Compare projects or designs
Choose two to four records. Electrical and thermal output, capacity basis and module/plant scope remain separate. Unknown values are never zero.
Start with an example
Explore the records with these examples, not rankings or a representative sample. These links open the current records.
What permission is recorded for each project?
Two United States sites: compare the activity each decision covers, not just the stage label.
Read “Permissions and public process” and “Next decision and prerequisites” in the comparison. Open each project record for its supporting sources and qualifications.
Compare Long Mott Generating Station (Xe-100 at Dow Seadrift) and TVA Clinch River BWRX-300
Individual records: Long Mott Generating Station (Xe-100 at Dow Seadrift) · TVA Clinch River BWRX-300.
Does the same design mean the same permission?
These projects link to the same design profile in different countries. A design review does not authorize a site, and licensing requirements differ by country.
Read “Permissions and public process” and “Next decision and prerequisites” in the comparison. Open each project record for its supporting sources and qualifications.
Compare Darlington BWRX-300 Unit 1 and TVA Clinch River BWRX-300
Individual records: Darlington BWRX-300 Unit 1 · TVA Clinch River BWRX-300.
Project comparisons include who is involved (proposer or applicant, customer, contractor, public funding and agreements) and the linked design’s fuel as its source states it, followed by the reviewed answers on permissions and public process, site dependencies, spent fuel and waste, and the next decision, or a note that they are not yet reviewed. Design comparisons include fuel form and enrichment as stated, with the catalog date where the profile comes from a dated catalog. Fuel descriptions are quoted, not grouped into classes. Who is involved across all projects.
You can also choose projects while filtering the project list or Who is involved; your filtered view is kept for the way back.
What does a milestone actually show?
A target is a plan, not an achieved step. Read the dated source and the scope of each development:
- Application or permission? Filing an application or starting a review does not grant permission. A decision covers only the activity it names: a site or environmental decision is not automatically permission to build or operate.
- Design or project? A design review does not authorize a particular site. National program readiness is different again; the IAEA Milestones Approach is not a project licensing checklist.
- Testing or operation? Construction, commissioning tests, grid connection and commercial operation are different steps. One does not prove the next is complete.
Requirements and sequences differ by country. Compare the named activity and its source, not just a stage label. How to read permissions · Schedule changes and targets.
On narrow screens, scroll the comparison sideways to see each selection.
Cite or share this page
SMRMap. “Selected SMR records”. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/compare.html (accessed [date]). Data license CC BY 4.0.
Reopening a comparison link shows the current records, not a saved version. Source references below are the listed sources, not a claim-by-claim verification. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF to retain what you read.
Browse the source-linked records below. Interactive comparison is available when JavaScript loads.
Projects
- Aalo commercial proposal at Texas A&M-RELLIS — Siting · United States · SMR
- Aalo fleet proposal at Idaho Falls Power's Energy Research Park — Announced · United States · Microreactor
