Designs

216 designs; 95 are linked to tracked projects. Readable labels for reactor types; acronyms are expanded. Tracked project counts refer to this dataset only. Which regulators have reviewed, approved or permitted each design. Guides: How small reactor types work · Reactor vessels to scale. See where SMR designs come from: which countries' designs are proposed or built in which others.

Electrical (We, kWe, MWe) and thermal (Wth, kWth, MWth) ratings stay in separate columns with their recorded basis; neither is converted into the other. Ratings are per module unless marked plant. “—” means not recorded, never zero.

Fuel form and enrichment are quoted as the design’s sources state them, with the catalog date where one is recorded. They describe the design, not a fuel contract, current availability or suitability for a site.

Search also matches the fuel form and enrichment wording each design's sources state, such as TRISO or HALEU; it does not group designs into fuel classes. Coolant and Neutron spectrum use the recorded values, and Not recorded lists designs where the value is unknown. Class follows the label a design's sources use, not a size band, so designs of the same output can have different classes.

Showing 216 of 216 designs

DesignDeveloperReactor type, coolant and fuelClassOutput and scopeTracked projects
ElectricalThermal
4SToshiba Energy Systems & Solutions CorporationSodium-cooled fast reactor (SFR)Coolant: Sodium · Spectrum: FastFuel (as stated): Metal fuel (U-Zr alloy)Catalog profile as of 14 Feb 2025SMR——1
A-HTR-100EskomHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalFuel (as stated): pebble bed with coated particle fuelCatalog profile as of 14 Feb 2025SMR——None tracked here
Aalo pod (commercial proposal)Aalo AtomicsOther (see description)Coolant: Sodium · Spectrum: ThermalFuel (as stated): UO₂ ceramicEnrichment (as stated): 8 % LEU+SMR10 MWe (gross/net unspecified) · module—1
Aalo-1Aalo AtomicsOther (see description)Coolant: Sodium · Spectrum: ThermalFuel (as stated): UO₂ ceramicEnrichment (as stated): 8 % LEU+Microreactor10 MWe (gross/net unspecified) · module—1
Aalo-XAalo AtomicsOther (see description)Coolant: Other (see description) · Spectrum: ThermalFuel (as stated): Sponsor-owned low-enriched uranium dioxide (UO2) fuel pinsEnrichment (as stated): 4.95% enriched UO2Microreactorthermal only (no MWe)10 Wth (zero-power limit) · module1
ABV-6EAfrikantov OKBMIntegral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: ThermalFuel (as stated): UO2Catalog profile as of 17 Oct 2024SMR——None tracked here
ABV-6MAfrikantov OKBMIntegral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: ThermalSMR6 MWe (gross/net unspecified) · module14 MWth (nameplate; basis unspecified) · moduleNone tracked here
ACP100 (Linglong One)China National Nuclear CorporationIntegral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: ThermalSMR125 MWe (gross) · module385 MWth (nameplate; basis unspecified) · module1
ACP100SCNNC / NPICIntegral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: ThermalFuel (as stated): UO2Catalog profile as of 17 Oct 2024SMR——1
ACPR100China General Nuclear Power GroupOther (see description)Coolant: Not recorded · Spectrum: Not recordedSMR——None tracked here
ACPR50SChina General Nuclear Power GroupPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalFuel (as stated): UO2 pellet / 17x17 squareCatalog profile as of 14 Feb 2025SMR——1
ACR-300INVAPPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalSMR300 MWe (gross/net unspecified) · module—1
AHWR-300Bhabha Atomic Research CentreOther (see description)Coolant: Light water · Spectrum: ThermalSMR304 MWe (gross) · module920 MWth (nameplate; basis unspecified) · moduleNone tracked here
ALFRED lead-cooled fast-reactor demonstratorRATENLead-cooled fast reactor (LFR)Coolant: Lead · Spectrum: FastFuel (as stated): MOXCatalog profile as of 20 Aug 2021SMR——1
ALLEGRO gas-cooled fast-reactor demonstratorÚJV ŘežGas-cooled fast reactor (GFR)Coolant: Helium · Spectrum: FastSMR0 MWe (thermal only) · module75 MWth (nameplate; basis unspecified) · moduleNone tracked here
Allseas HTGRAllseasHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalSMR25 MWe (gross/net unspecified) · module70 MWth (nameplate; basis unspecified) · moduleNone tracked here
Alvin experimental molten-salt reactorStellariaMolten salt reactor (MSR)Coolant: Molten salt · Spectrum: Not recordedSMR—200 kWth (nameplate; basis unspecified) · module1
AMRSTL Nuclear (Pty) LtdHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalFuel (as stated): LEU UO2Catalog profile as of 17 Oct 2024Microreactor——None tracked here
Antares Mark-0Antares NuclearOther (see description)Coolant: Other (see description) · Spectrum: ThermalFuel (as stated): TRISOEnrichment (as stated): 19.75 wt%Microreactornone (zero-power test; no power conversion)no measurable output (zero-power test)1
AP300Westinghouse Electric CompanyPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalFuel (as stated): UO2 fuel / 17x17 square latticeSMR300 MWe (gross/net unspecified) · module900 MWth (nameplate; basis unspecified) · module1
Apollo A-10Apollo Atomics, Inc.Integral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: ThermalSMR10 MWe (gross/net unspecified) · module—None tracked here
