara: Rosatom offers nuclear plant investment to West Kalimantan (27 February 2026)

Not found in the sources we checked. Antara reported on 27 February 2026 that a Rosatom representative said the company was ready to invest in West Kalimantan by bringing its technology, covering both large and small reactor options, without an amount. That is a general willingness, not a funding commitment for the land-based SMR offer. Older dollar figures in the World Nuclear Association profile concern other Indonesian concepts. Antara: Rosatom offers nuclear plant investment to West Kalimantan (27 February 2026); WNA Nuclear Power in Indonesia (Rosatom West Kalimantan proposals)

Not found in the sources we checked. The World Nuclear Association's Indonesia profile gives 3 x 110 MWe for the land-based offer, and Antara's 27 February 2026 report gives about 100 MW for a small reactor option. Neither names a fuel supplier, quantity or delivery for the West Kalimantan land-based SMRs. WNA Nuclear Power in Indonesia (Rosatom West Kalimantan proposals); Antara: Rosatom offers nuclear plant investment to West Kalimantan (27 February 2026)

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. The World Nuclear Association's Indonesia profile gives one target, 2032-2035, for Rosatom's land-based SMRs in West Kalimantan, with 2030-2031 for the separate floating offer. Antara's 27 February 2026 report gives no year. One target stated once is not a revision. WNA Nuclear Power in Indonesia (Rosatom West Kalimantan proposals); Antara: Rosatom offers nuclear plant investment to West Kalimantan (27 February 2026)

Westinghouse eVinci at Fort Drum (Army Janus)United StatesAnnounced

Not found in the sources we checked. The Army's 26 August 2026 Fort Drum article, its Janus release, Westinghouse's release and POWER's report of the same day name no buyer, quantity or power agreement for the Fort Drum eVinci. The article describes the reactor as serving installation resilience, and POWER's notes that Fort Drum gets electric service from National Grid and that the New York Power Authority is interested in siting are not offtake statements. POWER: U.S. Army mobilizes $2.2B Janus program; Army selects Fort Drum for Janus Program microreactor

Not found in the sources we checked. The Army's 26 August 2026 Fort Drum article says the Janus contract for the installation was awarded to Westinghouse Government Services, which the Army says will own, construct and operate the reactor. That is the selection of the project's own developer and intended operator. No separate engineering or construction contractor is named, and Westinghouse's own release does not name Fort Drum. Army selects Fort Drum for Janus Program microreactor; Westinghouse eVinci microreactor selected for U.S. Army Janus project

Source-backed project statement The Army's 26 August 2026 Janus release says it is awarding up to a combined $2.2 billion over fiscal years 2027 to 2031 to the five selected vendors, including Westinghouse Government Services for Fort Drum, paid only as technical milestones are met and alongside vendor capital, and the Fort Drum article says the program is funded for five years. POWER reports that the Fort Drum contract value was not disclosed, so the site amount is unknown and payments are conditional. Army reaches agreement with private industry for nuclear micro reactors; Army selects Fort Drum for Janus Program microreactor; POWER: U.S. Army mobilizes $2.2B Janus program

Not found in the sources we checked. Westinghouse's 26 August 2026 release says the eVinci is designed to run eight years without refuelling, and POWER calls it TRISO-fueled. These are design statements. No source read names a fuel supplier, fabrication contract or delivery for the Fort Drum unit. Westinghouse eVinci microreactor selected for U.S. Army Janus project

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. The Army's 26 August 2026 Fort Drum article gives a program target of 30 September 2028 for at least one microreactor producing usable electricity on an Army installation, and POWER reports that no Fort Drum schedule was disclosed. A program target stated once is not a Fort Drum date, so no revision is shown. Army selects Fort Drum for Janus Program microreactor

Westinghouse eVinci at Malmstrom Air Force Base (ANPI)United StatesSitingNot recordedNo separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.Not recorded

Not found in the sources we checked. The 23 April 2026 Westinghouse release and the 24 April 2026 World Nuclear News report name no buyer, quantity or power purchase agreement for the Malmstrom eVinci. They describe a contractor-owned and operated microreactor on an Air Force installation and energy for mission-critical operations, but the Air Force is named as host and program sponsor, not as a contracted buyer. Westinghouse eVinci microreactor selected for Malmstrom Air Force Base; WNN: US Air Force announces selections for microreactor deployments

