Projects
222 source-linked projects and proposals in 30 countries, including announced, suspended and canceled records. The table and the map show the same matching projects.
Browse by country · Browse by stage · What the reactor types mean
Showing 222 of 222 projects
151 on the map at 118 locations · 71 without a map pin: 43 name a site or town, not pinned; 28 name no site · 16 canceled or suspended
One reporting row per project for every page of matching results, in the current sort order (what each column means). This is the readable reporting file, not the 60-column projects.csv. Projects chosen for comparison do not change this download.
No projects match these filters. Reset filters
None of the matching projects has a map pin. .
Map: Leaflet (BSD-2-Clause) · tiles © OpenStreetMap contributors.
Marker color shows the recorded project stage; shape shows reactor class. Select a pin for the project's capacity, permissions, latest development and next target.
Pins by country
Each country with its pinned projects and, where some have no pin, a link to those projects in the table. How precise is a pin?
| Project and category | Country | Stage | Design | Capacity | Recorded organizations | Location | Record reviewed |
|---|---|---|---|---|---|---|---|
| Akademik Lomonosov floating NPPSMR | Russia | Operating | KLT-40S | 70 MWe (gross) · plant · 300 MWth (nameplate; basis unspecified) |
| Pevek floating NPP berthChukotka · site-area point (approximate) | 18 Oct 2026Latest source 19 Aug 2026Latest event 22 May 2020 |
| HTR-10 high-temperature gas-cooled test reactor, Tsinghua INETSMR | China | Operating | HTR-10 | 2 MWe (gross/net unspecified) · plant · 10 MWth (nameplate; basis unspecified) |
| INET, Tsinghua University (Changping)Beijing · site-area point (approximate) | 18 Oct 2026Latest source, document dated 7 Apr 2024Latest event Oct 2004 |
| HTR-PM Shidaowan demonstrationSMR | China | Operating | HTR-PM | 210 MWe (gross) · plant · 500 MWth (nameplate; basis unspecified) |
| Shidaowan / Shidao BayShandong · site-area point (approximate) | 19 Oct 2026Latest source, document dated 20 Aug 2021Latest event 6 Dec 2023 |
| HTTR test reactor with planned hydrogen coupling, OaraiSMR | Japan | Operating | HTTR | 30 MWth (thermal only; nameplate; basis unspecified) |
| JAEA Oarai Nuclear Engineering InstituteIbaraki · site-area point (approximate) | 18 Oct 2026Latest source 27 Mar 2025Latest event 26 Sep 2025 |
| TMSR-LF1 thorium molten-salt experimental reactor, WuweiSMR | China | Operating | TMSR-LF1 experimental molten-salt reactor | 2 MWth (thermal only; nameplate; basis unspecified) |
| Hongshagang industrial cluster, Minqin countyGansu · site-area point (approximate) | 18 Oct 2026Latest source 13 Jan 2026Latest event 1 Nov 2025 |
| Valar Atomics Ward 250Microreactor | United States | Operating | Ward 250 | MWe not recorded · module · 250 kWth (nameplate; basis unspecified) |
| Utah San Rafael Energy LabUtah · site-area point (approximate) | 18 Oct 2026Latest source 19 Jun 2026Latest event 2 Jul 2026 |
| Aalo-X at Idaho National LaboratoryMicroreactor | United States | Commissioning | Aalo-X | 10 watts thermal (thermal only; zero-power limit) |
| Idaho National Laboratory, Materials and Fuels Complex (reactor pilot demonstrations)Idaho · site-area point (approximate) | 18 Oct 2026Latest source 30 Jul 2026Latest event 4 Jul 2026 |
| Antares Mark-0 at Idaho National LaboratoryMicroreactor | United States | Commissioning | Antares Mark-0 | 100 watts thermal (thermal only; zero-power limit) |
| Idaho National Laboratory, Materials and Fuels Complex (reactor pilot demonstrations)Idaho · site-area point (approximate) | 18 Oct 2026Latest source 23 Oct 2026Latest event 4 Jun 2026 |
| Deployable Energy Unity at Idaho National LaboratoryMicroreactor | United States | Commissioning | Unity | 0 MWth (thermal only; zero-power limit) |
| Idaho National Laboratory, Materials and Fuels Complex (reactor pilot demonstrations)Idaho · site-area point (approximate) | 18 Oct 2026Latest source 1 Jul 2026Latest event 30 Jun 2026 |
| Linglong One (ACP100) ChangjiangSMR | China | Commissioning | ACP100 (Linglong One) | 125 MWe (gross) · module · 385 MWth (nameplate; basis unspecified) |
| Changjiang Nuclear Power Plant siteHainan · site-area point (approximate) | 18 Oct 2026Latest source 1 Oct 2026Latest event 1 Oct 2026 |
| Radiant Kaleidos demonstration at INL DOMEMicroreactor | United States | Commissioning | Kaleidos | MWe not recorded · module · 3.5 MWth (nameplate; basis unspecified) |
| DOME test bed, Idaho National LaboratoryIdaho · site-area point (approximate) | 18 Oct 2026Latest source 29 Oct 2026Latest event 29 Oct 2026 |
| Baim / Cape Nagloynyn floating PEB-106 (RITM-200S)SMR | Russia | Construction | RITM-200S | — |
| Cape Nagloynyn (Baim / PEB-106 floating mooring)Chukotka · site-area point (approximate) | 18 Oct 2026Latest source 13 Aug 2026Latest event 24 Sep 2026 |
| BREST-OD-300 SeverskSMR | Russia | Construction | BREST-OD-300 | 300 MWe (gross) · module · 700 MWth (nameplate; basis unspecified) |
| Seversk BREST-OD-300 siteTomsk Oblast · site-area point (approximate) | 18 Oct 2026Latest source 19 Jun 2026Latest event 7 Oct 2026 |
| Darlington BWRX-300 Unit 1SMR | Canada | Construction | BWRX-300 | 300 MWe (net) · module · 870 MWth (nameplate; basis unspecified) |
| Darlington New Nuclear Project siteOntario · site-area point (approximate) | 18 Oct 2026Latest source 11 Nov 2026Latest event 10 Nov 2026 |
| Kairos Hermes 1SMR | United States | Construction | Hermes / KP-FHR | 35 MWth (thermal only; nameplate; basis unspecified) |
| Kairos Hermes site (East Tennessee Technology Park / Oak Ridge area)Tennessee · site-area point (approximate) | 18 Oct 2026Latest source 15 Sep 2026Latest event 1 May 2025 |
| Kairos Hermes 2SMR | United States | Construction | Hermes / KP-FHR | — |
| Kairos Hermes site (East Tennessee Technology Park / Oak Ridge area)Tennessee · site-area point (approximate) | 18 Oct 2026Latest source, document dated 1 Oct 2026Latest event 17 Apr 2026 |
| Last Energy PWR-5 pilot at Texas A&M-RELLISMicroreactor | United States | Construction | Last Energy PWR-5 | 5 MWe (gross/net unspecified) · module |
| Texas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate) | 18 Oct 2026Latest source 16 Dec 2025Latest event 7 Oct 2026 |
| MARVEL microreactor test bed at INL's TREAT facilityMicroreactor | United States | Construction | MARVEL | 10 kWe (gross/net unspecified) · plant · 85 kWth (nameplate; basis unspecified) |
| TREAT facility, Idaho National LaboratoryIdaho · site-area point (approximate) | 18 Oct 2026Latest source 6 Oct 2026Latest event 6 Oct 2026 |
| Natrium Kemmerer Unit 1SMR | United States | Construction | Natrium | 345 MWe (gross/net unspecified) · module · 840 MWth (nameplate; basis unspecified) |
| Kemmerer Natrium siteWyoming · town-level point (approximate) | 18 Oct 2026Latest source 23 Sep 2026Latest event Sep 2026 |
| Natura MSR-1 demonstration at Abilene Christian UniversitySMR | United States | Construction | Natura MSR-1 | thermal only |
| Science and Engineering Research Center, Abilene Christian UniversityTexas · site-area point (approximate) | 18 Oct 2026Latest source 22 Sep 2026Latest event 18 Sep 2026 |
| Oklo Aurora-INLMicroreactor | United States | Construction | Aurora | — |
| Idaho National Laboratory — Aurora site south of the Materials and Fuels ComplexIdaho · site-area point (approximate) | 18 Oct 2026Latest source, document dated 6 Nov 2026Latest event 20 Jul 2026 |
| Project Pele (INL microreactor demonstration)Microreactor | United States | Construction | Project Pele microreactor (BWXT HTGR) | 1.5 MWe (gross/net unspecified) · module |
| INL CITRC Project Pele areaIdaho · town-level point (approximate) | 18 Oct 2026Latest source 7 Dec 2022Latest event Sep 2026 |