ARC Generator (ARC Reactor)Alpha Tech Research CorpMolten salt reactor (MSR)Coolant: Molten salt · Spectrum: Not recordedMicroreactor—30 MWth (nameplate; basis unspecified) · moduleNone tracked here
ARC-100ARC Clean TechnologySodium-cooled fast reactor (SFR)Coolant: Sodium · Spectrum: FastSMR100 MWe (net) · module286 MWth (nameplate; basis unspecified) · module3
ARCHEOSARCHEOS SAS, CEAOther (see description)Coolant: Light water · Spectrum: ThermalSMRthermal only (no MWe)100 MWth (nameplate; basis unspecified) · moduleNone tracked here
ATGORNIKIETOther (see description)Coolant: Not recorded · Spectrum: Not recordedSMR——None tracked here
AuroraOklo Inc.Sodium-cooled fast reactor (SFR)Coolant: Sodium · Spectrum: FastFuel (as stated): metal fuelEnrichment (as stated): HALEU, recycled fuel or other qualified fuelsMicroreactor——4
BALDER experimental configurationCopenhagen AtomicsMolten salt reactor (MSR)Coolant: Molten salt · Spectrum: Not recordedSMR——1
BANDIKEPCO E&CPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalFuel (as stated): UO2Catalog profile as of 9 Sep 2024SMR——None tracked here
BARC Compact High Temperature Reactor (CHTR)Bhabha Atomic Research CentreOther (see description)Coolant: Lead bismuth · Spectrum: Not recordedFuel (as stated): TRISO coated particle fuelCatalog profile as of 2013SMR—100 kWth (nameplate; basis unspecified) · moduleNone tracked here
BARC high-temperature gas-cooled hydrogen reactorBhabha Atomic Research CentreHigh-temperature gas-cooled reactor (HTGR)Coolant: Not recorded · Spectrum: Not recordedSMRthermal only (no MWe)up to 5 MWth (nameplate; basis unspecified) · module1
BARC SMR-55Bhabha Atomic Research CentrePressurized water reactor (PWR)Coolant: Not recorded · Spectrum: Not recordedSMR55 MWe (gross/net unspecified) · module—1
Bharat Small Modular Reactor (BSMR-200)Bhabha Atomic Research CentrePressurized water reactor (PWR)Coolant: Light water · Spectrum: Not recordedFuel (as stated): UO2Enrichment (as stated): < 5%SMR220 MWe (gross/net unspecified) · module760 MWth (nameplate; basis unspecified) · module1
Blossom Energy SMRBlossom EnergyHigh-temperature gas-cooled reactor (HTGR)Coolant: Not recorded · Spectrum: ThermalSMR——None tracked here
Blue CapsuleBlue Capsule TechnologyOther (see description)Coolant: Sodium · Spectrum: ThermalFuel (as stated): Prismatic, TRISO with UO2 kernelCatalog profile as of 14 Feb 2025SMR——None tracked here
BlueCore BC-15BlueCore EnergyPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalSMR15 MWe (gross) · module45 MWth (nameplate; basis unspecified) · module1
BREST-OD-300NIKIETLead-cooled fast reactor (LFR)Coolant: Lead · Spectrum: FastFuel (as stated): mixed uranium-plutonium mononitride (U-Pu)NEnrichment (as stated): up to 14.5%SMR300 MWe (gross) · module700 MWth (nameplate; basis unspecified) · module1
BWRX-300GE Vernova Hitachi Nuclear EnergyBoiling water reactor (BWR)Coolant: Light water · Spectrum: ThermalSMR300 MWe (net) · module870 MWth (nameplate; basis unspecified) · module18
BWXT BANRBWX TechnologiesHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalFuel (as stated): TRISO-coated fuel particlesEnrichment (as stated): 19.75%Microreactor—75 MWth (nameplate; basis unspecified) · module3
CAL-30CalogenaPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalFuel (as stated): UO2 rods / 17x17 fuel assembliesCatalog profile as of 14 Feb 2025Microreactor——1
CAP150Shanghai Nuclear Engineering Research and Design Institute (SNERDI)Integral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: ThermalSMR150 MWe (gross/net unspecified) · module450 MWth (nameplate; basis unspecified) · moduleNone tracked here
CAP200Shanghai Nuclear Engineering Research and Design Institute (SNERDI)Pressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalSMR—660 MWth (nameplate; basis unspecified) · moduleNone tracked here
CAREM-25CNEA (Argentina)Integral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: ThermalFuel (as stated): UO2 pelletEnrichment (as stated): 3.1% for the CAREM25 prototype, as given by CNEA in the 2024 IAEA catalog.SMR25 MWe (net) · module100 MWth (nameplate; basis unspecified) · module1
CLEAR-M10INEST / FDS, Chinese Academy of SciencesLead-cooled fast reactor (LFR)Coolant: Lead · Spectrum: FastFuel (as stated): UO2Enrichment (as stated): Ave. 18.5%Catalog profile as of 2020SMR——None tracked here
CMSRSaltfoss EnergyMolten salt reactor (MSR)Coolant: Molten salt · Spectrum: ThermalFuel (as stated): LEU / molten salt fuelCatalog profile as of 14 Feb 2025SMR——None tracked here
Copenhagen Atomics Waste BurnerCopenhagen AtomicsMolten salt reactor (MSR)Coolant: Molten salt · Spectrum: ThermalFuel (as stated): 7LiF-UF4 or 7LiF-ThF4-(TRU)F3Catalog profile as of 15 Oct 2024SMR——None tracked here
CR-100Research Centre ŘežPressurized water reactor (PWR)Coolant: Light water · Spectrum: Not recordedSMR—100 MWth (nameplate; basis unspecified) · moduleNone tracked here
Daratha 10 MWe microreactor conceptDaratha AtomicsIntegral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: ThermalMicroreactor10 MWe (gross/net unspecified) · module32 MWth (nameplate; basis unspecified) · moduleNone tracked here
DAVID SMRWitkowitz AtomicaPressurized water reactor (PWR)Coolant: Light water · Spectrum: Not recordedSMR50 MWe (gross/net unspecified) · module175 MWth (nameplate; basis unspecified) · moduleNone tracked here