- Aalo Project Ascension power-reactor proposal at INL — Announced · United States · SMR
- Aalo-X at Idaho National Laboratory — Commissioning · United States · Microreactor
- ACR-300 SMR proposal at Atucha (Meitner Energy) — Announced · Argentina · SMR
- AEP Joshua Falls SMR proposal — Siting · United States · SMR
- AEP Rockport BWRX-300 proposal — Announced · United States · SMR
- Akademik Lomonosov floating NPP — Operating · Russia · SMR
- ALFRED lead-cooled demonstrator at Mioveni (EAGLES-300 program) — Announced · Romania · SMR
- Amazon, AEP and X-energy Xe-100 plant at the former Breed station (Indiana) — Announced · United States · SMR
- Ameren / Westinghouse SMR proposal at Callaway (2012) — Announced · United States · SMR
- Ameresco–Terrestrial Energy IMSR at Aberdeen Proving Ground — Announced · United States · SMR
- Antares Mark-0 at Idaho National Laboratory — Commissioning · United States · Microreactor
- Antares Mark-1 electricity-producing microreactor at INL — Announced · United States · Microreactor
- Antares microreactor at Joint Base San Antonio (ANPI) — Siting · United States · Microreactor
- Antares R1 microreactor siting at INL's Central Facilities Area — Siting · United States · Microreactor
- Antares R1 microreactors at Fort Bragg (Army Janus) — Announced · United States · Microreactor
- ARC-100 first-of-a-kind deployment framework at Idaho National Laboratory — Announced · United States · SMR
- ARC-100 proposal at the Port of Belledune Green Energy Hub — Announced · Canada · SMR
- B&W mPower plan at TVA's Clinch River site (2013-2017) — Canceled · United States · SMR
- Baim / Cape Nagloynyn floating PEB-106 (RITM-200S) — Construction · Russia · SMR
- BARC Visakhapatnam HTGCR hydrogen demonstration proposal — Siting · India · SMR
- BaRupOn's anticipated KRONOS MMR deployment at its Liberty, Texas campus (feasibility stage) — Announced · United States · Microreactor
- BATAN/BRIN RDE experimental reactor at Serpong (PeLUIt-40 predecessor) — Suspended · Indonesia · SMR
- Beck Creek Energy SMR proposal (Amherst County) — Announced · United States · SMR
- Belledune Prodigy transportable nuclear proposal — Announced · Canada · Microreactor
- Blue Energy BWRX-300 at Port of Victoria — Licensing · United States · SMR
- BlueCore BC-15 floating plant proposal at the Port of Long Beach — Siting · United States · SMR
- Blykalla SEALER Norrsundet / Gävle proposal — Licensing · Sweden · SMR
- Blykalla SEALER study at Hörby (withdrawn) — Canceled · Sweden · SMR
- Blykalla SEALER Untra / Tierp proposal — Licensing · Sweden · SMR
- BREST-OD-300 Seversk — Construction · Russia · SMR
- BWXT BANR at Fort Campbell (Army Janus) — Announced · United States · Microreactor
- Calogena NetZeroHeat CAL30 heat reactor for Pierrelatte — Announced · France · Microreactor
- Calogena nuclear heating plant at CEA Cadarache — Siting · France · Microreactor
- Cambridge Atomworks ODIN prototype at Berkeley Green — Announced · United Kingdom · Microreactor
- CAREM-25 — Suspended · Argentina · SMR
- Cascade Advanced Energy Facility — Siting · United States · SMR
- Centrica / X-energy Xe-100 plant at Hartlepool — Announced · United Kingdom · SMR
- CGN Bohai ACPR50S floating SMR demonstration proposal — Announced · China · SMR
- CNEC / Zheneng Sanmen HTGR power station — Siting · China · SMR
- CNNC floating SMR demonstration proposal (2016) — Announced · China · SMR
- Community Nuclear Power North Teesside AP300 proposal — Announced · United Kingdom · SMR
- Copenhagen Atomics critical experiment at the Paul Scherrer Institute — Siting · Switzerland · SMR
- Cwmni Egino small modular reactor proposal at Trawsfynydd — Deferred · United Kingdom · SMR