| RITM-200N JizzakhSMR | Uzbekistan | Construction | RITM-200N | 55 MWe (gross/net unspecified) · module |
| Jizzakh RITM-200N siteJizzakh Region · site-area point (approximate) | 18 Oct 2026Latest source 5 Jun 2026Latest event 4 Jun 2026 |
| Xuwei nuclear heating and power plant Unit 3 (HTGR)SMR | China | Construction | Design profile not linked | 660 MWe (gross/net unspecified) · plant |
| Jiangsu Xuwei nuclear heating and power plantJiangsu · site-area point (approximate) | 18 Oct 2026Latest source 10 Nov 2026Latest event 6 Nov 2026 |
| Blue Energy BWRX-300 at Port of VictoriaSMR | United States | Licensing | BWRX-300 | 1500 MWe (gross/net unspecified) · plant |
| Port of VictoriaTexas · named site, no map pin | 18 Oct 2026Latest source 8 Oct 2026Latest event 16 Sep 2026 |
| Blykalla SEALER Norrsundet / Gävle proposalSMR | Sweden | Licensing | SEALER | 330 MWe (gross/net unspecified) · plant | Norrsundet, Gävletown-level point (approximate) | 18 Oct 2026Latest source 15 Oct 2026Latest event 9 Oct 2026 | |
| Blykalla SEALER Untra / Tierp proposalSMR | Sweden | Licensing | SEALER | 440 MWe (gross/net unspecified) · plant | Untra, Tierp municipalityUppsala County · town-level point (approximate) | 18 Oct 2026Latest source 31 Aug 2026Latest event 31 Aug 2026 | |
| Daqing NHR-200 nuclear heating plant (1990s)SMRFrom an earlier plan | China | Licensing | Design profile not linked | 200 MWth (thermal only; nameplate; basis unspecified) |
| Daqing nuclear heating plant siteHeilongjiang · town named, no map pin | 18 Oct 2026Latest source: none datedLatest event 1993 |
| Dual Fluid critical demonstration experiment in RwandaSMR | Rwanda | Licensing | DF-CDE critical demonstration experiment | — |
| Nyamata nuclear research campus (planned)Eastern Province · town named, no map pin | 18 Oct 2026Latest source, document dated May 2026Latest event Feb 2025 |
| Duke Belews Creek technology-neutral SMR proposalSMR | United States | Licensing | Design profile not linked | — |
| Site near Belews Creek Steam Station, Stokes CountyNorth Carolina · site-area point (approximate) | 18 Oct 2026Latest source, document dated 1 Oct 2026Latest event 1 Oct 2026 |
| Holtec Pioneer Units 1 and 2 (SMR-300 at Palisades)SMR | United States | Licensing | Holtec SMR-300 | 680 MWe (gross/net unspecified) · plantHoltec states the two Pioneer units are designed to provide 680 MWe together, and the NRC's January 2026 release describes each SMR-300 unit as approximately 340 MWe. |
| Palisades Nuclear Plant areaMichigan · site-area point (approximate) | 18 Oct 2026Latest source 10 Nov 2026Latest event 30 Sep 2026 |
| Jimmy Cristanol Bazancourt heat microreactor proposalMicroreactor | France | Licensing | Jimmy Fermi heat microreactor | 20 MWth (thermal only; nameplate; basis unspecified) | Cristanol industrial site, Bazancourtsite-area point (approximate) | 18 Oct 2026Latest source 11 Oct 2024Latest event 23 Jul 2026 | |
| Kärnfull Next SMR park at Målma, ValdemarsvikSMR | Sweden | Licensing | BWRX-300 | — |
| Målma, ValdemarsvikÖstergötland · town named, no map pin | 18 Oct 2026Latest source 3 Jun 2026Latest event 3 Sep 2026 |
| Last Energy first commercial PWR-20 site, Caldwell CountyMicroreactor | United States | Licensing | PWR-20 | 20 MWe (net) · module · 80 MWth (nameplate; basis unspecified) |
| Maxwell, Caldwell CountyTexas · region only, no map pin | 28 Oct 2026Latest source 5 Nov 2026Latest event Jul 2026 |
| Long Mott Generating Station (Xe-100 at Dow Seadrift)SMR | United States | Licensing | Xe-100 | 320 MWe (net) · plant · 800 MWth (nameplate; basis unspecified)The NRC's Long Mott page (updated 12 November 2026) lists a four-module plant at 800 MWth/320 MWe, intended to supply electricity and steam to the adjacent Seadrift Operations facility (a Dow site), and says each module could produce 80 MWe of electricity or about 200 MWth of steam. |
| Dow UCC Seadrift / Long MottTexas · site-area point (approximate) | 18 Oct 2026Latest source 12 Nov 2026Latest event 9 Nov 2026 |
| NB Power ARC-100 at Point LepreauSMR | Canada | Licensing | ARC-100 | 100 MWe (gross/net unspecified) · module |
| Point Lepreau Nuclear Generating Station siteNew Brunswick · site-area point (approximate) | 18 Oct 2026Latest source 7 May 2024Latest event 22 Dec 2022 |
| NuScale VOYGR Doicești (Romania)SMR | Romania | Licensing | NuScale VOYGR (US460 / NPM) | 462 MWe (gross) · plant |
| Doicești NuScale siteDâmbovița · site-area point (approximate) | 18 Oct 2026Latest source, document dated 29 Oct 2026Latest event 29 Oct 2026 |
| Stellaria Alvin experimental reactor (INB Alpha) at CadaracheSMR | France | Licensing | Alvin experimental molten-salt reactor | MWe not recorded · plant · 200 kWth (nameplate; basis unspecified) | CEA CadaracheProvence-Alpes-Côte d'Azur · site-area point (approximate) | 18 Oct 2026Latest source 23 Apr 2026Latest event 16 Jun 2026 | |
| Studsvik new nuclear at the Nyköping home siteSMR | Sweden | Licensing | BWRX-300 | — |
| Studsvik site, NyköpingSödermanland · town-level point (approximate) | 18 Oct 2026Latest source 14 Oct 2026Latest event 3 Sep 2026 |
| TVA Clinch River BWRX-300SMR | United States | Licensing | BWRX-300 | 300 MWe (net) · moduleThe IAEA's 2026 reactor tables, which report Member State data to 31 December 2025, list Clinch River SMR-1 at 300 MW gross and 300 MW net with no thermal figure. |
| Clinch River Nuclear SiteTennessee · site-area point (approximate) | 18 Oct 2026Latest source, document dated 28 Sep 2026Latest event 29 Sep 2026 |
| UCRI critical unit for the Brazilian microreactor program at IENMicroreactor | Brazil | Licensing | Design profile not linked | — |
| IEN Argonauta building, UFRJ campus, Rio de JaneiroRio de Janeiro · site-area point (approximate) | 18 Oct 2026Latest source 21 Jan 2026Latest event 21 Jan 2026 |
| University of Illinois KRONOS MMRMicroreactor | United States | Licensing | KRONOS MMR | MWe not recorded · module · 45 MWth (nameplate; basis unspecified) |
| University of Illinois Urbana-Champaign campusIllinois · exact point | 18 Oct 2026Latest source 27 Oct 2026Latest event 27 Oct 2026 |
| Yakutia land-based RITM-200N (Ust-Kuyga)SMR | Russia | Licensing | RITM-200N | 55 MWe (gross/net unspecified) · module |
| Ust-Kuyga (Yakutia land-based RITM-200N)Sakha (Yakutia) · site-area point (approximate) | 18 Oct 2026Latest source 3 Mar 2026Latest event 27 Feb 2026 |
| Aalo commercial proposal at Texas A&M-RELLISSMR | United States | Siting | Aalo pod (commercial proposal) | — |
| Texas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate) | 9 Oct 2026Latest source: none datedLatest event 4 Feb 2025 |
| AEP Joshua Falls SMR proposalSMR | United States | Siting | Design profile not linked | — |
| Joshua Falls, Campbell CountyVirginia · site-area point (approximate) | 9 Oct 2026Latest source: none datedLatest event 17 Jan 2025 |
| Antares microreactor at Joint Base San Antonio (ANPI)Microreactor | United States | Siting | R1 | — |
| Joint Base San AntonioTexas · named site, no map pin | 10 Oct 2026Latest source 23 Apr 2026Latest event: none dated |
| Antares R1 microreactor siting at INL's Central Facilities AreaMicroreactor | United States | Siting | R1 | — |
| INL Central Facilities Area (candidate locations for an Antares R1 microreactor)Idaho · site-area point (approximate) | 3 Oct 2026Latest source, document dated 21 Aug 2025Latest event: none dated |
| BARC Visakhapatnam HTGCR hydrogen demonstration proposalSMR | India | Siting | BARC high-temperature gas-cooled hydrogen reactor | 5 MWth (thermal only; nameplate; basis unspecified) |
| BARC Vizag campusAndhra Pradesh · site-area point (approximate) | 6 Oct 2026Latest source, document dated 5 Aug 2026Latest event Mar 2026 |