Not found in the sources we checked. The 23 April 2026 Westinghouse release and the 24 April 2026 World Nuclear News report name no engineering or construction contractor for the Malmstrom eVinci. The release says Westinghouse Government Services, the vendor's government arm, holds the ANPI contract with the Air Force and the Defense Innovation Unit, and that Westinghouse and unnamed deployment partners will evaluate siting and construction. That is the vendor's own program selection, not a construction award. Westinghouse eVinci microreactor selected for Malmstrom Air Force Base; WNN: US Air Force announces selections for microreactor deployments

Not found in the sources we checked. The 23 April 2026 Westinghouse release calls the Malmstrom proposal the next step in an ongoing contract with the Air Force and the Defense Innovation Unit but states no value or payment, and the 24 April 2026 World Nuclear News report states no Malmstrom amount. A contractor-owned program model does not say who finances this unit. Westinghouse eVinci microreactor selected for Malmstrom Air Force Base; WNN: US Air Force announces selections for microreactor deployments

Not found in the sources we checked. The 23 April 2026 Westinghouse release and the 24 April 2026 World Nuclear News report name no fuel supplier, fabrication or delivery for the Malmstrom unit. The release's eight-plus years without refuelling is an eVinci design claim, not a fuel commitment for this base. Westinghouse eVinci microreactor selected for Malmstrom Air Force Base; WNN: US Air Force announces selections for microreactor deployments

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The 24 April 2026 World Nuclear News report gives the ANPI program aim of at least one reactor operating on an Air Force installation by 2030 or sooner, and the 23 April 2026 Westinghouse release gives no Malmstrom date. The program aim is stated once and is not a date for this unit, so no schedule revision is shown. WNN: US Air Force announces selections for microreactor deployments; Westinghouse eVinci microreactor selected for Malmstrom Air Force Base

Xuwei nuclear heating and power plant Unit 3 (HTGR)ChinaConstructionNot recorded

Source-backed project statement China Energy News reported on 27 May 2024, citing the siting-stage environmental report, that the Xuwei nuclear heating plant will supply industrial steam to the petrochemical base in Lianyungang's Xuwei New Area and use spare heat for power. Phase I is two Hualong One units and one high-temperature gas-cooled unit, so that steam role includes this unit and is not this unit alone. No individual buyer or steam contract is named. China Energy News: Jiangsu Xuwei nuclear heating plant Phase I

Source-backed project statement World Nuclear News reported on 13 August 2026 that a consortium won the conventional-island construction contract for all three Phase I units in September 2025, so unit 3's conventional island sits inside a three-unit award. The same report says CNNC planned to procure the unit 3 high-temperature reactor engineering contract from CNNC Energy Technology, with a shareholder review set for 17 August 2026. That procurement is a plan, not a confirmed award, and it is separate from the Shidaowan demonstration. WNN: CNNC to procure contract for high-temperature reactor

Source-backed project statement China Energy News reported on 27 May 2024 that Phase I, two Hualong One units and one high-temperature gas-cooled unit, is jointly invested by China National Nuclear Power, Lianyungang Jinlian Energy Investment and Jiangsu Guoxin Group in shares of 51, 29 and 20 percent. No amount paid is stated. A 13 August 2026 report of an RMB 10.3 billion estimate for the proposed unit 3 engineering contract is a cost estimate still subject to an agreement, not money paid. China Energy News: Jiangsu Xuwei nuclear heating plant Phase I; WNN: CNNC to procure contract for high-temperature reactor

Not found in the sources we checked. The 13 August 2026 procurement report, NNSA's June 2025 and 2026 unit 3 notices, and the 27 May 2024 project report describe the high-temperature unit's role, contract plan and licensing. None names a fuel supplier, fabricator or delivery for unit 3. WNN: CNNC to procure contract for high-temperature reactor; NNSA: Xuwei nuclear heating and power plant Phase I Unit 3 construction licence review launched; China Energy News: Jiangsu Xuwei nuclear heating plant Phase I