- Daegu i-SMR proposal at the Gunwi industrial complex — Deferred · South Korea · SMR
- Dalane / Lund SMR proposal — Siting · Norway · SMR
- Daqing NHR-200 nuclear heating plant (1990s) — Licensing · China · SMR
- Darlington BWRX-300 Unit 1 — Construction · Canada · SMR
- Darlington BWRX-300 Units 2-4 — Siting · Canada · SMR
- Deep Atomic MK60 AI data-center campus proposal at INL — Announced · United States · SMR
- Deep Fission Gravity pilot, Parsons — Siting · United States · SMR
- Deployable Energy Unity at Idaho National Laboratory — Commissioning · United States · Microreactor
- Deployable Energy Unity full-power test in INL's DOME (2027) — Siting · United States · Microreactor
- Deployable Energy–Hornbeck Unity maritime demonstration proposal — Announced · United States · Microreactor
- Dimitrovgrad SVBR-100 pilot proposal (2013 land lease) — Canceled · Russia · SMR
- Dominion North Anna SMR proposal — Announced · United States · SMR
- Dual Fluid critical demonstration experiment in Rwanda — Licensing · Rwanda · SMR
- Duke Belews Creek technology-neutral SMR proposal — Licensing · United States · SMR
- Elementl Letart Township BWRX-300 proposal — Siting · United States · SMR
- Energoatom / Holtec Rivne SMR-160 proposal (MoU-era) — Announced · Ukraine · SMR
- Energoatom SMR at the Trypilska thermal plant site — Announced · Ukraine · SMR
- eVinci DOME nuclear test reactor — Canceled · United States · Microreactor
- Fensfjorden Kjernekraft SMR proposal near Mongstad (Austrheim and Alver) — Siting · Norway · SMR
- Fermi Energia Estonian BWRX-300 plant — Siting · Estonia · SMR
- First American Nuclear EAGL-1 energy park in Indiana (site not disclosed) — Announced · United States · SMR
- First ELENA-AM thermoelectric heating pilot proposal — Announced · Russia · SMR
- Floating nuclear power unit for Gazprom's Kirinskoye fields, Sakhalin — Announced · Russia · SMR
- Formosa commercial CAREM proposal (2010 agreement) — Siting · Argentina · SMR
- GE Hitachi PRISM plutonium-reuse proposal at Sellafield (not taken forward) — Canceled · United Kingdom · SMR
- General Atomics GA-TES at Fort Hood (Army Janus) — Announced · United States · Microreactor
- Global First Power Chalk River MMR (paused) — Suspended · Canada · Microreactor
- Grenland Kjernekraft SMR proposal at Herre, Bamble — Siting · Norway · SMR
- GS Energy NuScale SMR proposal at Uljin nuclear hydrogen complex — Announced · South Korea · SMR
- Halden Kjernekraft SMR proposal at Femsjøen — Siting · Norway · SMR
- HAPPY200 nuclear heating project at Baishan, Jilin — Announced · China · SMR
- Helen nuclear energy program plant in Helsinki — Siting · Finland · SMR
- Hexana first SMR in the Gard rhodanien area — Announced · France · SMR
- Holtec / EDF SMR-300 proposal at Cottam — Announced · United Kingdom · SMR
- Holtec Green River / Blue Castle, Utah proposal — Announced · United States · SMR
- Holtec Oyster Creek SMR proposal — Announced · United States · SMR
- Holtec Pioneer Units 1 and 2 (SMR-300 at Palisades) — Licensing · United States · SMR
- Holtec SMR-160 proposal at Savannah River Site (2012) — Announced · United States · SMR
- Holtec SMR-300 proposal in Brigham City, Utah — Announced · United States · SMR
- HTGR-POLA research reactor (NCBJ) — Announced · Poland · SMR
- HTR-10 high-temperature gas-cooled test reactor, Tsinghua INET — Operating · China · SMR
- HTR-PM Shidaowan demonstration — Operating · China · SMR
- HTTR test reactor with planned hydrogen coupling, Oarai — Operating · Japan · SMR
- Huakun One floating reactor platform demonstration at the Taipingling site — Siting · China · SMR
- Huaneng Xiapu 600 MW HTGR unit (site plan) — Announced · China · SMR
- Huizhou HuaPeng-1 heating demonstration proposal — Siting · China · SMR