| BlueCore BC-15 floating plant proposal at the Port of Long BeachSMR | United States | Siting | BlueCore BC-15 | 15 MWe (gross) · module · 45 MWth (nameplate; basis unspecified) |
| Port of Long BeachCalifornia · named site, no map pin | 9 Oct 2026Latest source 13 Oct 2026Latest event: none dated |
| Calogena nuclear heating plant at CEA CadaracheMicroreactor | France | Siting | Design profile not linked | thermal only | CEA CadaracheProvence-Alpes-Côte d'Azur · site-area point (approximate) | 5 Oct 2026Latest source: none datedLatest event: none dated | |
| Cascade Advanced Energy FacilitySMR | United States | Siting | Xe-100 | 320 MWe (net) · plant |
| Hanford Reservation Cascade / Columbia GS areaWashington · site-area point (approximate) | 18 Oct 2026Latest source 5 Nov 2026Latest event 5 Nov 2026 |
| CNEC / Zheneng Sanmen HTGR power stationSMR | China | Siting | HTR-PM600 | — |
| Sanmen HTGR siteZhejiang · town named, no map pin | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Copenhagen Atomics critical experiment at the Paul Scherrer InstituteSMR | Switzerland | Siting | BALDER experimental configuration | — |
| Paul Scherrer Institute, VilligenAargau · site-area point (approximate) | 13 Oct 2026Latest source: none datedLatest event: none dated |
| Dalane / Lund SMR proposalSMR | Norway | Siting | Design profile not linked | — |
| DalaneRogaland · region only, no map pin | 1 Oct 2026Latest source: none datedLatest event: none dated |
| Darlington BWRX-300 Units 2-4SMR | Canada | Siting | BWRX-300 | — |
| Darlington New Nuclear Project siteOntario · site-area point (approximate) | 2 Oct 2026Latest source, document dated 12 Mar 2026Latest event: none dated |
| Deep Fission Gravity pilot, ParsonsSMR | United States | Siting | Gravity | — |
| Great Plains Industrial Park, ParsonsKansas · site-area point (approximate) | 13 Oct 2026Latest source, document dated 17 Jul 2026Latest event 6 Aug 2026 |
| Deployable Energy Unity full-power test in INL's DOME (2027)Microreactor | United States | Siting | Unity | 1 MWe (gross/net unspecified) · module |
| DOME test bed, Idaho National LaboratoryIdaho · site-area point (approximate) | 13 Oct 2026Latest source 30 Sep 2026Latest event 30 Sep 2026 |
| Elementl Letart Township BWRX-300 proposalSMR | United States | Siting | BWRX-300 | — |
| Letart Township, Meigs CountyOhio · town-level point (approximate) | 11 Oct 2026Latest source 26 Oct 2026Latest event 26 Oct 2026 |
| Fensfjorden Kjernekraft SMR proposal near Mongstad (Austrheim and Alver)SMR | Norway | Siting | Design profile not linked | — |
| Proposed Fensfjorden site, AustrheimVestland · site-area point (approximate) | 3 Oct 2026Latest source 10 Apr 2026Latest event: none dated |
| Fermi Energia Estonian BWRX-300 plantSMR | Estonia | Siting | BWRX-300 | 600 MWe (net) · plant |
| Undisclosed | 6 Oct 2026Latest source 6 Nov 2026Latest event: none dated |
| Formosa commercial CAREM proposal (2010 agreement)SMRFrom an earlier plan | Argentina | Siting | Design profile not linked | — |
| Formosaregion only, no map pin | 13 Oct 2026Latest source: none datedLatest event: none dated |
| Grenland Kjernekraft SMR proposal at Herre, BambleSMR | Norway | Siting | Design profile not linked | — |
| Herre, Bamble (Grenland)Telemark · site-area point (approximate) | 3 Oct 2026Latest source: none datedLatest event: none dated |
| Halden Kjernekraft SMR proposal at FemsjøenSMR | Norway | Siting | Design profile not linked | — |
| Femsjøen area, HaldenØstfold · site-area point (approximate) | 2 Oct 2026Latest source 15 Aug 2024Latest event: none dated |
| Helen nuclear energy program plant in HelsinkiSMR | Finland | Siting | Design profile not linked | — | Helsinki (Vuosaari, Salmisaari or Norrberget)Uusimaa · town named, no map pin | 2 Oct 2026Latest source 5 Nov 2026Latest event: none dated | |
| Huakun One floating reactor platform demonstration at the Taipingling siteSMR | China | Siting | Huakun One floating reactor platform | 50 MWe (gross/net unspecified) · plant · 200 MWth (nameplate; basis unspecified) |
| Taipingling site operations base (harbour basin), HuidongGuangdong · site-area point (approximate) | 6 Oct 2026Latest source, document dated 2 Nov 2026Latest event 2 Nov 2026 |
| Huizhou HuaPeng-1 heating demonstration proposalSMR | China | Siting | HuaPeng-1 | thermal only |
| Huizhou HuaPeng-1 demonstration location (undisclosed)Guangdong · town named, no map pin | 13 Oct 2026Latest source 8 Jan 2026Latest event: none dated |
| Idaho State University / NuCube Advanced Research and Test ReactorMicroreactor | United States | Siting | Design profile not linked | thermal only |
| ISU Business and Research Park, PocatelloIdaho · town-level point (approximate) | 13 Oct 2026Latest source 16 Sep 2026Latest event 16 Sep 2026 |
| Kairos commercial proposal at Texas A&M-RELLISSMR | United States | Siting | KP-FHR commercial plant | — |
| Texas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate) | 9 Oct 2026Latest source: none datedLatest event: none dated |
| KHNP SMR at the Gijang-gun candidate site (11th Basic Plan)SMR | South Korea | Siting | Design profile not linked | — |
| Gijang-gun SMR candidate siteBusan · town named, no map pin | 6 Oct 2026Latest source: none datedLatest event: none dated |
| Kuopion Energia small nuclear district-heating plantSMR | Finland | Siting | Design profile not linked | thermal only |
| Kuopio (Hepomäki or Sorsasalo)North Savo · town named, no map pin | 2 Oct 2026Latest source, document dated 11 Jun 2026Latest event: none dated |
| Last Energy Haskell County PWR-20 campusMicroreactor | United States | Siting | PWR-20 | 20 MWe (gross) · module |
| Haskell CountyTexas · region only, no map pin | 9 Oct 2026Latest source Jul 2026Latest event 28 Feb 2025 |
| Last Energy Llynfi PWR-20 proposalMicroreactor | United Kingdom | Siting | PWR-20 | 20 MWe (gross/net unspecified) · module |
| Former Llynfi Power Station site, South WalesWales · site-area point (approximate) | 18 Oct 2026Latest source 17 Feb 2025Latest event 17 Feb 2025 |
| Lister Kjernekraft SMR proposal (Lyngdal and Farsund)SMR | Norway | Siting | Design profile not linked | — |
| Lister region (Lyngdal and Farsund)Agder · region only, no map pin | 2 Oct 2026Latest source 17 Dec 2025Latest event: none dated |
| Narvik Kjernekraft SMR plant proposal at Fornes, BallangenSMR | Norway | Siting | Design profile not linked | — |
| Fornes, Ballangen (Narvik)Nordland · site-area point (approximate) | 2 Oct 2026Latest source 25 Aug 2025Latest event: none dated |
| Natura MSR-100 proposal at Texas A&M-RELLISSMR | United States | Siting | Natura MSR-100 | — |
| Texas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate) | 9 Oct 2026Latest source: none datedLatest event: none dated |
| newcleo / JAVYS LFR-AS-200 study at Bohunice V1SMR | Slovakia | Siting | LFR-AS-200 | — | Bohunice V1 siteTrnava · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated | |
| newcleo LFR-AS-30 at Beaumont-en-Véron / Savigny-en-VéronSMR | France | Siting | LFR-AS-30 | 30 MWe (gross/net unspecified) · plant | Beaumont-en-Véron / Savigny-en-VéronIndre-et-Loire · town named, no map pin | 6 Oct 2026Latest source: none datedLatest event 30 Sep 2026 | |
| Norsk Kjernekraft SMR proposal in VardøSMR | Norway | Siting | Design profile not linked | — |
| Svartnes, VardøFinnmark · town-level point (approximate) | 2 Oct 2026Latest source, document dated 11 Dec 2024Latest event 22 Nov 2024 |
| Oklo Aurora at Eielson AFB (DAF microreactor pilot)Microreactor | United States | Siting | Aurora | — |
| Eielson Air Force BaseAlaska · site-area point (approximate) | 7 Oct 2026Latest source: none datedLatest event: none dated |
| Oklo Aurora campus, Pike County, OhioMicroreactor | United States | Siting | Aurora | — |