DEER (Deployable Electric Energy Reactor)—Pressurized water reactor (PWR)Coolant: Light water · Spectrum: Not recordedSMR——None tracked here
DF-CDE critical demonstration experimentDual Fluid EnergyOther (see description)Coolant: Not recorded · Spectrum: Not recordedFuel (as stated): liquid-metallic fuelSMR——1
DF300Dual Fluid EnergyLead-cooled fast reactor (LFR)Coolant: Lead · Spectrum: FastSMR——None tracked here
DFBR-1Deep FissionPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalFuel (as stated): uranium-oxide ceramic fuelEnrichment (as stated): LEU, less than 5% U-235Catalog profile as of 14 Feb 2025SMR——None tracked here
EAGL-1First American NuclearLead-cooled fast reactor (LFR)Coolant: Lead bismuth · Spectrum: FastSMR240 MWe (gross/net unspecified) · module600 MWth (nameplate; basis unspecified) · module1
EAGLES-300EAGLES-300 consortiumLead-cooled fast reactor (LFR)Coolant: Lead · Spectrum: FastSMR300 MWe (gross/net unspecified) · module—None tracked here
ELECTRA-FORTE—Other (see description)Coolant: Not recorded · Spectrum: Not recordedSMR——None tracked here
ELENANRC “Kurchatov Institute”Integral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: ThermalFuel (as stated): UO2 or MOXCatalog profile as of 17 Oct 2024Microreactor——None tracked here
ELENA-AMNRC “Kurchatov Institute”Other (see description)Coolant: Light water · Spectrum: Not recordedSMR——1
ELYON-5EE Capital, LLCOther (see description)Coolant: Other (see description) · Spectrum: Not recordedMicroreactor5 MWe (gross/net unspecified) · module—None tracked here
EM2General AtomicsGas-cooled fast reactor (GFR)Coolant: Helium · Spectrum: FastFuel (as stated): UCCatalog profile as of 14 Feb 2025SMR——None tracked here
EmberForge AtomicsPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalSMR25 MWe (gross/net unspecified) · module—None tracked here
Energy WellResearch Centre ŘežFluoride-salt-cooled high-temperature reactor (FHR)Coolant: Molten salt · Spectrum: ThermalFuel (as stated): TRISOCatalog profile as of 14 Feb 2025Microreactor—20 MWth (nameplate; basis unspecified) · moduleNone tracked here
ENHS (Encapsulated Nuclear Heat Source)University of California, Berkeley, Lawrence Livermore National LaboratoryLead-cooled fast reactor (LFR)Coolant: Lead bismuth · Spectrum: FastSMR50 MWe (gross/net unspecified) · module125 MWth (nameplate; basis unspecified) · moduleNone tracked here
eVinciWestinghouse Electric CompanyOther (see description)Coolant: Other (see description) · Spectrum: Not recordedFuel (as stated): UCO TRISOMicroreactor5 MWe (gross/net unspecified) · module—5
FBNRFURGSIntegral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: ThermalFuel (as stated): CERMET (Coated UO2 fuel embedded in a zirconium matrix which is further coated in a zirconium protective layerCatalog profile as of 1 Jun 2024SMR——None tracked here
FLEXMoltexFLEXMolten salt reactor (MSR)Coolant: Molten salt · Spectrum: ThermalFuel (as stated): Molten salt fuel within vented fuel tubesCatalog profile as of 14 Feb 2025SMR——None tracked here
FlexblueNaval Group (formerly DCNS)Pressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalSMR160 MWe (gross/net unspecified) · module530 MWth (nameplate; basis unspecified) · moduleNone tracked here
FMRGeneral AtomicsGas-cooled fast reactor (GFR)Coolant: Helium · Spectrum: FastFuel (as stated): UO2Catalog profile as of 14 Feb 2025SMR——None tracked here
FUJIInternational Thorium Molten-Salt Forum (ITMSF)Molten salt reactor (MSR)Coolant: Molten salt · Spectrum: ThermalFuel (as stated): LiF-BeF2-ThF4-233UF4 (71.76-16-12-0.24 mol%)Catalog profile as of 14 Oct 2024SMR——None tracked here
G4MGen4 Energy Inc.Lead-cooled fast reactor (LFR)Coolant: Lead bismuth · Spectrum: FastFuel (as stated): Uranium nitrideCatalog profile as of 1 Jun 2024SMR——1
GA-TESGeneral AtomicsOther (see description)Coolant: Lead · Spectrum: Not recordedFuel (as stated): UZrHEnrichment (as stated): HALEUMicroreactorapproximately 5 MWe (net) · module—1
Global First Power Micro Modular ReactorGlobal First PowerHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: Not recordedMicroreactor—up to 45 MWth (nameplate; basis unspecified) · module1
GravityDeep FissionPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalFuel (as stated): conventional LEU PWR fuelEnrichment (as stated): LEUSMRup to 15 MWe (gross/net unspecified) · module—1
GREMNIKIETOther (see description)Coolant: Other (see description) · Spectrum: FastSMR——None tracked here
GT-MHRAfrikantov OKBMHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalFuel (as stated): UO2 or PuO2Catalog profile as of 17 Oct 2024SMR——None tracked here
GTHTR300Japan Atomic Energy AgencyHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalFuel (as stated): UO2 TRISO ceramic coated particleCatalog profile as of 14 Feb 2025SMR——None tracked here
Hadron HaloHadron EnergyIntegral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: ThermalEnrichment (as stated): LEU+ in NRC and Hadron descriptions. Hadron’s April 2026 release specifies no more than 8.0 wt% U-235.Microreactor10 MWe (gross/net unspecified) · module35 MWth (nameplate; basis unspecified) · moduleNone tracked here
HAPPY200State Power Investment CorporationPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalFuel (as stated): UO2 / Square 17x17Catalog profile as of 14 Feb 2025SMR——1