- Hyperion / Gen4 Module proposal at Savannah River Site (2012) — Announced · United States · SMR
- Idaho State University / NuCube Advanced Research and Test Reactor — Siting · United States · Microreactor
- Jimmy Cristanol Bazancourt heat microreactor proposal — Licensing · France · Microreactor
- Kairos commercial proposal at Texas A&M-RELLIS — Siting · United States · SMR
- Kairos Hermes 1 — Construction · United States · SMR
- Kairos Hermes 2 — Construction · United States · SMR
- Kaliningrad floating small nuclear plants proposal — Announced · Russia · SMR
- Keravan Energia / Steady Energy nuclear district-heating plant — Announced · Finland · SMR
- KHNP SMR at the Gijang-gun candidate site (11th Basic Plan) — Siting · South Korea · SMR
- Kuopion Energia small nuclear district-heating plant — Siting · Finland · SMR
- Kärnfull Next SMR park at Målma, Valdemarsvik — Licensing · Sweden · SMR
- Last Energy first commercial PWR-20 site, Caldwell County — Licensing · United States · Microreactor
- Last Energy first KSSE plant proposal — Announced · Poland · Microreactor
- Last Energy Haskell County PWR-20 campus — Siting · United States · Microreactor
- Last Energy Llynfi PWR-20 proposal — Siting · United Kingdom · Microreactor
- Last Energy London Gateway PWR-20 proposal — Announced · United Kingdom · Microreactor
- Last Energy PWR-20 demonstrator at RATEN Mioveni (2022 plan) — Announced · Romania · Microreactor
- Last Energy PWR-5 pilot at Texas A&M-RELLIS — Construction · United States · Microreactor
- Last Energy ten-SMR plant for the Legnica Special Economic Zone (2022) — Announced · Poland · Microreactor
- LEANDREA lead-cooled demonstrator at SCK CEN Mol (EAGLES-300 program) — Announced · Belgium · SMR
- Liaoyuan DHR-400 heating demonstration proposal — Announced · China · SMR
- Linglong One (ACP100) Changjiang — Commissioning · China · SMR
- Lister Kjernekraft SMR proposal (Lyngdal and Farsund) — Siting · Norway · SMR
- Long Mott Generating Station (Xe-100 at Dow Seadrift) — Licensing · United States · SMR
- Maoming Green Energy HTGR proposal (Phase 1 planning) — Announced · China · SMR
- MARVEL microreactor test bed at INL's TREAT facility — Construction · United States · Microreactor
- Meta–TerraPower initial dual-unit Natrium proposal — Announced · United States · SMR
- Microreactor at Naval Weapons Station Crane — Announced · United States · Microreactor
- Midpoint SMR Project #1 (Sawtooth / SEDC, Jerome County) — Announced · United States · SMR
- Moltex SSR-W at Point Lepreau — Announced · Canada · SMR
- Myanmar 110 MW SMR project (two RITM-200N; site not named) — Announced · Myanmar · SMR
- NANO Nuclear microreactors for Digihost's North Tonawanda power plant (2024 MOU) — Announced · United States · Microreactor
- Narvik Kjernekraft SMR plant proposal at Fornes, Ballangen — Siting · Norway · SMR
- Natrium Kemmerer Unit 1 — Construction · United States · SMR
- Natura MSR-1 demonstration at Abilene Christian University — Construction · United States · SMR
- Natura MSR-100 proposal at Texas A&M-RELLIS — Siting · United States · SMR
- NB Power ARC-100 at Point Lepreau — Licensing · Canada · SMR
- Necsa SMR demonstration reactor at Pelindaba — Announced · South Africa · SMR
- newcleo / JAVYS LFR-AS-200 study at Bohunice V1 — Siting · Slovakia · SMR
- newcleo LFR-AS-30 at Beaumont-en-Véron / Savigny-en-Véron — Siting · France · SMR
- Next Generation Nuclear Plant prototype HTGR at INL (2005-2013) — Suspended · United States · SMR
- Nine Mile Point Gen III+ SMR early site permit evaluation — Announced · United States · SMR
- Ningdu multipurpose modular proposal (14th Five-Year plan) — Announced · China · SMR