| Pike County / former Portsmouth site (Oklo)Ohio · site-area point (approximate) | 10 Oct 2026Latest source 12 Nov 2026Latest event 1 Feb 2024 |
| OSGE Dąbrowa Górnicza BWRX-300 proposalSMR | Poland | Siting | BWRX-300 | — |
| Dąbrowa Górniczatown-level point (approximate) | 1 Oct 2026Latest source 5 Nov 2025Latest event 7 Dec 2023 |
| OSGE Kraków / Nowa Huta BWRX-300 proposalSMR | Poland | Siting | BWRX-300 | — |
| Nowa Huta, Krakówtown-level point (approximate) | 1 Oct 2026Latest source 5 Nov 2025Latest event 7 Dec 2023 |
| OSGE Ostrołęka BWRX-300 proposalSMR | Poland | Siting | BWRX-300 | — |
| Ostrołękatown-level point (approximate) | 2 Oct 2026Latest source 5 Nov 2025Latest event 7 Dec 2023 |
| OSGE Stalowa Wola BWRX-300SMR | Poland | Siting | BWRX-300 | 300 MWe (net) · module |
| Stalowa Wola SMR areaSubcarpathian · town-level point (approximate) | 2 Oct 2026Latest source 5 Nov 2025Latest event: none dated |
| OSGE Stawy Monowskie BWRX-300SMR | Poland | Siting | BWRX-300 | 300 MWe (net) · module |
| Stawy Monowskie near Oswiecim SMR areaLesser Poland · town-level point (approximate) | 1 Oct 2026Latest source 22 Oct 2026Latest event: none dated |
| OSGE Wloclawek BWRX-300SMR | Poland | Siting | BWRX-300 | 300 MWe (net) · module |
| Wloclawek BWRX-300 project areaKuyavian-Pomeranian · town-level point (approximate) | 2 Oct 2026Latest source 22 Oct 2026Latest event: none dated |
| Øygarden / Alver SMR proposalSMR | Norway | Siting | Design profile not linked | — |
| Øygarden and Alvertown named, no map pin | 1 Oct 2026Latest source 8 Aug 2024Latest event: none dated |
| Radiant Kaleidos Buckley Space Force Base proposalMicroreactor | United States | Siting | Kaleidos | — |
| Buckley Space Force Base, AuroraColorado · site-area point (approximate) | 10 Oct 2026Latest source 23 Jul 2026Latest event 23 Jul 2026 |
| Rolls-Royce SMR Dětmarovice candidate locationSMR | Czechia | Siting | Rolls-Royce SMR | — |
| Dětmarovice candidate locationsite-area point (approximate) | 28 Oct 2026Latest source 27 Feb 2023Latest event 21 Jul 2026 |
| Rolls-Royce SMR Tušimice candidate locationSMR | Czechia | Siting | Rolls-Royce SMR | — |
| Tušimice candidate locationsite-area point (approximate) | 28 Oct 2026Latest source 22 Dec 2025Latest event 21 Jul 2026 |
| Rolls-Royce SMR WylfaSMR | United Kingdom | Siting | Rolls-Royce SMR | 1410 MWe (net) · plant |
| Wylfa Newydd siteWales · site-area point (approximate) | 6 Oct 2026Latest source 24 Sep 2026Latest event 13 Apr 2026 |
| SaskPower Rafferty SMR (Estevan area)SMR | Canada | Siting | BWRX-300 | 600 MWe (net) · plant |
| Rafferty site near EstevanSaskatchewan · town-level point (approximate) | 1 Oct 2026Latest source: none datedLatest event: none dated |
| SEALER power plant proposal in Longyearbyen, SvalbardSMR | Norway | Siting | SEALER | — |
| LongyearbyenSvalbard · town named, no map pin | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Shandong Haiyang integrated small reactor demonstration project (heat only)SMR | China | Siting | Design profile not linked | 200 MWth (thermal only; nameplate; basis unspecified) | Haiyang nuclear power plant, south-west cornerShandong · site-area point (approximate) | 6 Oct 2026Latest source: none datedLatest event 10 Sep 2024 | |
| Shelf-M small nuclear plant at the Sovinoe deposit, ChukotkaSMR | Russia | Siting | SHELF-M | 10 MWe (gross/net unspecified) · plant · 35 MWth (nameplate; basis unspecified) | Sovinoe gold depositChukotka · named site, no map pin | 6 Oct 2026Latest source: none datedLatest event: none dated | |
| SINAP small modular thorium molten-salt research reactor (10 MWe), MinqinSMR | China | Siting | SINAP small modular thorium molten-salt research reactor (10 MWe) | 10 MWe (gross/net unspecified) · plant · 30 MWth (nameplate; basis unspecified) |
| SINAP Wuwei campus, Hongshagang zone, Minqin countyGansu · site-area point (approximate) | 6 Oct 2026Latest source 12 Mar 2026Latest event Jan 2026 |
| SPIC Jiamusi nuclear heating demonstration (Hongxing site)SMR | China | Siting | Design profile not linked | 200 MWth (thermal only; nameplate; basis unspecified) |
| Hongxing site, Simajia town, Huachuan county (Jiamusi)Heilongjiang · site-area point (approximate) | 3 Oct 2026Latest source 9 Dec 2019Latest event: none dated |
| Taftøy Aure / Heim SMR proposalSMR | Norway | Siting | Design profile not linked | — |
| Taftøy Næringspark, Aure and Heimnamed site, no map pin | 2 Oct 2026Latest source 10 Apr 2026Latest event 11 Feb 2026 |
| Tarapur BSMR-200 lead proposalSMR | India | Siting | Bharat Small Modular Reactor (BSMR-200) | 220 MWe (gross/net unspecified) · module |
| TarapurMaharashtra · site-area point (approximate) | 6 Oct 2026Latest source, document dated 5 Aug 2026Latest event Aug 2026 |
| Tarapur SMR-55 lead proposalSMR | India | Siting | BARC SMR-55 | 55 MWe (gross/net unspecified) · module |
| TarapurMaharashtra · site-area point (approximate) | 6 Oct 2026Latest source 16 Oct 2026Latest event 4 Feb 2026 |
| Temelin Rolls-Royce SMRSMR | Czechia | Siting | Rolls-Royce SMR | 470 MWe (net) · module |
| Temelin SMR early-works areaSouth Bohemian Region · site-area point (approximate) | 2 Oct 2026Latest source 9 Oct 2026Latest event Oct 2026 |
| Terra Innovatum SOLO first deployment at Rock City Admiral Parkway, ValmeyerMicroreactor | United States | Siting | SOLO | — |
| Rock City Admiral Parkway, ValmeyerIllinois · named site, no map pin | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Terrestrial Energy IMSR at Texas A&M-RELLISSMR | United States | Siting | IMSR (Integral Molten Salt Reactor) | — |
| Texas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate) | 9 Oct 2026Latest source: none datedLatest event 18 Jun 2026 |
| Thorcon 500, Kelasa IslandSMR | Indonesia | Siting | Thorcon 500 (TMSR500) | 500 MWe (gross/net unspecified) · plant |
| Kelasa Island (Pulau Gelasa)Bangka Belitung Islands · site-area point (approximate) | 6 Oct 2026Latest source: none datedLatest event 30 Jul 2025 |
| U-Battery first-of-a-kind siting bid at Chalk River (2019-2023)Microreactor | Canada | Siting | U-Battery | — |
| Chalk River Laboratories campus (U-Battery siting bid)Ontario · site-area point (approximate) | 3 Oct 2026Latest source: none datedLatest event: none dated |
| Valar Carbon County nuclear campus proposal (Project Beehive)SMR | United States | Siting | Design profile not linked | — |
| Valar Carbon County campus siteUtah · named site, no map pin | 13 Oct 2026Latest source, document dated 17 Sep 2026Latest event: none dated |
| Videberg Kraft Rolls-Royce SMR plant on the Värö peninsula (Ringhals)SMR | Sweden | Siting | Rolls-Royce SMR | 1410 MWe (gross/net unspecified) · plant |
| Värö peninsula next to RinghalsHalland · site-area point (approximate) | 10 Oct 2026Latest source: none datedLatest event 25 Jun 2026 |
| Westinghouse eVinci at Malmstrom Air Force Base (ANPI)Microreactor | United States | Siting | eVinci | — |
| Malmstrom Air Force BaseMontana · site-area point (approximate) | 10 Oct 2026Latest source 23 Apr 2026Latest event: none dated |
| Aalo fleet proposal at Idaho Falls Power's Energy Research ParkMicroreactor | United States | Announced | Aalo-1 | — |
| Idaho Falls Power Energy Research ParkIdaho · town-level point (approximate) | 9 Oct 2026Latest source 15 Sep 2026Latest event: none dated |
| Aalo Project Ascension power-reactor proposal at INLSMR | United States | Announced | Design profile not linked | 10 MWe (gross/net unspecified) · module |
| Project Ascension proposed area on the Aalo-X campus at INLIdaho · site-area point (approximate) | 15 Oct 2026Latest source 30 Jul 2026Latest event 4 Jul 2026 |
| ACR-300 SMR proposal at Atucha (Meitner Energy)SMR | Argentina | Announced | ACR-300 | 300 MWe (gross/net unspecified) · plant |