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. World Nuclear News reported on 13 August 2026 that first concrete for the unit 3 high-temperature reactor was expected by the end of 2026. NNSA's September 2026 inspection was still a pre-concrete check and does not state a second date. NNSA's 2 November 2026 construction license lets the company begin that pour and gives no date for it. One stated target is not a revision, and unit 1's January 2026 concrete belongs to a different unit. WNN: CNNC to procure contract for high-temperature reactor; NNSA: Xuwei Unit 3 pre-construction inspection report; NNSA construction licence 国核安证字第2621号: Xuwei nuclear heating and power plant Phase I Unit 3

Yakutia land-based RITM-200N (Ust-Kuyga)RussiaLicensing
  • Vendor for the linked designRosatom
  • Prospective customer / offtaker (binding offtake not established)Seligdar

Source-backed project statement World Nuclear News reported on 21 January 2022 that Rusatom Overseas and Seligdar signed an agreement to supply and consume energy from a RITM-200N plant for the Kyuchus deposit, for 40 years from mid-2028, with Seligdar using at least 35 MW. The report gives no price and is not the agreement text, so it is not treated as a confirmed binding offtake. Rosatom's 2 February 2024 release names Rosenergoatom as technical customer and operating organization, which is a project role, not this electricity buyer. That release says the station is meant to supply the Kyuchus development and does not restate the Seligdar quantity. WNN: Deal signed for nuclear to power Russian gold mine; Atom Media: Rosenergoatom receives operating-organisation status for the Yakutia plant (2 February 2024)

Source-backed project statement The 27 February 2026 hearings report names Rosatom's Engineering Division as general designer and general construction contractor in its sentence on the unit 1 and unit 2 siting materials. Rosatom's 2 February 2024 release names Rusatom Overseas as the developer, Rosenergoatom as the operating organization, and OKBM Afrikantov and the State Specialized Design Institute as co-executors. These are stated roles, not a priced award and not a statement that operation has begun. The 2024 developer is not called the general construction contractor in that release. Atomnaya energiya 2.0: hearings on Yakutia SMR units 1 and 2; Atom Media: Rosenergoatom receives operating-organisation status for the Yakutia plant (2 February 2024)

Not found in the sources we checked. Snob reported on 6 August 2021 that Rosatom and the Yakutia government agreed in December 2020 on principles for an electricity tariff, and that report states no tariff and no payment. The 21 January 2022 supply report states a 40-year term and a minimum quantity and no price. The 21 April 2023 siting report, Rosatom's 2 February 2024 release, and the 27 February 2026 hearings report also state no project sum. Snob: Rostekhnadzor allows a Rosatom company to build small reactors for the Yakutia NPP (6 August 2021); WNN: Deal signed for nuclear to power Russian gold mine; Strana Rosatom: Yakutia siting licence reported (21 April 2023); Atom Media: Rosenergoatom receives operating-organisation status for the Yakutia plant (2 February 2024); Atomnaya energiya 2.0: hearings on Yakutia SMR units 1 and 2

Not found in the sources we checked. Rosatom's 23 May 2024 release and the 27 February 2026 hearings report say fuel for the small plant is needed once every five years. That interval is not a named supplier, a delivery, or a fuel contract. The 2 February 2024 release and the 21 April 2023 siting report do not add a fuel commitment. Icebreaker reactors cited as operating experience are not a fuel supply for this plant. Atom Media: Yakutia SMR environmental-expert conclusion reported (23 May 2024); Atomnaya energiya 2.0: hearings on Yakutia SMR units 1 and 2; Atom Media: Rosenergoatom receives operating-organisation status for the Yakutia plant (2 February 2024); Strana Rosatom: Yakutia siting licence reported (21 April 2023)

No project-specific fuel supply arrangement is recorded as a structured fact.