- Norilsk land small nuclear plant (RITM-400) — Announced · Russia · SMR
- Norsk Kjernekraft SMR proposal in Vardø — Siting · Norway · SMR
- Northern Halmahera floating nuclear power units (Rosatom, two FPU-100) — Announced · Indonesia · SMR
- Nuclea Morpheus test reactor siting at the Utah San Rafael Energy Lab — Announced · United States · Microreactor
- Nuclear Power Ghana and Regnum NuScale VOYGR-12 plant (site not disclosed) — Announced · Ghana · SMR
- NuCube test microreactor at the Utah San Rafael Energy Lab — Announced · United States · Microreactor
- NuScale plant proposal at Savannah River Site (2012) — Announced · United States · SMR
- NuScale VOYGR Doicești (Romania) — Licensing · Romania · SMR
- Oklo Aurora at Eielson AFB (DAF microreactor pilot) — Siting · United States · Microreactor
- Oklo Aurora campus, Pike County, Ohio — Siting · United States · Microreactor
- Oklo Aurora power for Diamondback Energy near Midland, Texas (2024 LOI) — Announced · United States · Microreactor
- Oklo Aurora-INL — Construction · United States · Microreactor
- OSGE Dąbrowa Górnicza BWRX-300 proposal — Siting · Poland · SMR
- OSGE Kraków / Nowa Huta BWRX-300 proposal — Siting · Poland · SMR
- OSGE Ostrołęka BWRX-300 proposal — Siting · Poland · SMR
- OSGE Stalowa Wola BWRX-300 — Siting · Poland · SMR
- OSGE Stawy Monowskie BWRX-300 — Siting · Poland · SMR
- OSGE Warsaw potential BWRX-300 location (2023 list) — Announced · Poland · SMR
- OSGE Wloclawek BWRX-300 — Siting · Poland · SMR
- Otrera precursor (first demonstration) reactor at CEA Marcoule — Announced · France · SMR
- PBMR demonstration power plant at Koeberg (terminated) — Canceled · South Africa · SMR
- Penn State FRONTIER eVinci research proposal — Announced · United States · Microreactor
- Project Pele (INL microreactor demonstration) — Construction · United States · Microreactor
- Project TETRA / TETRA-1 pilot at Texas A&M RELLIS — Announced · United States · SMR
- Pupuk Kaltim nuclear-powered ammonia study at Bontang — Announced · Indonesia · SMR
- Purdue / Duke Energy SMR feasibility study for the Purdue campus — Announced · United States · SMR
- Pylon / LOKI MMR experiment proposal for INL's DOME — Announced · United States · Microreactor
- Radiant Kaleidos Buckley Space Force Base proposal — Siting · United States · Microreactor
- Radiant Kaleidos demonstration at INL DOME — Commissioning · United States · Microreactor
- Radiant Kaleidos microreactors at Fort Benning (Army Janus) — Announced · United States · Microreactor
- RITM-200N Jizzakh — Construction · Uzbekistan · SMR
- Rolls-Royce SMR Dětmarovice candidate location — Siting · Czechia · SMR
- Rolls-Royce SMR Tušimice candidate location — Siting · Czechia · SMR
- Rolls-Royce SMR Wylfa — Siting · United Kingdom · SMR
- Ruijin HTR nuclear power proposal (Jiangxi) — Announced · China · SMR
- RUTA-70 reference heating unit proposal at IPPE, Obninsk (2004) — Announced · Russia · SMR
- SaskPower Rafferty SMR (Estevan area) — Siting · Canada · SMR
- SEALER power plant proposal in Longyearbyen, Svalbard — Siting · Norway · SMR
- SGP Industria Rolls-Royce SMR plant (2024 decision in principle) — Suspended · Poland · SMR
- Shandong Haiyang integrated small reactor demonstration project (heat only) — Siting · China · SMR
- Shearwater NuScale Wylfa feasibility proposal (2021) — Announced · United Kingdom · SMR
- Shelf-M small nuclear plant at the Sovinoe deposit, Chukotka — Siting · Russia · SMR
- Shenyang 2 x 200 MW nuclear heating project (NHR200-I, 2001) — Canceled · China · SMR
- SINAP small modular thorium molten-salt research reactor (10 MWe), Minqin — Siting · China · SMR
- SPIC Jiamusi nuclear heating demonstration (Hongxing site) — Siting · China · SMR