| Atucha nuclear power plant sitesite-area point (approximate) | 6 Oct 2026Latest source: none datedLatest event 23 Sep 2026 |
| AEP Rockport BWRX-300 proposalSMR | United States | Announced | BWRX-300 | — |
| Rockport Plant, Spencer County (I&M SMR site)Indiana · site-area point (approximate) | 10 Oct 2026Latest source 23 Jul 2026Latest event 17 Jan 2025 |
| ALFRED lead-cooled demonstrator at Mioveni (EAGLES-300 program)SMR | Romania | Announced | ALFRED lead-cooled fast-reactor demonstrator | MWe not recorded · plant · 300 MWth (nameplate; basis unspecified) |
| RATEN ICN Mioveni nuclear platformArgeș · town-level point (approximate) | 13 Oct 2026Latest source 20 Aug 2021Latest event: none dated |
| Amazon, AEP and X-energy Xe-100 plant at the former Breed station (Indiana)SMR | United States | Announced | Xe-100 | 960 MWe (gross/net unspecified) · plant |
| Former Breed Generating Station site, Sullivan CountyIndiana · named site, no map pin | 30 Oct 2026Latest source 19 Oct 2026Latest event: none dated |
| Ameren / Westinghouse SMR proposal at Callaway (2012)SMR | United States | Announced | Design profile not linked | — |
| Callaway site (Ameren Missouri)Missouri · site-area point (approximate) | 2 Oct 2026Latest source 21 Feb 2014Latest event: none dated |
| Ameresco–Terrestrial Energy IMSR at Aberdeen Proving GroundSMR | United States | Announced | IMSR (Integral Molten Salt Reactor) | — |
| Aberdeen Proving Ground (Phase 2 site)Maryland · site-area point (approximate) | 18 Oct 2026Latest source 9 Oct 2026Latest event 21 Sep 2026 |
| Antares Mark-1 electricity-producing microreactor at INLMicroreactor | United States | Announced | Design profile not linked | — |
| MFC-793 test facility, INL Materials and Fuels ComplexIdaho · site-area point (approximate) | 24 Oct 2026Latest source 27 Oct 2026Latest event 23 Oct 2026 |
| Antares R1 microreactors at Fort Bragg (Army Janus)Microreactor | United States | Announced | R1 | — |
| Fort BraggNorth Carolina · site-area point (approximate) | 10 Oct 2026Latest source: none datedLatest event: none dated |
| ARC-100 first-of-a-kind deployment framework at Idaho National LaboratorySMR | United States | Announced | ARC-100 | 100 MWe (gross/net unspecified) · module |
| Idaho National Laboratory (ARC-100 first-of-a-kind; location within INL not stated)Idaho · town-level point (approximate) | 3 Oct 2026Latest source 29 Oct 2026Latest event 29 Oct 2026 |
| ARC-100 proposal at the Port of Belledune Green Energy HubSMR | Canada | Announced | ARC-100 | — |
| Port of Belledune Green Energy HubNew Brunswick · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| BaRupOn's anticipated KRONOS MMR deployment at its Liberty, Texas campus (feasibility stage)Microreactor | United States | Announced | KRONOS MMR | — |
| BaRupOn LAMP hub, LibertyTexas · town-level point (approximate) | 3 Oct 2026Latest source: none datedLatest event: none dated |
| Beck Creek Energy SMR proposal (Amherst County)SMR | United States | Announced | Design profile not linked | — |
| Beck Creek Energy site, eastern Amherst CountyVirginia · named site, no map pin | 30 Oct 2026Latest source 8 Oct 2026Latest event: none dated |
| Belledune Prodigy transportable nuclear proposalMicroreactor | Canada | Announced | BWXT BANR | — |
| BelleduneNew Brunswick · town named, no map pin | 13 Oct 2026Latest source 5 Oct 2026Latest event 5 Oct 2026 |
| BWXT BANR at Fort Campbell (Army Janus)Microreactor | United States | Announced | BWXT BANR | 20 MWe (gross/net unspecified) · plant |
| Fort CampbellKentucky · site-area point (approximate) | 10 Oct 2026Latest source: none datedLatest event: none dated |
| Calogena NetZeroHeat CAL30 heat reactor for PierrelatteMicroreactor | France | Announced | CAL-30 | thermal only |
| Pierrelatte (Calogena proposed heat reactor)Auvergne-Rhône-Alpes · town named, no map pin | 11 Nov 2026Latest source, document dated 2 Nov 2026Latest event: none dated |
| Cambridge Atomworks ODIN prototype at Berkeley GreenMicroreactor | United Kingdom | Announced | ODIN | — |
| Berkeley Green Science and Technology ParkEngland · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Centrica / X-energy Xe-100 plant at HartlepoolSMR | United Kingdom | Announced | Xe-100 | — | Hartlepool site (EDF and Centrica)England · site-area point (approximate) | 2 Oct 2026Latest source 15 Sep 2026Latest event: none dated | |
| CGN Bohai ACPR50S floating SMR demonstration proposalSMRFrom an earlier plan | China | Announced | ACPR50S | — | Bohai Searegion only, no map pin | 2 Oct 2026Latest source 18 Jan 2016Latest event: none dated | |
| CNNC floating SMR demonstration proposal (2016)SMRFrom an earlier plan | China | Announced | ACP100S | — |
| Undisclosed | 14 Oct 2026Latest source 15 Jan 2016Latest event: none dated |
| Community Nuclear Power North Teesside AP300 proposalSMR | United Kingdom | Announced | AP300 | ≈ 1,200 MWe (derived) |
| North TeessideEngland · region only, no map pin | 1 Oct 2026Latest source: none datedLatest event 8 Feb 2024 |
| Deep Atomic MK60 AI data-center campus proposal at INLSMR | United States | Announced | MK60 | — |
| Idaho National Laboratory (proposed AI data-center campus)Idaho · town-level point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Deployable Energy–Hornbeck Unity maritime demonstration proposalMicroreactor | United States | Announced | Unity | — |
| Undisclosed | 13 Oct 2026Latest source 28 Aug 2026Latest event: none dated |
| Dominion North Anna SMR proposalSMR | United States | Announced | Design profile not linked | — |
| North Anna Power Station, Louisa CountyVirginia · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Energoatom / Holtec Rivne SMR-160 proposal (MoU-era)SMRFrom an earlier plan | Ukraine | Announced | Holtec SMR-160 | — |
| Rivne NPP — historical SMR-160 replacement proposalsite-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Energoatom SMR at the Trypilska thermal plant siteSMR | Ukraine | Announced | Design profile not linked | — |
| Trypilska thermal power plantKyiv Oblast · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| First American Nuclear EAGL-1 energy park in Indiana (site not disclosed)SMR | United States | Announced | EAGL-1 | — |
| Indianaregion only, no map pin | 11 Oct 2026Latest source 15 Apr 2026Latest event 4 Nov 2025 |
| First ELENA-AM thermoelectric heating pilot proposalSMR | Russia | Announced | ELENA-AM | — |
| Undisclosed | 13 Oct 2026Latest source Sep 2023Latest event: none dated |
| Floating nuclear power unit for Gazprom's Kirinskoye fields, SakhalinSMR | Russia | Announced | RITM-200S | 116 MWe (gross/net unspecified) · plant | Kirinskoye and Yuzhno-Kirinskoye gas-condensate fieldsSakhalin Oblast · named site, no map pin | 2 Oct 2026Latest source: none datedLatest event: none dated | |
| General Atomics GA-TES at Fort Hood (Army Janus)Microreactor | United States | Announced | GA-TES | 5 MWe (gross/net unspecified) · plant |
| Fort HoodTexas · site-area point (approximate) | 10 Oct 2026Latest source 15 Oct 2026Latest event: none dated |
| GS Energy NuScale SMR proposal at Uljin nuclear hydrogen complexSMR | South Korea | Announced | Design profile not linked | — | Not recorded | Uljin Nuclear Hydrogen National Industrial ComplexNorth Gyeongsang · named site, no map pin | 8 Oct 2026Latest source 6 May 2023Latest event: none dated |
| HAPPY200 nuclear heating project at Baishan, JilinSMR | China | Announced | HAPPY200 | thermal only |
| Baishan nuclear heating project siteJilin · town named, no map pin | 2 Oct 2026Latest source 9 Dec 2019Latest event: none dated |
| Hexana first SMR in the Gard rhodanien areaSMR | France | Announced | HEXANA | — |
| Gard rhodanienOccitanie · region only, no map pin | 5 Oct 2026Latest source: none datedLatest event: none dated |