Comparable schedule revision not established. Strana Rosatom on 21 April 2023 quotes a plan to commission the first land-based RITM-200N station in 2028, and Rosatom's 2 February 2024 release again says commissioning of the first land-based small station is planned for 2028. The 27 February 2026 hearings report says commissioning of the object is planned for 2031, in an article about siting materials for units 1 and 2. The 2031 sentence does not say whether that date is unit 1, the first unit, or both units, so no revision of one milestone is shown. Snob's 6 August 2021 report says project completion was planned for 2028, which is a different word from commissioning and is not paired as the same milestone. Strana Rosatom: Yakutia siting licence reported (21 April 2023); Atom Media: Rosenergoatom receives operating-organisation status for the Yakutia plant (2 February 2024); Atomnaya energiya 2.0: hearings on Yakutia SMR units 1 and 2; Snob: Rostekhnadzor allows a Rosatom company to build small reactors for the Yakutia NPP (6 August 2021); WNN: Deal signed for nuclear to power Russian gold mine

Yantai nuclear seawater desalination project (NHR200-I, 2003)Earlier-plan recordChinaAnnouncedNot recordedNot recordedNot recorded

Not found in the sources we checked. Tsinghua University INET's NHR200 page says the Shandong nuclear seawater desalination project received state approval of its proposal in March 2003, and INET's 2019 INPRO slides list a Yantai nuclear desalination project established in 2003. Neither names a recipient of the project's water or heat. INET, Tsinghua University: NHR200 low-temperature heating reactor page; INET presentation to IAEA INPRO: NHR200-I project list (2019)

Source-backed project statement A September 2005 IAEA desalination newsletter article by a Tsinghua University author names Tsinghua University's Institute of Nuclear and New Energy Technology (INET) as engineering contractor for the planned Shandong nuclear desalination demonstration plant, whose feasibility study began in March 2003. That is an engineering role during study, not a construction contract, and no construction contractor is named. IAEA INDAG Newsletter No. 5 (September 2005)

Not found in the sources we checked. Tsinghua University INET's NHR200 page records state approval of the Shandong desalination project's proposal in March 2003 but states no funder, investment or financing. INET, Tsinghua University: NHR200 low-temperature heating reactor page

Not found in the sources we checked. Tsinghua University INET's NHR200 page and 2019 INPRO slides describe the NHR200 reactor line and list the Yantai project but name no fuel supplier or delivery for it. INET presentation to IAEA INPRO: NHR200-I project list (2019)

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. Tsinghua University INET's NHR200 page dates only the March 2003 state approval of the Shandong desalination project's proposal, and the 2019 INPRO slides only its 2003 establishment. No construction or operation target is given, so there is nothing to revise. INET, Tsinghua University: NHR200 low-temperature heating reactor page

ZE PAK–SGE Pątnów BWRX-300 proposalPolandAnnounced
  • Project proposerZE PAK
  • Project proposerSGE S.A.
Not recordedNot recorded

Not found in the sources we checked. ZE PAK's 13 October 2026 current report and 14 October 2026 release describe the Pątnów BWRX-300 project as a stable source for Eastern Greater Poland and for Polish industry, but name no utility, factory, heat customer or offtake quantity. ZE PAK is the landowner and minority shareholder and SGE the managing partner, neither of which is an offtake role. ZE PAK: shareholders’ agreement with SGE for Pątnów SMRs

Not found in the sources we checked. ZE PAK's 13 October 2026 current report says SGE, a proposer, will be managing partner of the planned project company after competition approvals, and that SGE's BWRX-300 rights from GE Vernova Hitachi will pass to that company. Those are ownership and technology-rights arrangements, not engineering or construction appointments. No contractor is named, and the 2021 cooperation with MS Innovation Impulse was not finalised. ZE PAK current report 28/2026: Pątnów SMR shareholders’ agreement; ZE PAK current report: SMR cooperation agreement referencing Pątnów

Source-backed project statement The 13 October 2026 agreement sets a PLN 300 million net sale price for the prepared-site component, reducible by up to PLN 50 million depending on preparation costs, payable in instalments during 2028–2030. If agreed milestones are met within five years of the project company’s incorporation, PAK SMR can sell its shares in that project company to SGE for EUR 100 million. These are conditional transaction terms, not reactor construction cost or payments. Formation of the project company remains subject to competition approvals. ZE PAK current report 28/2026: Pątnów SMR shareholders’ agreement; ZE PAK current report: SMR cooperation agreement referencing Pątnów; ZE PAK: shareholders’ agreement with SGE for Pątnów SMRs