- SRC initial eVinci demonstration proposal (canceled) — Canceled · Canada · Microreactor
- Standard Power NuScale SMR facility in Ohio (site not disclosed) — Announced · United States · SMR
- Standard Power NuScale SMR facility in Pennsylvania (site not disclosed) — Announced · United States · SMR
- StarCore demonstration reactor at the Whiteshell Laboratories site, Pinawa — Announced · Canada · SMR
- Stellaria Alvin experimental reactor (INB Alpha) at Cadarache — Licensing · France · SMR
- Stellarium reactors for the Fos-sur-Mer integrated energy hub (2026 MoU) — Announced · France · SMR
- Stratek Global HTMR-100 at Zilkaats Estate — Announced · South Africa · SMR
- Studsvik new nuclear at the Nyköping home site — Licensing · Sweden · SMR
- Surry Green Energy Center SMR campus proposal — Announced · United States · SMR
- Taftøy Aure / Heim SMR proposal — Siting · Norway · SMR
- Tarapur BSMR-200 lead proposal — Siting · India · SMR
- Tarapur SMR-55 lead proposal — Siting · India · SMR
- Tata / BWXT BANR Green River, Wyoming proposal — Announced · United States · Microreactor
- Temelin Rolls-Royce SMR — Siting · Czechia · SMR
- TEPLATOR heat-only reactor for Slavutych district heating — Announced · Ukraine · SMR
- Terra Innovatum SOLO first deployment at Rock City Admiral Parkway, Valmeyer — Siting · United States · Microreactor
- Terrestrial Energy IMSR at Texas A&M-RELLIS — Siting · United States · SMR
- Thorcon 500, Kelasa Island — Siting · Indonesia · SMR
- Thorizon One first commercial molten-salt reactor in Zeeland — Announced · Netherlands · SMR
- Thorizon PIONEER molten-salt demonstrator at NRG PALLAS, Petten — Announced · Netherlands · SMR
- TMSR-LF1 thorium molten-salt experimental reactor, Wuwei — Operating · China · SMR
- Toshiba 4S proposal at Galena, Alaska (mid-2000s) — Canceled · United States · SMR
- Transformational Challenge Reactor microreactor test proposal at ORNL (2019) — Announced · United States · Microreactor
- TVA Clinch River BWRX-300 — Licensing · United States · SMR
- U-Battery first-of-a-kind siting bid at Chalk River (2019-2023) — Siting · Canada · Microreactor
- UAMPS Carbon Free Power Project (canceled) — Canceled · United States · SMR
- UCRI critical unit for the Brazilian microreactor program at IEN — Licensing · Brazil · Microreactor
- University of Illinois KRONOS MMR — Licensing · United States · Microreactor
- USNC MMR Idaho National Laboratory demonstration proposal (2020 ARDP) — Announced · United States · Microreactor
- Valar Atomics Ward 250 — Operating · United States · Microreactor
- Valar Carbon County nuclear campus proposal (Project Beehive) — Siting · United States · SMR
- VBER-300 nuclear plant project near Aktau, Mangystau (2006) — Suspended · Kazakhstan · SMR
- Videberg Kraft Rolls-Royce SMR plant on the Värö peninsula (Ringhals) — Siting · Sweden · SMR
- West Kalimantan Rosatom floating RITM-200M proposal (2025) — Announced · Indonesia · SMR
- West Kalimantan Rosatom land-based SMR proposal (2025) — Announced · Indonesia · SMR
- Westinghouse eVinci at Fort Drum (Army Janus) — Announced · United States · Microreactor
- Westinghouse eVinci at Malmstrom Air Force Base (ANPI) — Siting · United States · Microreactor
- Xuwei nuclear heating and power plant Unit 3 (HTGR) — Construction · China · SMR
- Yakutia land-based RITM-200N (Ust-Kuyga) — Licensing · Russia · SMR
- Yantai nuclear seawater desalination project (NHR200-I, 2003) — Announced · China · SMR
- ZE PAK–SGE Pątnów BWRX-300 proposal — Announced · Poland · SMR
- ZettaJoule ZJ0 research reactor at Texas A&M (TEES) — Announced · United States · SMR
- Øygarden / Alver SMR proposal — Siting · Norway · SMR