| Holtec / EDF SMR-300 proposal at CottamSMR | United Kingdom | Announced | Holtec SMR-300 | — |
| Former Cottam power stationEngland · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Holtec Green River / Blue Castle, Utah proposalSMR | United States | Announced | Holtec SMR-300 | — |
| Green River, Blue Castle projectUtah · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event 28 May 2026 |
| Holtec Oyster Creek SMR proposalSMR | United States | Announced | Holtec SMR-300 | 1360 MWe (gross/net unspecified) · plant |
| Oyster Creek Generating Station site, Lacey TownshipNew Jersey · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event 30 Jul 2026 |
| Holtec SMR-160 proposal at Savannah River Site (2012)SMRFrom an earlier plan | United States | Announced | Holtec SMR-160 | 160 MWe (gross/net unspecified) · module |
| Savannah River SiteSouth Carolina · site-area point (approximate) | 2 Oct 2026Latest source 5 Mar 2012Latest event: none dated |
| Holtec SMR-300 proposal in Brigham City, UtahSMR | United States | Announced | Holtec SMR-300 | — |
| Brigham CityUtah · town named, no map pin | 2 Oct 2026Latest source, document dated 19 Nov 2025Latest event: none dated |
| HTGR-POLA research reactor (NCBJ)SMR | Poland | Announced | HTGR-POLA | MWe not recorded · plant · 30 MWth (nameplate; basis unspecified) |
| NCBJ Świerk site, OtwockMasovian · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Huaneng Xiapu 600 MW HTGR unit (site plan)SMR | China | Announced | Design profile not linked | — |
| Xiapu nuclear site (Changbiao Island)Fujian · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Hyperion / Gen4 Module proposal at Savannah River Site (2012)SMRFrom an earlier plan | United States | Announced | G4M | 25 MWe (gross/net unspecified) · module · 70 MWth (nameplate; basis unspecified) |
| Savannah River SiteSouth Carolina · site-area point (approximate) | 2 Oct 2026Latest source 24 Sep 2024Latest event: none dated |
| Kaliningrad floating small nuclear plants proposalSMR | Russia | Announced | Design profile not linked | — |
| Kaliningrad Oblastregion only, no map pin | 13 Oct 2026Latest source 1 Oct 2026Latest event: none dated |
| Keravan Energia / Steady Energy nuclear district-heating plantSMR | Finland | Announced | LDR-50 | thermal only |
| KeravaUusimaa · town named, no map pin | 5 Oct 2026Latest source 26 Jun 2026Latest event: none dated |
| Last Energy first KSSE plant proposalMicroreactor | Poland | Announced | Design profile not linked | 20 MWe (gross/net unspecified) · plant |
| Katowice Special Economic Zone (KSSE)region only, no map pin | 14 Oct 2026Latest source 23 Mar 2023Latest event: none dated |
| Last Energy London Gateway PWR-20 proposalMicroreactor | United Kingdom | Announced | PWR-20 | 20 MWe (gross/net unspecified) · module |
| London Gateway portsite-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event 15 Sep 2025 |
| Last Energy PWR-20 demonstrator at RATEN Mioveni (2022 plan)Microreactor | Romania | Announced | PWR-20 | — |
| RATEN ICN Mioveni nuclear platformArgeș · town-level point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Last Energy ten-SMR plant for the Legnica Special Economic Zone (2022)Microreactor | Poland | Announced | PWR-20 | 200 MWe (gross/net unspecified) · plant |
| Legnica Special Economic ZoneLower Silesia · region only, no map pin | 2 Oct 2026Latest source 23 Mar 2023Latest event: none dated |
| LEANDREA lead-cooled demonstrator at SCK CEN Mol (EAGLES-300 program)SMR | Belgium | Announced | Design profile not linked | — | SCK CEN MolAntwerp · site-area point (approximate) | 2 Oct 2026Latest source 9 Oct 2026Latest event: none dated | |
| Liaoyuan DHR-400 heating demonstration proposalSMRFrom an earlier plan | China | Announced | Yanlong DHR-400 | thermal only |
| Liaoyuan DHR-400 demonstration location (undisclosed)Jilin · town named, no map pin | 13 Oct 2026Latest source, document dated 4 Sep 2023Latest event: none dated |
| Maoming Green Energy HTGR proposal (Phase 1 planning)SMR | China | Announced | Design profile not linked | — | Not recorded | Maoming Green Energy / Zero-Carbon Industrial Park (HTGR component)Guangdong · named site, no map pin | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Meta–TerraPower initial dual-unit Natrium proposalSMR | United States | Announced | Natrium | 690 MWe (gross/net unspecified) · plant |
| Undisclosed | 13 Oct 2026Latest source 9 Jan 2026Latest event: none dated |
| Microreactor at Naval Weapons Station CraneMicroreactor | United States | Announced | Kaleidos | — |
| Naval Weapons Station CraneIndiana · site-area point (approximate) | 25 Oct 2026Latest source 20 Oct 2026Latest event 20 Oct 2026 |
| Midpoint SMR Project #1 (Sawtooth / SEDC, Jerome County)SMR | United States | Announced | Design profile not linked | — | Midpoint SMR Project #1 (Jerome County BLM)Idaho · site-area point (approximate) | 2 Oct 2026Latest source 22 Aug 2025Latest event: none dated | |
| Moltex SSR-W at Point LepreauSMR | Canada | Announced | SSR-W | — |
| Point Lepreau Nuclear Generating Station siteNew Brunswick · site-area point (approximate) | 2 Oct 2026Latest source 18 Nov 2026Latest event: none dated |
| Myanmar 110 MW SMR project (two RITM-200N; site not named)SMR | Myanmar | Announced | RITM-200N | 110 MWe (gross/net unspecified) · plant |
| Undisclosed | 6 Oct 2026Latest source 24 Aug 2026Latest event 24 Aug 2026 |
| NANO Nuclear microreactors for Digihost's North Tonawanda power plant (2024 MOU)Microreactor | United States | Announced | Design profile not linked | — |
| Digihost 60 MW power plant, North Tonawanda, New YorkNew York · site-area point (approximate) | 13 Oct 2026Latest source: none datedLatest event: none dated |
| Necsa SMR demonstration reactor at PelindabaSMR | South Africa | Announced | Design profile not linked | — |
| Necsa Pelindaba complexNorth West · site-area point (approximate) | 6 Oct 2026Latest source 31 Mar 2026Latest event: none dated |
| Nine Mile Point Gen III+ SMR early site permit evaluationSMR | United States | Announced | Design profile not linked | — |
| Nine Mile Point Clean Energy Center (advanced/SMR ESP evaluation)New York · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Ningdu multipurpose modular proposal (14th Five-Year plan)SMRFrom an earlier plan | China | Announced | Design profile not linked | 600 MWe (gross/net unspecified) · plant | Not recorded | Ningdu multipurpose modular proposal (historical plan)Jiangxi · town named, no map pin | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Norilsk land small nuclear plant (RITM-400)SMR | Russia | Announced | RITM-400 | 320 MWe (gross/net unspecified) · plant |
| Norilsk (small nuclear plant location to be selected)Krasnoyarsk Krai · town named, no map pin | 6 Oct 2026Latest source: none datedLatest event: none dated |
| Northern Halmahera floating nuclear power units (Rosatom, two FPU-100)SMR | Indonesia | Announced | Design profile not linked | 200 MWe (gross/net unspecified) · plant |
| northern Halmahera IslandNorth Maluku · region only, no map pin | 30 Oct 2026Latest source 20 Oct 2026Latest event: none dated |
| Nuclea Morpheus test reactor siting at the Utah San Rafael Energy LabMicroreactor | United States | Announced | Morpheus | — |
| Utah San Rafael Energy LabUtah · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Nuclear Power Ghana and Regnum NuScale VOYGR-12 plant (site not disclosed)SMR | Ghana | Announced | NuScale VOYGR (US460 / NPM) | 924 MWe (gross/net unspecified) · plant |
| Undisclosed | 5 Oct 2026Latest source: none datedLatest event 27 Mar 2025 |
| NuCube test microreactor at the Utah San Rafael Energy LabMicroreactor | United States | Announced | NuSun-1 | — |