HARPIATerminus R&D in Energy S.A.Other (see description)Coolant: Other (see description) · Spectrum: Not recordedMicroreactor—15 MWth (nameplate; basis unspecified) · moduleNone tracked here
HECTARKorea Atomic Energy Research InstituteHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalSMR——None tracked here
HeFASToÚJV ŘežGas-cooled fast reactor (GFR)Coolant: Helium · Spectrum: FastSMR—200 MWth (nameplate; basis unspecified) · moduleNone tracked here
Hermes / KP-FHRKairos PowerFluoride-salt-cooled high-temperature reactor (FHR)Coolant: Molten salt · Spectrum: ThermalFuel (as stated): TRISO fuel particles in carbon-matrix pebblesEnrichment (as stated): High Assay Low Enriched Uranium (HALEU)SMR—35 MWth (nameplate; basis unspecified) · module2
HEXANAHEXANASodium-cooled fast reactor (SFR)Coolant: Sodium · Spectrum: FastFuel (as stated): MOXCatalog profile as of 14 Feb 2025SMR——1
HOLOS-MONOHolosGen LLCHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalFuel (as stated): Qualified TRISO UCO compactsCatalog profile as of 17 Oct 2024Microreactor——None tracked here
HOLOS-QUADHolosGen LLCHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalFuel (as stated): Qualified TRISO-UCO compactsCatalog profile as of 16 Oct 2024Microreactor——None tracked here
Holtec SMR-160Holtec InternationalPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalFuel (as stated): UO2 pellet / square arraySMR160 MWe (gross/net unspecified) · module525 MWth (nameplate; basis unspecified) · module2
Holtec SMR-300Holtec InternationalPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalFuel (as stated): UO2 pellet / square arraySMR300 MWe (net) · module—5
HTGR-POLANational Centre for Nuclear ResearchHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalSMR——1
HTMR-100Stratek Global, STL Nuclear (Pty) LtdHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalFuel (as stated): TRISO particles in pebbles; LEU/ThCatalog profile as of 14 Feb 2025SMR35 MWe (gross/net unspecified) · module—1
HTR-10INET, Tsinghua UniversityHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalFuel (as stated): spherical elements with TRISO particles (UO2 kernel)Catalog profile as of 17 Oct 2024SMR—10 MWth (nameplate; basis unspecified) · module1
HTR-PM—High-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalSMR210 MWe (gross) · plant (two reactor modules)500 MWth (nameplate; basis unspecified) · plant (two reactor modules)1
HTR-PM600China National Nuclear CorporationHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalSMR——1
HTR50SJapan Atomic Energy AgencyHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalSMR——None tracked here
HTTRJapan Atomic Energy AgencyHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalFuel (as stated): UO2 TRISO ceramic coated particleCatalog profile as of 14 Feb 2025SMR—30 MWth (nameplate; basis unspecified) · module1
Huakun One floating reactor platformChina General Nuclear Power GroupPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalSMR50 MWe (gross/net unspecified) · module200 MWth (nameplate; basis unspecified) · module1
HuaPeng-1China General Nuclear Power GroupOther (see description)Coolant: Light water · Spectrum: Not recordedSMRthermal only (no MWe)—1
i-SMRi-SMR Development Agency, KHNP and KAERIIntegral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: ThermalFuel (as stated): UO2 pellet / 17 X 17 squareCatalog profile as of 14 Feb 2025SMR——1
IMSR (Integral Molten Salt Reactor)Terrestrial EnergyMolten salt reactor (MSR)Coolant: Molten salt · Spectrum: ThermalFuel (as stated): Molten salt fuelEnrichment (as stated): Standard Assay Low-Enriched Uranium (SALEU), under 5% uranium-235 (issuer specification, not delivered fuel).SMR——3
JAY-1Canadian Strategic Missions CorporationOther (see description)Coolant: Not recorded · Spectrum: Not recordedMicroreactor——None tracked here
Jereh Micro Reactor (JMR)—Molten salt reactor (MSR)Coolant: Not recorded · Spectrum: Not recordedMicroreactor—10 MWth (nameplate; basis unspecified) · moduleNone tracked here
JH-100 (Junhe One)Shanghai JHATOM Atomic TechnologyPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalSMR100 MWe (gross/net unspecified) · module—None tracked here
Jimmy Fermi heat microreactorJimmyHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalFuel (as stated): UCO TRISO particles packed into pelletsMicroreactorthermal only (no MWe)20 MWth (nameplate; basis unspecified) · module1
KAIST ATOMKorea Advanced Institute of Science and Technology (KAIST)Pressurized water reactor (PWR)Coolant: Light water · Spectrum: Not recordedSMR—450 MWth (nameplate; basis unspecified) · moduleNone tracked here
KAIST Micro Modular Reactor (MMR)Korea Advanced Institute of Science and Technology (KAIST)Other (see description)Coolant: Other (see description) · Spectrum: FastMicroreactor—36 MWth (nameplate; basis unspecified) · moduleNone tracked here
KaleidosRadiant IndustriesHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: Not recordedFuel (as stated): TRISOEnrichment (as stated): 19.75%Microreactor1.2 MWe (gross/net unspecified) · module3.5 MWth (nameplate; basis unspecified) · module4
KARAT-100NIKIETBoiling water reactor (BWR)Coolant: Light water · Spectrum: ThermalSMR100 MWe (gross/net unspecified) · module360 MWth (nameplate; basis unspecified) · moduleNone tracked here