Not found in the sources we checked. ZE PAK's 2021 and 2026 reports and its 14 October 2026 release name the BWRX-300 technology and SGE's license rights but no fuel supplier, enrichment, allocation or delivery for the Pątnów units. The release's only mention of fuel refers to past energy and fuel crises. ZE PAK current report 28/2026: Pątnów SMR shareholders’ agreement; ZE PAK: shareholders’ agreement with SGE for Pątnów SMRs

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. ZE PAK's 13 October 2026 current report gives one schedule, sale-price instalments from 2028 to 2030 when the prepared land is due to pass to the project company. The 14 October 2026 release's 2030 and December 2033 dates belong to Darlington and Tennessee. No construction or operation target for Pątnów is stated, and no date is revised. ZE PAK current report 28/2026: Pątnów SMR shareholders’ agreement; ZE PAK: shareholders’ agreement with SGE for Pątnów SMRs

ZettaJoule ZJ0 research reactor at Texas A&M (TEES)United StatesAnnouncedNot recordedReviewed 20 Oct 2026: not disclosed in the reviewed evidence.Not recorded

Not found in the sources we checked. Texas A&M Engineering's 26 February 2026 release lists possible research pathways such as hydrogen, steelmaking and data centers, and classes of possible research funders, but names no buyer or user of heat or power from the ZJ0 research reactor. World Nuclear News of 27 February 2026 names none either. Texas A&M Engineering Experiment Station and ZettaJoule sign agreement

Not found in the sources we checked. Texas A&M Engineering's 26 February 2026 release says the Texas A&M Engineering Experiment Station signed an agreement with ZettaJoule to explore building the ZJ0 research reactor next to its Nuclear Engineering and Science Center, with ZettaJoule to build it and the station to own it. ZettaJoule is the reactor developer, so this is not a separate contractor appointment, and no engineering or construction contractor is named. Texas A&M Engineering Experiment Station and ZettaJoule sign agreement; WNN: Transformative research reactor mooted for Texas A&M

Not found in the sources we checked. Texas A&M Engineering's 26 February 2026 release says the project could catalyse up to US$1 billion in research collaborations, industrial partnerships and federal funding over the next decade. That is a potential research-funding outcome, not money raised or committed to build the ZJ0 reactor, and no funder or amount for construction is named. Texas A&M Engineering Experiment Station and ZettaJoule sign agreement; WNN: Transformative research reactor mooted for Texas A&M

Not found in the sources we checked. World Nuclear News of 27 February 2026 and the Texas A&M release say ZettaJoule's design is based on Japan's HTTR test reactor, which is the design basis. Neither names a fuel manufacturer, enrichment, quantity or delivery for the College Station reactor. WNN: Transformative research reactor mooted for Texas A&M; Texas A&M Engineering Experiment Station and ZettaJoule sign agreement

No project-specific fuel supply arrangement is recorded as a structured fact.
Not recorded

Comparable schedule revision not established. The 26 February 2026 Texas A&M release and the 27 February 2026 World Nuclear News report describe the same exploratory agreement and give no construction or operation date for the ZJ0 reactor, only a ten-year horizon for potential research funding. No revision is shown. Texas A&M Engineering Experiment Station and ZettaJoule sign agreement; WNN: Transformative research reactor mooted for Texas A&M

Research coverage for the 222 matching projects: of 1998 answers to nine review questions, 878 have a supported statement, 973 were reviewed with a stated limit and 147 are not reviewed yet. This counts recorded research, not readiness or the likelihood of construction.

Coverage by question

Each project is asked the same nine questions: five commercial questions and four reader questions. Only completed source reviews are counted. A supported statement can describe a conditional plan or preparatory work; read it on the project page. Not disclosed, not applicable, conflicting evidence and source unavailable are reviewed limits. Not reviewed is unfinished research, not a finding that nothing exists. The counts cover every page of matching projects, not only the page shown or the projects chosen for comparison.

QuestionSupported statementNot disclosedNot applicableConflicting evidenceSource unavailableNot reviewedProjects
Customer or offtaker551620005222
Contractor721440015222
Funding811370004222
Project fuel commitment371800005222
Comparable schedule revision161960604222
Permissions and public process180350106222
Site dependencies (land, grid, water)187290105222
Spent fuel, waste and closure7540312101222
Next decision and prerequisites17525100012222
All nine questions87894813931471998