| Utah San Rafael Energy LabUtah · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| NuScale plant proposal at Savannah River Site (2012)SMRFrom an earlier plan | United States | Announced | Design profile not linked | 45 MWe (gross/net unspecified) · module |
| Savannah River SiteSouth Carolina · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Oklo Aurora power for Diamondback Energy near Midland, Texas (2024 LOI)Microreactor | United States | Announced | Aurora | 50 MWe (gross/net unspecified) · plantProposed collective electricity supply under a non-binding letter of intent; this figure does not establish a selected plant or module nameplate. |
| Permian Basin operations near MidlandTexas · region only, no map pin | 2 Oct 2026Latest source: none datedLatest event: none dated |
| OSGE Warsaw potential BWRX-300 location (2023 list)SMR | Poland | Announced | BWRX-300 | — |
| Warszawa (OSGE potential location)Masovian · town named, no map pin | 2 Oct 2026Latest source 11 Feb 2025Latest event: none dated |
| Otrera precursor (first demonstration) reactor at CEA MarcouleSMR | France | Announced | Design profile not linked | — |
| CEA Marcoule centerOccitanie · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Penn State FRONTIER eVinci research proposalMicroreactor | United States | Announced | eVinci | — |
| University Park campus, Penn StatePennsylvania · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Project TETRA / TETRA-1 pilot at Texas A&M RELLISSMR | United States | Announced | IMSR (Integral Molten Salt Reactor) | — |
| Texas A&M RELLIS campus — TETRA-1 planned sitesite-area point (approximate) | 2 Oct 2026Latest source 8 Jan 2026Latest event: none dated |
| Pupuk Kaltim nuclear-powered ammonia study at BontangSMR | Indonesia | Announced | Design profile not linked | — |
| Pupuk Kaltim, BontangEast Kalimantan · site-area point (approximate) | 2 Oct 2026Latest source 19 May 2023Latest event: none dated |
| Purdue / Duke Energy SMR feasibility study for the Purdue campusSMR | United States | Announced | Design profile not linked | — |
| Purdue University campus, West LafayetteIndiana · site-area point (approximate) | 2 Oct 2026Latest source 10 May 2023Latest event: none dated |
| Pylon / LOKI MMR experiment proposal for INL's DOMEMicroreactor | United States | Announced | LOKI MMR | — |
| DOME test bed, Idaho National LaboratoryIdaho · site-area point (approximate) | 2 Oct 2026Latest source 7 Oct 2026Latest event: none dated |
| Radiant Kaleidos microreactors at Fort Benning (Army Janus)Microreactor | United States | Announced | Kaleidos | 3 MWe (gross/net unspecified) · plant |
| Fort BenningGeorgia · site-area point (approximate) | 10 Oct 2026Latest source: none datedLatest event: none dated |
| Ruijin HTR nuclear power proposal (Jiangxi)SMR | China | Announced | Design profile not linked | — | Not recorded | RuijinJiangxi · town named, no map pin | 2 Oct 2026Latest source: none datedLatest event: none dated |
| RUTA-70 reference heating unit proposal at IPPE, Obninsk (2004)SMR | Russia | Announced | RUTA-70 | 70 MWth (thermal only; nameplate; basis unspecified) | Not recorded | Institute of Physics and Power Engineering (IPPE), ObninskKaluga Oblast · site-area point (approximate) | 3 Oct 2026Latest source: none datedLatest event: none dated |
| Shearwater NuScale Wylfa feasibility proposal (2021)SMRFrom an earlier plan | United Kingdom | Announced | NuScale VOYGR (US460 / NPM) | 924 MWe (gross/net unspecified) · plant |
| Wylfa Magnox — Shearwater NuScale feasibility proposalWales · site-area point (approximate) | 2 Oct 2026Latest source 23 Sep 2021Latest event: none dated |
| Standard Power NuScale SMR facility in Ohio (site not disclosed)SMR | United States | Announced | Design profile not linked | — |
| Ohioregion only, no map pin | 5 Oct 2026Latest source: none datedLatest event 6 Oct 2023 |
| Standard Power NuScale SMR facility in Pennsylvania (site not disclosed)SMR | United States | Announced | Design profile not linked | — |
| Pennsylvaniaregion only, no map pin | 5 Oct 2026Latest source: none datedLatest event 6 Oct 2023 |
| StarCore demonstration reactor at the Whiteshell Laboratories site, PinawaSMR | Canada | Announced | Design profile not linked | — |
| Whiteshell Laboratories site, PinawaManitoba · site-area point (approximate) | 13 Oct 2026Latest source: none datedLatest event: none dated |
| Stellarium reactors for the Fos-sur-Mer integrated energy hub (2026 MoU)SMR | France | Announced | Stellarium | — |
| Fos-sur-Mer industrial area (integrated energy hub)Provence-Alpes-Côte d'Azur · named site, no map pin | 3 Oct 2026Latest source: none datedLatest event: none dated |
| Stratek Global HTMR-100 at Zilkaats EstateSMR | South Africa | Announced | HTMR-100 | 35 MWe (gross/net unspecified) · module · 100 MWth (nameplate; basis unspecified) |
| Zilkaats Estate, De Wildtnamed site, no map pin | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Surry Green Energy Center SMR campus proposalSMR | United States | Announced | Design profile not linked | — | Not recorded | Surry Green Energy Center SMR campus proposalVirginia · site-area point (approximate) | 2 Oct 2026Latest source 13 Feb 2024Latest event: none dated |
| Tata / BWXT BANR Green River, Wyoming proposalMicroreactor | United States | Announced | BWXT BANR | — |
| Tata Chemicals Soda Ash Partners site, Green RiverWyoming · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| TEPLATOR heat-only reactor for Slavutych district heatingSMR | Ukraine | Announced | TEPLATOR | thermal only |
| Slavutych district heatingKyiv Oblast · town named, no map pin | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Thorizon One first commercial molten-salt reactor in ZeelandSMR | Netherlands | Announced | Thorizon One | — |
| BorsseleZeeland · region only, no map pin | 13 Oct 2026Latest source: none datedLatest event: none dated |
| Thorizon PIONEER molten-salt demonstrator at NRG PALLAS, PettenSMR | Netherlands | Announced | Thorizon PIONEER nuclear demonstrator | — |
| NRG PALLAS site, PettenNoord-Holland · town-level point (approximate) | 13 Oct 2026Latest source 12 Nov 2026Latest event: none dated |
| Transformational Challenge Reactor microreactor test proposal at ORNL (2019)Microreactor | United States | Announced | Design profile not linked | — |
| Building 7709, Copper Ridge, Oak Ridge National LaboratoryTennessee · site-area point (approximate) | 3 Oct 2026Latest source Aug 2022Latest event: none dated |
| USNC MMR Idaho National Laboratory demonstration proposal (2020 ARDP)Microreactor | United States | Announced | Design profile not linked | — |
| USNC MMR Idaho National Laboratory demonstration proposal (site agreement undisclosed)Idaho · town-level point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| West Kalimantan Rosatom floating RITM-200M proposal (2025)SMR | Indonesia | Announced | Design profile not linked | — |
| West Kalimantanregion only, no map pin | 6 Oct 2026Latest source 19 Oct 2026Latest event: none dated |
| West Kalimantan Rosatom land-based SMR proposal (2025)SMR | Indonesia | Announced | Design profile not linked | — |
| West Kalimantanregion only, no map pin | 6 Oct 2026Latest source 3 Jul 2026Latest event: none dated |
| Westinghouse eVinci at Fort Drum (Army Janus)Microreactor | United States | Announced | eVinci | — |
| Fort DrumNew York · site-area point (approximate) | 10 Oct 2026Latest source 26 Aug 2026Latest event: none dated |
| Yantai nuclear seawater desalination project (NHR200-I, 2003)SMRFrom an earlier plan | China | Announced | Design profile not linked | thermal only | Not recorded | Yantai (site not stated)Shandong · town named, no map pin | 6 Oct 2026Latest source Sep 2005Latest event Mar 2003 |
| ZE PAK–SGE Pątnów BWRX-300 proposalSMR | Poland | Announced | BWRX-300 | — | Pątnów SMR proposal (ZE PAK)site-area point (approximate) | 2 Oct 2026Latest source 14 Oct 2026Latest event: none dated | |