KARAT-45NIKIETBoiling water reactor (BWR)Coolant: Light water · Spectrum: ThermalSMR—180 MWth (nameplate; basis unspecified) · moduleNone tracked here
KLT-40SRosatomPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalSMR35 MWe (gross) · module150 MWth (nameplate; basis unspecified) · module1
KP-FHR commercial plantKairos PowerFluoride-salt-cooled high-temperature reactor (FHR)Coolant: Molten salt · Spectrum: ThermalFuel (as stated): TRISO particles in graphite pebble matrix / pebble bedSMR140 MWe (gross/net unspecified) · module320 MWth (nameplate; basis unspecified) · module1
KRONOS MMRNANO Nuclear EnergyHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalFuel (as stated): UCO TRISO particles in annular ceramic-matrix pelletsEnrichment (as stated): 9.9-20% (developer, as stated)Microreactor—45 MWth (nameplate; basis unspecified) · module2
Last Energy PWR-5Last EnergyPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalMicroreactor5 MWe (gross/net unspecified) · module19.5 MWth (nameplate; basis unspecified) · module1
LDR-50Steady EnergyPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalSMRthermal only (no MWe)up to 50 MWth (nameplate; basis unspecified) · module1
LEADIR-PS100Northern Nuclear Industries IncorporatedOther (see description)Coolant: Lead · Spectrum: Not recordedSMR39 MWe (gross/net unspecified) · module100 MWth (nameplate; basis unspecified) · moduleNone tracked here
LEUNRCanadian Strategic Missions CorporationPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalMicroreactor——None tracked here
LFR-AS-200newcleoLead-cooled fast reactor (LFR)Coolant: Lead · Spectrum: FastFuel (as stated): MOXCatalog profile as of 14 Feb 2025SMR——1
LFR-AS-30newcleoLead-cooled fast reactor (LFR)Coolant: Lead · Spectrum: FastSMR——1
LFR-TL-30newcleoLead-cooled fast reactor (LFR)Coolant: Lead · Spectrum: FastSMR30 MWe (gross/net unspecified) · module90 MWth (nameplate; basis unspecified) · moduleNone tracked here
LFTRFlibe EnergyMolten salt reactor (MSR)Coolant: Molten salt · Spectrum: ThermalFuel (as stated): LiF-BeF2-UF4Catalog profile as of 14 Feb 2025SMR——None tracked here
LOKI MMRNANO Nuclear EnergyHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalMicroreactor——1
LSPRTokyo Institute of TechnologyLead-cooled fast reactor (LFR)Coolant: Lead bismuth · Spectrum: FastSMR53 MWe (gross/net unspecified) · module150 MWth (nameplate; basis unspecified) · moduleNone tracked here
MARINA (marine molten-salt reactor)Korea Atomic Energy Research InstituteMolten salt reactor (MSR)Coolant: Molten salt · Spectrum: Not recordedSMR35 MWe (gross/net unspecified) · module100 MWth (nameplate; basis unspecified) · moduleNone tracked here
MARVELIdaho National LaboratoryOther (see description)Coolant: Sodium-potassium · Spectrum: ThermalFuel (as stated): Uranium zirconium hydride fuel, a version of TRIGA fuelCatalog profile as of 17 Oct 2024Microreactorapproximately 10 kWe (gross/net unspecified) · module85 kWth (nameplate; basis unspecified) · module1
MCSFR (molten chloride salt fast reactor)Elysium IndustriesMolten salt reactor (MSR)Coolant: Molten salt · Spectrum: FastSMR——None tracked here
MegAlvinStellariaMolten salt reactor (MSR)Coolant: Not recorded · Spectrum: Not recordedSMR10 MWe (gross/net unspecified) · module—None tracked here
MHI multi-purpose microreactorMitsubishi Heavy IndustriesOther (see description)Coolant: Other (see description) · Spectrum: Not recordedMicroreactor——None tracked here
MHR-100Afrikantov OKBMHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalFuel (as stated): UO2Catalog profile as of 17 Oct 2024SMR——None tracked here
MHR-TAfrikantov OKBMHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalSMR——None tracked here
MicroURANUSUlsan National Institute of Science and Technology (UNIST)Lead-cooled fast reactor (LFR)Coolant: Lead bismuth · Spectrum: FastMicroreactor20 MWe (gross/net unspecified) · module60 MWth (nameplate; basis unspecified) · moduleNone tracked here
Mk1 PB-FHRUniversity of California, BerkeleyFluoride-salt-cooled high-temperature reactor (FHR)Coolant: Molten salt · Spectrum: ThermalSMR100 MWe (net) · module236 MWth (nameplate; basis unspecified) · moduleNone tracked here
MK60Deep AtomicPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalSMR60 MWe (gross/net unspecified) · module200 MWth (nameplate; basis unspecified) · module1
MN-1MobileNuclear EnergyHigh-temperature gas-cooled reactor (HTGR)Coolant: Not recorded · Spectrum: ThermalMicroreactor——None tracked here
MN-350 Mobile Power ModuleScaled AtomicsOther (see description)Coolant: Not recorded · Spectrum: Not recordedMicroreactor350 kWe (gross/net unspecified) · module—None tracked here
MorpheusNuclea EnergyLead-cooled fast reactor (LFR)Coolant: Lead · Spectrum: Not recordedMicroreactor—10 MWth (nameplate; basis unspecified) · module1
MoveluXToshiba Energy Systems & Solutions CorporationOther (see description)Coolant: Other (see description) · Spectrum: ThermalFuel (as stated): U3Si2Catalog profile as of 14 Feb 2025Microreactor——None tracked here
mPowerGeneration mPower LLC, BWX TechnologiesIntegral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: ThermalSMR195 MWe (gross/net unspecified) · module575 MWth (nameplate; basis unspecified) · module1