| ZettaJoule ZJ0 research reactor at Texas A&M (TEES)SMR | United States | Announced | Design profile not linked | — |
| TEES Nuclear Engineering & Science Center area, College StationTexas · town-level point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| BATAN/BRIN RDE experimental reactor at Serpong (PeLUIt-40 predecessor)SMR | Indonesia | Suspended | Design profile not linked | MWe not recorded · module · 10 MWth (nameplate; basis unspecified) | Not recorded | RDE site, Puspiptek complex, SerpongBanten · named site, no map pin | 19 Oct 2026Latest source: none datedLatest event: none dated |
| CAREM-25SMR | Argentina | Suspended | CAREM-25 | 25 MWe (net) · module · 100 MWth (nameplate; basis unspecified)IAEA-RDS-2/46 lists CAREM25 at 100 MWth, 29 MWe gross and 25 MWe net. |
| CAREM site (Lima, Zárate)Buenos Aires · site-area point (approximate) | 9 Oct 2026Latest source 30 Oct 2023Latest event: none dated |
| Global First Power Chalk River MMR (paused)Microreactor | Canada | Suspended | Global First Power Micro Modular Reactor | — |
| Chalk River Laboratories site, Renfrew CountyOntario · site-area point (approximate) | 19 Oct 2026Latest source 14 Nov 2023Latest event: none dated |
| Next Generation Nuclear Plant prototype HTGR at INL (2005-2013)SMRFrom an earlier plan | United States | Suspended | Design profile not linked | — |
| Idaho National Laboratory (NGNP prototype; location within INL not fixed)Idaho · town-level point (approximate) | 19 Oct 2026Latest source Aug 2008Latest event: none dated |
| SGP Industria Rolls-Royce SMR plant (2024 decision in principle)SMR | Poland | Suspended | Rolls-Royce SMR | — |
| Świętokrzyskieregion only, no map pin | 2 Oct 2026Latest source: none datedLatest event: none dated |
| VBER-300 nuclear plant project near Aktau, Mangystau (2006)SMRFrom an earlier plan | Kazakhstan | Suspended | VBER-300 | — | Not recorded | Aktau area, Mangystau regionMangystau · town named, no map pin | 19 Oct 2026Latest source: none datedLatest event: none dated |
| Cwmni Egino small modular reactor proposal at TrawsfynyddSMR | United Kingdom | Deferred | Design profile not linked | — |
| Former Trawsfynydd nuclear power stationWales · site-area point (approximate) | 9 Oct 2026Latest source Jul 2024Latest event 3 Dec 2025 |
| Daegu i-SMR proposal at the Gunwi industrial complexSMR | South Korea | Deferred | i-SMR | 680 MWe (gross/net unspecified) · plantWorld Nuclear News states a 680 MWe plant and calls it equivalent to four 170 MW modules. |
| Gunwi advanced industrial complex (Daegu)Daegu · named site, no map pin | 19 Oct 2026Latest source: none datedLatest event 3 Feb 2026 |
| B&W mPower plan at TVA's Clinch River site (2013-2017)SMRFrom an earlier plan | United States | Canceled | mPower | — |
| Clinch River Nuclear SiteTennessee · site-area point (approximate) | 19 Oct 2026Latest source: none datedLatest event: none dated |
| Blykalla SEALER study at Hörby (withdrawn)SMR | Sweden | Canceled | SEALER | — | Stavröd, HörbySkåne · town named, no map pin | 2 Oct 2026Latest source: none datedLatest event: none dated | |
| Dimitrovgrad SVBR-100 pilot proposal (2013 land lease)SMRFrom an earlier plan | Russia | Canceled | SVBR-100 | 100 MWe (gross/net unspecified) · plant |
| DimitrovgradUlyanovsk · site-area point (approximate) | 2 Oct 2026Latest source 2024Latest event: none dated |
| eVinci DOME nuclear test reactorMicroreactor | United States | Canceled | eVinci | — |
| DOME test bed, Idaho National LaboratoryIdaho · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| GE Hitachi PRISM plutonium-reuse proposal at Sellafield (not taken forward)SMR | United Kingdom | Canceled | PRISM | 311 MWe (gross/net unspecified) · moduleThe 1 December 2011 article attributes 311 MWe to each of two units. |
| Sellafield (proposed PRISM location)England · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| PBMR demonstration power plant at Koeberg (terminated)SMR | South Africa | Canceled | PBMR (Pebble Bed Modular Reactor) | — |
| Koeberg nuclear station site (PBMR)Western Cape · site-area point (approximate) | 19 Oct 2026Latest source: none datedLatest event: none dated |
| Shenyang 2 x 200 MW nuclear heating project (NHR200-I, 2001)SMRFrom an earlier plan | China | Canceled | Design profile not linked | thermal only | Not recorded | Shenyang (site not stated)Liaoning · town named, no map pin | 6 Oct 2026Latest source 2024Latest event Apr 2001 |
| SRC initial eVinci demonstration proposal (canceled)Microreactor | Canada | Canceled | eVinci | ≈ 5 MWe (derived) |
| Saskatchewanregion only, no map pin | 14 Oct 2026Latest source 15 Apr 2026Latest event: none dated |
| Toshiba 4S proposal at Galena, Alaska (mid-2000s)SMR | United States | Canceled | 4S | 10 MWe (gross/net unspecified) · plant |
| Galena, AlaskaAlaska · town named, no map pin | 2 Oct 2026Latest source 6 May 2026Latest event: none dated |
| UAMPS Carbon Free Power Project (canceled)SMRFrom an earlier plan | United States | Canceled | NuScale VOYGR (US460 / NPM) | 462 MWe (gross/net unspecified) · plantThe WNA USA profile lists VOYGR-6 as 462 MWe and calls this project a VOYGR-6 plant. |
| INL / CFPP proposed NuScale siteIdaho · town-level point (approximate) | 19 Oct 2026Latest source, document dated 8 Nov 2023Latest event 8 Nov 2023 |
Research coverage for the 222 matching projects: of 1998 answers to nine review questions, 880 have a supported statement, 971 were reviewed with a stated limit and 147 are not reviewed yet. This counts recorded research, not readiness or the likelihood of construction.
No projects match, so there are no answers to count.
Coverage by question
Each project is asked the same nine questions: five commercial questions and four reader questions. Only completed source reviews are counted. A supported statement can describe a conditional plan or preparatory work; read it on the project page. Not disclosed, not applicable, conflicting evidence and source unavailable are reviewed limits. Not reviewed is unfinished research, not a finding that nothing exists. The counts cover every page of matching projects, not only the page shown or the projects chosen for comparison.
| Question | Supported statement | Not disclosed | Not applicable | Conflicting evidence | Source unavailable | Not reviewed | Projects |
|---|---|---|---|---|---|---|---|
| Customer or offtaker | 55 | 162 | 0 | 0 | 0 | 5 | 222 |
| Contractor | 72 | 144 | 0 | 0 | 1 | 5 | 222 |
| Funding | 82 | 136 | 0 | 0 | 0 | 4 | 222 |
| Project fuel commitment | 37 | 180 | 0 | 0 | 0 | 5 | 222 |
| Comparable schedule revision | 16 | 196 | 0 | 6 | 0 | 4 | 222 |
| Permissions and public process | 180 | 35 | 0 | 1 | 0 | 6 | 222 |
| Site dependencies (land, grid, water) | 188 | 28 | 0 | 1 | 0 | 5 | 222 |
| Spent fuel, waste and closure | 75 | 40 | 3 | 1 | 2 | 101 | 222 |
| Next decision and prerequisites | 175 | 25 | 10 | 0 | 0 | 12 | 222 |
| All nine questions | 880 | 946 | 13 | 9 | 3 | 147 | 1998 |
The address bar keeps the filters and the view, so they can be shared. From the table you can download every matching project as a CSV file or choose two to four to compare. Coverage is not a complete worldwide census: see Coverage and gaps.
Company roles are shown as recorded; an operator is not automatically a vendor. “Record reviewed” is the date of the recorded source review, not an announcement date or a guarantee that every field is current. A missing design link does not mean no design exists. A project without a map pin stays in the table; the pin line counts it. A row marked “From an earlier plan” is a proposal kept from an earlier plan, agreement, catalog or country profile; its present status is not established.