MYRRHA-derived battery-like SMR (2014 academic concept)—Other (see description)Coolant: Other (see description) · Spectrum: Not recordedSMR——None tracked here
NatriumTerraPowerSodium-cooled fast reactor (SFR)Coolant: Sodium · Spectrum: FastFuel (as stated): Metallic uranium-zirconium (U-10Zr) HALEU fuel column with a sodium bond to HT9 claddingEnrichment (as stated): HALEUSMR345 MWe (gross/net unspecified) · module840 MWth (nameplate; basis unspecified) · module2
Natura MSR-1Natura ResourcesMolten salt reactor (MSR)Coolant: Molten salt · Spectrum: ThermalFuel (as stated): HALEU dissolved in Flibe saltEnrichment (as stated): HALEUSMRthermal only (no MWe)up to 1 MWth (nameplate; basis unspecified) · module1
Natura MSR-100Natura ResourcesMolten salt reactor (MSR)Coolant: Molten salt · Spectrum: Not recordedFuel (as stated): LiF-BeF₂-UF₄ fuel salt (FLiBe with uranium)Enrichment (as stated): <10% enriched LEU+; 19.5% enriched HALEUSMR——1
NHR200-IIINET and China General Nuclear Power GroupPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalSMR——None tracked here
Nuclearis N1Nuclearis EnergyPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalMicroreactor——None tracked here
NuGen EngineNuGen LLCHigh-temperature gas-cooled reactor (HTGR)Coolant: Not recorded · Spectrum: Not recordedMicroreactor——None tracked here
NuScale microreactorNuScale PowerOther (see description)Coolant: Other (see description) · Spectrum: ThermalFuel (as stated): liquid uranium alloy fuelEnrichment (as stated): LEU or HALEUCatalog profile as of 2023Microreactor——None tracked here
NuScale US600NuScale PowerIntegral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: Not recordedSMR50 MWe (gross/net unspecified) · module160 MWth (nameplate; basis unspecified) · moduleNone tracked here
NuScale VOYGR (US460 / NPM)NuScale PowerIntegral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: ThermalSMR77 MWe (gross) · module250 MWth (nameplate; basis unspecified) · module4
NuSun-1NuCube EnergyOther (see description)Coolant: Other (see description) · Spectrum: Not recordedFuel (as stated): TRISOMicroreactor——1
NUWARD SMRNUWARDPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalSMR——None tracked here
ODINCambridge AtomworksOther (see description)Coolant: Molten salt · Spectrum: ThermalEnrichment (as stated): up to 20% (HALEU)Catalog profile as of 14 Feb 2025Microreactor——1
Otrera 2x300Otrera New EnergySodium-cooled fast reactor (SFR)Coolant: Sodium · Spectrum: FastSMR——None tracked here
OTRERA 300Otrera New EnergySodium-cooled fast reactor (SFR)Coolant: Sodium · Spectrum: FastFuel (as stated): MOX / hexagonalCatalog profile as of 16 Jan 2025SMR——None tracked here
OTRERA ONEOtrera New EnergySodium-cooled fast reactor (SFR)Coolant: Sodium · Spectrum: FastSMR—200 MWth (nameplate; basis unspecified) · moduleNone tracked here
PASCAR transportable capsule reactorSeoul National University / NUTRECKLead-cooled fast reactor (LFR)Coolant: Lead bismuth · Spectrum: FastSMR35 MWe (gross/net unspecified) · module100 MWth (nameplate; basis unspecified) · moduleNone tracked here
PBMR (Pebble Bed Modular Reactor)PBMR (Pty) LtdHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalSMR165 MWe (gross/net unspecified) · module400 MWth (nameplate; basis unspecified) · module1
PearlBAM EnergyOther (see description)Coolant: Not recorded · Spectrum: Not recordedSMR——None tracked here
PeLUIt-40National Research and Innovation Agency (BRIN) & Bandung Institute of Technology (ITB)High-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalFuel (as stated): UO2Catalog profile as of 18 Oct 2024SMR——None tracked here
PGSFR (Prototype Gen-IV Sodium-cooled Fast Reactor)Korea Atomic Energy Research InstituteSodium-cooled fast reactor (SFR)Coolant: Sodium · Spectrum: FastSMR150 MWe (gross/net unspecified) · module392.2 MWth (nameplate; basis unspecified) · moduleNone tracked here
POLAR-1Canadian Strategic Missions CorporationOther (see description)Coolant: Not recorded · Spectrum: Not recordedMicroreactor——None tracked here
PRISMGE Vernova Hitachi Nuclear EnergySodium-cooled fast reactor (SFR)Coolant: Sodium · Spectrum: FastFuel (as stated): U-Pu-ZrCatalog profile as of 2 Oct 2026SMR——1
Prismatic HTRGeneral AtomicsHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalFuel (as stated): UO2SMR——None tracked here
Project Pele microreactor (BWXT HTGR)BWX TechnologiesHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalFuel (as stated): TRISOEnrichment (as stated): HALEUMicroreactor1.5 MWe (gross/net unspecified) · module—1
PWR-20Last EnergyPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalFuel (as stated): UO2 pellet / 17x17 gridMicroreactor20 MWe (gross/net unspecified) · module80 MWth (nameplate; basis unspecified) · module6
R1Antares NuclearOther (see description)Coolant: Other (see description) · Spectrum: ThermalFuel (as stated): TRISOEnrichment (as stated): 19.75 wt%Catalog profile as of 14 Feb 2025Microreactor——3
RAPIDCentral Research Institute of Electric Power Industry (CRIEPI)Sodium-cooled fast reactor (SFR)Coolant: Sodium · Spectrum: FastMicroreactor1 MWe (gross/net unspecified) · module10 MWth (nameplate; basis unspecified) · moduleNone tracked here
RAPID-L (lunar concept)Central Research Institute of Electric Power Industry (CRIEPI)Other (see description)Coolant: Other (see description) · Spectrum: FastSMR200 kWe (gross/net unspecified) · module—None tracked here
REPLOY Submersible Power System (SPS)REPLOY Power, Inc.Pressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalSMR300 MWe (gross/net unspecified) · module1000 MWth (nameplate; basis unspecified) · moduleNone tracked here
RITM-200MAfrikantov OKBMIntegral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: ThermalFuel (as stated): UO2 (cermet fuel) pellets / hexagonalCatalog profile as of 14 Feb 2025SMR——None tracked here
RITM-200NRosatomIntegral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: ThermalSMR55 MWe (gross) · module190 MWth (nameplate; basis unspecified) · module3
RITM-200SRosatom, Afrikantov OKBMIntegral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: ThermalSMR58 MWe (gross) · module190 MWth (nameplate; basis unspecified) · module2
RITM-400Afrikantov OKBMPressurized water reactor (PWR)Coolant: Light water · Spectrum: Not recordedSMR——1
Rolls-Royce AMRRolls-Royce plcHigh-temperature gas-cooled reactor (HTGR)Coolant: Not recorded · Spectrum: Not recordedFuel (as stated): Coated particle fuel (as stated)SMRup to 25 MWe (gross/net unspecified) · moduleup to 75 MWth (nameplate; basis unspecified) · moduleNone tracked here
Rolls-Royce SMRRolls-Royce SMRPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalFuel (as stated): UO2SMR470 MWe (net) · module1358 MWth (nameplate; basis unspecified) · module6
RUTA-70NIKIETOther (see description)Coolant: Light water · Spectrum: ThermalSMRthermal only (no MWe)70 MWth (nameplate; basis unspecified) · module1
SALUS-100Korea Atomic Energy Research InstituteSodium-cooled fast reactor (SFR)Coolant: Sodium · Spectrum: FastSMR100 MWe (gross/net unspecified) · module268 MWth (nameplate; basis unspecified) · moduleNone tracked here
SC-HTGR (Framatome steam-cycle HTGR)Framatome Inc.High-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalSMR272 MWe (gross/net unspecified) · module625 MWth (nameplate; basis unspecified) · moduleNone tracked here
SEALERBlykallaLead-cooled fast reactor (LFR)Coolant: Lead · Spectrum: FastFuel (as stated): UN (uranium nitride), as stated by ARISSMR55 MWe (gross/net unspecified) · module140 MWth (nameplate; basis unspecified) · module4
SEALER-OneBlykallaLead-cooled fast reactor (LFR)Coolant: Lead · Spectrum: FastSMR——None tracked here
SHELF-MNIKIETIntegral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: ThermalFuel (as stated): Cermet (UO2 + metallic silumin)Catalog profile as of 1 Jul 2025SMR——1
SINAP small modular thorium molten-salt research reactor (10 MWe)Shanghai Institute of Applied PhysicsMolten salt reactor (MSR)Coolant: Molten salt · Spectrum: ThermalSMR10 MWe (gross/net unspecified) · module30 MWth (nameplate; basis unspecified) · module1
SmAHTROak Ridge National LaboratoryFluoride-salt-cooled high-temperature reactor (FHR)Coolant: Molten salt · Spectrum: ThermalFuel (as stated): UCOEnrichment (as stated): 19.75 wt %Catalog profile as of 2010-12SMR——None tracked here
SMARTKorea Atomic Energy Research InstituteIntegral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: ThermalFuel (as stated): UO2Catalog profile as of 2 Jun 2024SMR100 MWe (gross/net unspecified) · module330 MWth (nameplate; basis unspecified) · moduleNone tracked here
SMART-CKorea Atomic Energy Research InstituteIntegral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: Not recordedSMR110 MWe (gross/net unspecified) · module365 MWth (nameplate; basis unspecified) · moduleNone tracked here
SMART100Korea Atomic Energy Research InstituteIntegral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: ThermalSMR110 MWe (gross/net unspecified) · module365 MWth (nameplate; basis unspecified) · moduleNone tracked here
SOLOTerra InnovatumOther (see description)Coolant: Helium · Spectrum: ThermalFuel (as stated): UO2 pellets, Zircaloy cladEnrichment (as stated): 4.95% U235Microreactor1 MWe (gross/net unspecified) · module—1
SSR-WMoltex EnergyMolten salt reactor (MSR)Coolant: Molten salt · Spectrum: FastFuel (as stated): Molten salt fuel within vented fuel tubesCatalog profile as of 14 Feb 2025SMR——1
SSTAR (Small Secure Transportable Autonomous Reactor)Argonne National Laboratory, Lawrence Livermore National LaboratoryLead-cooled fast reactor (LFR)Coolant: Lead · Spectrum: FastSMR20 MWe (gross/net unspecified) · module45 MWth (nameplate; basis unspecified) · moduleNone tracked here
Stable Salt Reactor - Thermal Spectrum (SSR-U with optional SSR-Th blanket)Moltex EnergyMolten salt reactor (MSR)Coolant: Molten salt · Spectrum: ThermalSMR300 MWe (gross/net unspecified) · module750 MWth (nameplate; basis unspecified) · moduleNone tracked here
STARSTAR ENERGY SAOther (see description)Coolant: Light water · Spectrum: ThermalFuel (as stated): UO2 pellet assemblies in individual pressure channelsCatalog profile as of 15 Oct 2024SMR——None tracked here
STAR-H2Argonne National LaboratoryLead-cooled fast reactor (LFR)Coolant: Lead · Spectrum: FastSMRthermal only (no MWe)400 MWth (nameplate; basis unspecified) · moduleNone tracked here
STAR-LM (Secure Transportable Autonomous Reactor - Liquid Metal)Argonne National LaboratoryLead-cooled fast reactor (LFR)Coolant: Lead · Spectrum: FastSMR178 MWe (gross/net unspecified) · module400 MWth (nameplate; basis unspecified) · moduleNone tracked here
StarCoreStarCore NuclearHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalSMR14 MWe (gross/net unspecified) · module35 MWth (nameplate; basis unspecified) · moduleNone tracked here
STARTTransmutexLead-cooled fast reactor (LFR)Coolant: Lead · Spectrum: FastSMR——None tracked here
StellariumStellariaMolten salt reactor (MSR)Coolant: Molten salt · Spectrum: FastFuel (as stated): Molten Uranium, Plutonium Chloride (optional minor actinides)Catalog profile as of 14 Feb 2025SMR——1
SVBR-100AKME-engineering JSCLead-cooled fast reactor (LFR)Coolant: Lead bismuth · Spectrum: FastFuel (as stated): UO2 - FOAK; UO2 / (U-Pu)O2 / (U Pu)N / (U-Pu)C - NOAKCatalog profile as of 15 Oct 2024SMR——1
TEPLATORUniversity of West Bohemia and Czech Technical University in PragueOther (see description)Coolant: Other (see description) · Spectrum: ThermalFuel (as stated): VVER-440 spent fuel assembliesCatalog profile as of 14 Feb 2025SMR——1
Thorcon 500 (TMSR500)PT Thorcon Power IndonesiaMolten salt reactor (MSR)Coolant: Molten salt · Spectrum: ThermalFuel (as stated): UF4 / molten saltSMR250 MWe (gross/net unspecified) · module—1
Thorizon OneThorizonMolten salt reactor (MSR)Coolant: Molten salt · Spectrum: FastSMRapproximately 100 MWe (gross/net unspecified) · module250 MWth (nameplate; basis unspecified) · module1
Thorizon PIONEER nuclear demonstratorThorizonMolten salt reactor (MSR)Coolant: Molten salt · Spectrum: Not recordedSMR——1
TMSR-LF1 experimental molten-salt reactorShanghai Institute of Applied PhysicsMolten salt reactor (MSR)Coolant: Molten salt · Spectrum: ThermalFuel (as stated): liquid fuel, thorium-based molten saltEnrichment (as stated): HALEU (initial load); enriched to under 20% U-235SMR—2 MWth (nameplate; basis unspecified) · module1
TREDIC HTGR SMRTREDIC CorporationHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalFuel (as stated): TRISOSMR——None tracked here
U-BatteryUrencoHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalMicroreactor4 MWe (gross/net unspecified) · module10 MWth (nameplate; basis unspecified) · module1
UNITHERMNIKIETIntegral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: ThermalFuel (as stated): UO2 particles in a metallic silumin or zirconium matrix, metal-ceramicCatalog profile as of 16 Oct 2024Microreactor——None tracked here
UnityDeployable EnergyOther (see description)Coolant: Helium · Spectrum: Not recordedFuel (as stated): UO2 annular pellets, Zircaloy claddingEnrichment (as stated): 4.95% U-235 (LEU)Microreactor1 MWe (gross/net unspecified) · module—3
URANUS-40Seoul National University / NUTRECKLead-cooled fast reactor (LFR)Coolant: Lead bismuth · Spectrum: FastSMR40 MWe (gross/net unspecified) · module100 MWth (nameplate; basis unspecified) · moduleNone tracked here
VBER-150Afrikantov OKBMPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalSMRapproximately 110 MWe (gross/net unspecified) · module350 MWth (nameplate; basis unspecified) · moduleNone tracked here
VBER-300Afrikantov OKBMPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalFuel (as stated): UO2Catalog profile as of 18 Oct 2024SMR——1
Vityaz—Other (see description)Coolant: Not recorded · Spectrum: Not recordedSMR——None tracked here
VK-300NIKIETBoiling water reactor (BWR)Coolant: Light water · Spectrum: ThermalSMR250 MWe (gross/net unspecified) · module750 MWth (nameplate; basis unspecified) · moduleNone tracked here
VVER-300 (V-478)OKB GidropressPressurized water reactor (PWR)Coolant: Light water · Spectrum: ThermalSMRapproximately 300 MWe (gross/net unspecified) · module850 MWth (nameplate; basis unspecified) · moduleNone tracked here
VVER-IOKB GidropressIntegral pressurized water reactor (iPWR)Coolant: Light water · Spectrum: Not recordedSMR—250 MWth (nameplate; basis unspecified) · moduleNone tracked here
W-LFRWestinghouse Electric CompanyLead-cooled fast reactor (LFR)Coolant: Lead · Spectrum: FastFuel (as stated): Oxide (UO2 or MOX) (prototype) Advanced fuel(commercial)Catalog profile as of 2 Jun 2024SMR——None tracked here
Ward 250Valar AtomicsHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: Not recordedFuel (as stated): TRISO coated particle fuelEnrichment (as stated): 19.75 wt%Microreactor—250 kWth (nameplate; basis unspecified) · module1
XAMRNAAREAMolten salt reactor (MSR)Coolant: Molten salt · Spectrum: FastSMR——None tracked here
Xe-100X-energyHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalFuel (as stated): Graphite pebbles with TRISO particle fuelSMR80 MWe (net) · module200 MWth (nameplate; basis unspecified) · module4
XENITHX-energyHigh-temperature gas-cooled reactor (HTGR)Coolant: Helium · Spectrum: ThermalMicroreactor——None tracked here
Yanlong DHR-400China National Nuclear CorporationOther (see description)Coolant: Light water · Spectrum: Not recordedFuel (as stated): UO2 pellet / 17x17 squareCatalog profile as of 2022SMRthermal only (no MWe)400 MWth (nameplate; basis unspecified) · module1
ZiaCoreLos Alamos National LaboratoryOther (see description)Coolant: Other (see description) · Spectrum: Not recordedFuel (as stated): UO2Microreactor——None tracked here
ZMRZap EnergyOther (see description)Coolant: Sodium · Spectrum: Not recordedFuel (as stated): U-Zr metallic fuelSMRup to 25 MWe (gross/net unspecified) · module—None tracked here